EVALUASI MANAJEMEN PROYEK

CommIT (Communication and Information Technology) Journal · Vol. 3 No. 2 (2009) · hlm. 82–85

DOI
10.21512/commit.v3i2.520
ISSN
2460-7010, 1979-2484
Terbit
2009-10-31
Penerbit
Bina Nusantara University
Bahasa
eng

Abstrak

The purpose of this study was to evaluate the project management and make suggestions to the problems being faced by the company. Many companies or individuals working on a project basis (project based), but many of those who do not manage the project well, even with no management at all and let the project flow as it is. Therefore, it needs a proper guidance and methods to support a project management information system. The research method used is the method of data collection, covering literature from books, articles from the internet, and study the documentation to PT ACM through direct interviews with the parties concerned with the project. The data analysis technique used is based on the 9 knowledge areas and 5 stages in project management. The results are the company’s project is proposed to be closed (closing) so as not to increase corporate spending on the project. The conclusion of this scientific work is a project run by the 2 parties have a higher risk of failure.Keywords: evaluation, management, project

Jaringan kolaborasi para penulis

17 penulis · 36 tautan kepenulisan bersama · 4 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Binus University
  • Universitas Airlangga
  • Universitas Sains dan Teknologi Jayapura
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Reza Lidia SariAfiliasi tidak diketahui1
Reza Lidia SariUniversitas Airlangga1
Gresika Tabitha VinesianUniversitas Airlangga1
Suryanto SuryantoAfiliasi tidak diketahui1
Komari KomariUniversitas Sains dan Teknologi Jayapura1
Upi Laila HanumUniversitas Sains dan Teknologi Jayapura1
Anderes GuiBinus University1
Irvan TimotiusBinus University1
Suryanto SuryantoBinus University1
Ristianto RistiantoBinus University1
Herny HernyBinus University1
Devi NathaliaBinus University1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.binus.ac.id/index.php/commit/oai, pertama di-harvest 8 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">EVALUASI MANAJEMEN PROYEK</dc:title>
	<dc:creator>Suryanto, Suryanto</dc:creator>
	<dc:creator>Gondodiyoto, Sanyoto</dc:creator>
	<dc:creator>I, Desi N</dc:creator>
	<dc:creator>Aryanto, Aryanto</dc:creator>
	<dc:creator>Triana, Elis</dc:creator>
	<dc:description xml:lang="en-US">The purpose of this study was to evaluate the project management and make suggestions to the problems being faced by the company. Many companies or individuals working on a project basis (project based), but many of those who do not manage the project well, even with no management at all and let the project flow as it is. Therefore, it needs a proper guidance and methods to support a project management information system. The research method used is the method of data collection, covering literature from books, articles from the internet, and study the documentation to PT ACM through direct interviews with the parties concerned with the project. The data analysis technique used is based on the 9 knowledge areas and 5 stages in project management. The results are the company’s project is proposed to be closed (closing) so as not to increase corporate spending on the project. The conclusion of this scientific work is a project run by the 2 parties have a higher risk of failure.Keywords: evaluation, management, project</dc:description>
	<dc:publisher xml:lang="en-US">Bina Nusantara University</dc:publisher>
	<dc:date>2009-10-31</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.binus.ac.id/index.php/commit/article/view/520</dc:identifier>
	<dc:identifier>10.21512/commit.v3i2.520</dc:identifier>
	<dc:source xml:lang="en-US">CommIT (Communication and Information Technology) Journal; Vol. 3 No. 2 (2009): CommIT Journal; 82-85</dc:source>
	<dc:source>2460-7010</dc:source>
	<dc:source>1979-2484</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journal.binus.ac.id/index.php/commit/article/view/520/498</dc:relation>
</oai_dc:dc>