Optimal operating scenario for Polerood hydropower station to maximize peak shaving and produced profit

International Journal of Renewable Energy Development : JRED · Vol. 7 No. 3 (2018) · hlm. 233–239

DOI
10.14710/ijred.7.3.233-239
ISSN
2252-4940
Terbit
2018-12-15
Penerbit
Center of Biomass & Renewable Energy (CBIORE)
Bahasa
eng
Lisensi
creativecommons.org/licenses/by-sa/4.0

Abstrak

This paper deals with the optimization of the daily operation of Polerood hydropower station being constructed in the north of Iran. Dynamic Programming method (DP) is applied as the preferred optimization tool owing to the fact that it guarantees the optimal solution and is applicable to the present problem. Produced profit and peak-shaving are the two objectives considered separately in this study. The results show that the optimal water management of the case study through charging and discharging the reservoir at the appropriate times led to 4% increase in the produced profit. In another part of this study, the optimal performance strategies regarding to the two objectives (produced profit and peak-shaving) are compared. The observed similarity between the two performance strategies implies the substantial dependence of the electricity price and the network demand level. The paper ends with the profitability study of the project and the sensitivity analysis of the results to various economic parameters. Article History: Received December 15th 2017; Received in revised form April 18th 2018; Accepted September 16th 2018; Available onlineHow to Cite This Article: Feshalami, B.F. (2018) Optimal Operating Scenario for Polerood Hydropower Station to Maximize Peak Shaving and Produced Profit. International Journal of Renewable Energy Development, 7(3), 233-239.https://doi.org/10.14710/ijred.7.3.233-239

Kata kunci

Jaringan kolaborasi para penulis

3 penulis · 3 tautan kepenulisan bersama · 2 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Ferdowsi University of Mashhad
  • Eqbal Lahoori Institute of Higher Education
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Kamyar JafariEqbal Lahoori Institute of Higher Education1
Mohammad Hassan DjavareshkianFerdowsi University of Mashhad1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://ijred.cbiore.id/index.php/ijred/oai, pertama di-harvest 8 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Optimal operating scenario for Polerood hydropower station to maximize peak shaving and produced profit</dc:title>
	<dc:creator>Forouzi Feshalami, Behzad</dc:creator>
	<dc:subject xml:lang="en-US">Polerood Hydropower Station; Performance Optimization; Dynamic Programming Method; Profit; Peak Shaving</dc:subject>
	<dc:description xml:lang="en-US">This paper deals with the optimization of the daily operation of Polerood hydropower station being constructed in the north of Iran. Dynamic Programming method (DP) is applied as the preferred optimization tool owing to the fact that it guarantees the optimal solution and is applicable to the present problem. Produced profit and peak-shaving are the two objectives considered separately in this study. The results show that the optimal water management of the case study through charging and discharging the reservoir at the appropriate times led to 4% increase in the produced profit. In another part of this study, the optimal performance strategies regarding to the two objectives (produced profit and peak-shaving) are compared. The observed similarity between the two performance strategies implies the substantial dependence of the electricity price and the network demand level. The paper ends with the profitability study of the project and the sensitivity analysis of the results to various economic parameters. Article History: Received December 15th 2017; Received in revised form April 18th 2018; Accepted September 16th 2018; Available onlineHow to Cite This Article: Feshalami, B.F. (2018) Optimal Operating Scenario for Polerood Hydropower Station to Maximize Peak Shaving and Produced Profit. International Journal of Renewable Energy Development, 7(3), 233-239.https://doi.org/10.14710/ijred.7.3.233-239</dc:description>
	<dc:publisher xml:lang="en-US">Center of Biomass &amp; Renewable Energy (CBIORE)</dc:publisher>
	<dc:contributor xml:lang="en-US"></dc:contributor>
	<dc:date>2018-12-15</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US"></dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ijred.cbiore.id/index.php/ijred/article/view/15591</dc:identifier>
	<dc:identifier>10.14710/ijred.7.3.233-239</dc:identifier>
	<dc:source xml:lang="en-US">International Journal of Renewable Energy Development; Vol 7, No 3 (2018): October 2018; 233-239</dc:source>
	<dc:source>2252-4940</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ijred.cbiore.id/index.php/ijred/article/view/15591/pdf</dc:relation>
	<dc:rights xml:lang="en-US">https://creativecommons.org/licenses/by-sa/4.0</dc:rights>
</oai_dc:dc>