As of the end of 2022, Indonesia’s electrification ratio reached 99.63%, reflecting significant progress. However, the province of East Nusa Tenggara lags behind with an electrification ratio below 90%, indicating a considerable gap in energy access. This challenge is particularly evident in Oelpuah village, where frequent power outages occur due to the inadequacy of the existing 5 MW solar farm. This study proposes addressing this shortfall by expanding the solar farm capacity by an additional 4 MW. Comprehensive feasibility studies were conducted, evaluating solar radiation, natural disaster risks, and land use. The analysis, supported by PVSyst simulations, identified a suitable site with high radiation levels, though it is not entirely free from disaster risks. The design requires 13,500 solar panel modules, each with a capacity of 330 Wp, and seven 500 kW inverters. Optimal system performance is achieved with a 15-degree panel tilt and a 0-degree azimuth, aligning with the site's location south of the equator. This expansion could supply electricity to up to 4,014 households, each with a typical power usage of 0.825 kW. The study highlights the need for further research to enhance electricity coverage across Indonesia.
Jaringan kolaborasi para penulis
9 penulis ·
13 tautan kepenulisan bersama
· 3 lintas organisasi
Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.
Multimedia Nusantara University
Surya University
Organisasi berbeda
Organisasi sama
Afiliasi tidak diketahui
Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.