Akses terbuka
Jurnal
SINTA 1
Economic Analysis and Performance of PV Plants: An Application in Kurdistan Region of Iraq
International Journal of Renewable Energy Development : JRED · Vol. 8 No. 3 (2019) · hlm. 293–301
ISSN 2252-4940
Terbit 2019-10-27
Penerbit Center of Biomass & Renewable Energy (CBIORE)
Bahasa eng
Abstrak
In this study, photovoltaic (PV) technology development over the years is reviewed. The use of PV power plants to solve inadequate power supply in Kurdistan is also analysed. PV power application is one of the most developed renewable energy applications but still not commercialized in somw countries. In this paper, three different locations will be evaluated in Kurdistan for PV plant installation. The research will investigate the best location for PV plant installation in Kurdistan, check the viability of the proposed plants and compare the performance of a fixed and a double axis tracking system. A 10 MW PV plant is developed and simulated based on economic terms. The results from the analysis shows that the simple payback period for a 10 MW PV plant in all the locations considered is between 6.8 and 7.2 years. Also, the installation with two-axis tracking system gave the lowest simple payback period (6.8 years). The PV plant is viable considering other economic indicators like; IRR, NPV, annual life cycle savings and BCR. The yearly savings of the system for one of the locations considered is US$1,573,327 with a dual axis tracking system. ©2019. CBIORE-IJRED. All rights reserved
Jaringan kolaborasi para penulis
5 penulis ·
10 tautan kepenulisan bersama
· 4 lintas organisasi
Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.
Cyprus International University University of Electronic Science and Technology of China
Organisasi berbeda
Organisasi sama
Afiliasi tidak diketahui
Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulis Organisasi Artikel bersama
Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.
Sumber metadata: OAI-PMH (metadata jurnal) https://ijred.cbiore.id/index.php/ijred/oai, pertama di-harvest 8 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
<dc:title xml:lang="en-US">Economic Analysis and Performance of PV Plants: An Application in Kurdistan Region of Iraq</dc:title>
<dc:creator>Bamisile, Olusola</dc:creator>
<dc:creator>Olubiyo, Foyin</dc:creator>
<dc:creator>Dagbasi, Mustafa</dc:creator>
<dc:creator>Adun, Humphrey</dc:creator>
<dc:creator>Wole-Osho, Ifeoluwa</dc:creator>
<dc:subject xml:lang="en-US">Energy; Photovoltaics; Economic Analysis; Kurdistan</dc:subject>
<dc:description xml:lang="en-US">In this study, photovoltaic (PV) technology development over the years is reviewed. The use of PV power plants to solve inadequate power supply in Kurdistan is also analysed. PV power application is one of the most developed renewable energy applications but still not commercialized in somw countries. In this paper, three different locations will be evaluated in Kurdistan for PV plant installation. The research will investigate the best location for PV plant installation in Kurdistan, check the viability of the proposed plants and compare the performance of a fixed and a double axis tracking system. A 10 MW PV plant is developed and simulated based on economic terms. The results from the analysis shows that the simple payback period for a 10 MW PV plant in all the locations considered is between 6.8 and 7.2 years. Also, the installation with two-axis tracking system gave the lowest simple payback period (6.8 years). The PV plant is viable considering other economic indicators like; IRR, NPV, annual life cycle savings and BCR. The yearly savings of the system for one of the locations considered is US$1,573,327 with a dual axis tracking system. ©2019. CBIORE-IJRED. All rights reserved</dc:description>
<dc:publisher xml:lang="en-US">Center of Biomass & Renewable Energy (CBIORE)</dc:publisher>
<dc:contributor xml:lang="en-US"></dc:contributor>
<dc:date>2019-10-27</dc:date>
<dc:type>info:eu-repo/semantics/article</dc:type>
<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
<dc:type xml:lang="en-US"></dc:type>
<dc:format>application/pdf</dc:format>
<dc:identifier>https://ijred.cbiore.id/index.php/ijred/article/view/22985</dc:identifier>
<dc:identifier>10.14710/ijred.8.3.293-301</dc:identifier>
<dc:source xml:lang="en-US">International Journal of Renewable Energy Development; Vol 8, No 3 (2019): October 2019; 293-301</dc:source>
<dc:source>2252-4940</dc:source>
<dc:language>eng</dc:language>
<dc:relation>https://ijred.cbiore.id/index.php/ijred/article/view/22985/pdf</dc:relation>
<dc:rights xml:lang="en-US">https://creativecommons.org/licenses/by-sa/4.0</dc:rights>
</oai_dc:dc>
Sitasi dan pengindeksan
Jumlah menurut tiap indeks pada 13 Nov 2026; setiap indeks menghitung sitasi dengan cara berbeda.
OpenAlex juga mencatat karya ini di: crossref, doaj.
Sitasi artikel ini
APA 7
Bamisile, O., Olubiyo, F., Dagbasi, M., Adun, H., & Wole-Osho, I. (2019). Economic Analysis and Performance of PV Plants: An Application in Kurdistan Region of Iraq. International Journal of Renewable Energy Development : JRED, 8(3), 293–301. https://doi.org/10.14710/ijred.8.3.293-301
Salin
IEEE
O. Bamisile, F. Olubiyo, M. Dagbasi, H. Adun, and I. Wole-Osho, “Economic Analysis and Performance of PV Plants: An Application in Kurdistan Region of Iraq,” International Journal of Renewable Energy Development : JRED, vol. 8, no. 3, pp. 293–301, 2019, doi: 10.14710/ijred.8.3.293-301.
Salin
Dibuat dari metadata jurnal; periksa nama penulis sebelum dipakai.