Integration of renewable energy into San Andres Island electrical grid

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 14 No. 6 (2024)

DOI
10.11591/ijece.v14i6.pp6160-6169
ISSN
2722-2578, 2088-8708
Published
2024-12-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-sa/4.0

Abstract

Renewable energy (RE) sources integration in electrical grids is changing the dynamics of planning and operation. Overvoltage, overcurrent, and malfunction of protection schemes are some effects if it is limits are not controlled. This article presents a methodology based on the hosting capacity (HC) concept to estimate performance indexes by considering stochastic methods and systematic simulation taking as study case the grid of San Andres Island. RE is of special interest in islands where diesel generators produce energy with a high footprint and security of supply is low as there is a high dependence on fossil fuels and their transport regime. The simulations are carried out in DigSilent PowerFactory integrated with Python to automate the iterations over different penetration levels. The most limiting factor found is transformer rating. Voltage rise is a factor to be monitored at the end of the circuits. Emissions are reduced with the introduction of renewable energies, but variability needs to be controlled as it could require fast start-up of generators; this modifies monitoring and control schemes to maintain stability. The limit found is higher than the established regulation for non-interconnected zones (NIZ) in Colombia, showing the capability of the grid to integrate RE.

Collaboration network of the authors

6 authors · 12 co-authorship links

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universidad Nacional de Colombia
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Santiago Toledo-CortésUniversidad Nacional de Colombia2
Juan Sebastián Lara-RamírezUniversidad Nacional de Colombia2
Fabio Augusto GonzalezUniversidad Nacional de Colombia2

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 27 Okt 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Integration of renewable energy into San Andres Island electrical grid</dc:title><dc:creator>Archbold, Keyla Newball</dc:creator><dc:creator>Zambrano, Alvaro</dc:creator><dc:creator>Rosero Garcia, Javier</dc:creator><dc:description>&lt;jats:p&gt;Renewable energy (RE) sources integration in electrical grids is changing the dynamics of planning and operation. Overvoltage, overcurrent, and malfunction of protection schemes are some effects if it is limits are not controlled. This article presents a methodology based on the hosting capacity (HC) concept to estimate performance indexes by considering stochastic methods and systematic simulation taking as study case the grid of San Andres Island. RE is of special interest in islands where diesel generators produce energy with a high footprint and security of supply is low as there is a high dependence on fossil fuels and their transport regime. The simulations are carried out in DigSilent PowerFactory integrated with Python to automate the iterations over different penetration levels. The most limiting factor found is transformer rating. Voltage rise is a factor to be monitored at the end of the circuits. Emissions are reduced with the introduction of renewable energies, but variability needs to be controlled as it could require fast start-up of generators; this modifies monitoring and control schemes to maintain stability. The limit found is higher than the established regulation for non-interconnected zones (NIZ) in Colombia, showing the capability of the grid to integrate RE.&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2024-12-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v14i6.pp6160-6169</dc:identifier><dc:identifier>10.11591/ijece.v14i6.pp6160-6169</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 14 No 6 (2024); 6160</dc:source><dc:source>2722-2578</dc:source><dc:source>2088-8708</dc:source><dc:relation>https://ijece.iaescore.com/index.php/IJECE/article/viewFile/35918/17768</dc:relation><dc:rights>http://creativecommons.org/licenses/by-sa/4.0</dc:rights></oai_dc:dc>