Mapping of lamtoro field in supporting the co-firing of steam power plants program

International Journal of Applied Power Engineering (IJAPE) · Vol. 12 No. 1 (2023) · hlm. 37–48

DOI
10.11591/ijape.v12.i1.pp37-48
ISSN
2722-2624, 2252-8792
Terbit
2023-03-01
Penerbit
Institute of Advanced Engineering and Science
Bahasa
eng
Lisensi
creativecommons.org/licenses/by-sa/4.0

Abstrak

The policy of renewable energy in Indonesia is expressed in the government regulation no. 79 in 2014 regarding the national energy policy. In the document, renewable energy is targeted to reach 23% in 2025, and a minimum of 31% in 2050. One of the developed renewable energies is biomass which is produced by lamtoro, a plant which has been employed as a mixture in coal at Anggrek steam power plant 2×25 MW Gorontalo. As much of 1% to 5% of lamtoro is added in 1,000 ton of coal per day. The research aims to create a thematic map of the distribution of lamtoro to meet the need of co-firing at Anggrek steam power plant. The result of research shows the total area of field which has been planted with lamtoro is 69,074 ha, scattered in 14 districts. Meanwhile the largest area is Kabila Bone district (22,070 ha), and the smallest area is East Bulango district (0.228 ha). The estimated potential of lamtoro in 14 districts of Bone Bolango regency is about 916,439.86 ton/ha/year.

Kata kunci

Jaringan kolaborasi para penulis

11 penulis · 18 tautan kepenulisan bersama · 3 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • State University of Gorontalo
  • University of Colorado Boulder
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Niniek PratiwiState University of Gorontalo2
Zhiqiang John ZhaiUniversity of Colorado Boulder2
Mohamad Ridho Ferdiyanto ThalibState University of Gorontalo1
Sri Sutarni ArifinState University of Gorontalo1
Muchlis PolinState University of Gorontalo1
Ade Irawaty TolagoState University of Gorontalo1
Iskandar Zulkarnain NasibuState University of Gorontalo1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) http://ijape.iaescore.com/index.php/IJAPE/oai, pertama di-harvest 8 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Mapping of lamtoro field in supporting the co-firing of steam power plants program</dc:title>
	<dc:creator>Mohamad, Yasin</dc:creator>
	<dc:creator>Salim, Sardi</dc:creator>
	<dc:creator>Amali, Lanto Mohamad Kamil</dc:creator>
	<dc:creator>Djafar, Abdi Gunawan</dc:creator>
	<dc:subject xml:lang="en-US">biomass; co-firing; lamtoro; mapping; renewable energy</dc:subject>
	<dc:description xml:lang="en-US">The policy of renewable energy in Indonesia is expressed in the government regulation no. 79 in 2014 regarding the national energy policy. In the document, renewable energy is targeted to reach 23% in 2025, and a minimum of 31% in 2050. One of the developed renewable energies is biomass which is produced by lamtoro, a plant which has been employed as a mixture in coal at Anggrek steam power plant 2×25 MW Gorontalo. As much of 1% to 5% of lamtoro is added in 1,000 ton of coal per day. The research aims to create a thematic map of the distribution of lamtoro to meet the need of co-firing at Anggrek steam power plant. The result of research shows the total area of field which has been planted with lamtoro is 69,074 ha, scattered in 14 districts. Meanwhile the largest area is Kabila Bone district (22,070 ha), and the smallest area is East Bulango district (0.228 ha). The estimated potential of lamtoro in 14 districts of Bone Bolango regency is about 916,439.86 ton/ha/year.</dc:description>
	<dc:publisher xml:lang="en-US">Institute of Advanced Engineering and Science</dc:publisher>
	<dc:contributor xml:lang="en-US"></dc:contributor>
	<dc:date>2023-03-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US"></dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ijape.iaescore.com/index.php/IJAPE/article/view/20530</dc:identifier>
	<dc:identifier>10.11591/ijape.v12.i1.pp37-48</dc:identifier>
	<dc:source xml:lang="en-US">International Journal of Applied Power Engineering (IJAPE); Vol 12, No 1: March 2023; 37-48</dc:source>
	<dc:source>2722-2624</dc:source>
	<dc:source>2252-8792</dc:source>
	<dc:source>10.11591/ijape.v12.i1</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ijape.iaescore.com/index.php/IJAPE/article/view/20530/13046</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2023 Yasin Mohamad, Yasin Mohamad, Sardi Salim, Lanto Mohamad Kamil Amali, Abdi Gunawan Djafar</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by-sa/4.0</dc:rights>
</oai_dc:dc>