Analisis Perbandingan Penggunaan Quarry Abeli Dan Quarry Simbo Berdasarkan Waktu Dan Biaya (Studi Kasus: Proyek Pembuatan Jalan Inspeksi Bandar Udara Haluoelo)

Media Konstruksi : Jurnal Ilmiah Teknik Sipil · Vol. 8 No. 2 (2023) · hlm. 95–100

DOI
10.33772/jmk.v8i2.32659
ISSN
2503-2712
Terbit
2023-07-04
Penerbit
PRODI D3 TEKNIK SIPIL
Bahasa
eng
Lisensi
creativecommons.org/licenses/by/4.0

Abstrak

Optimization of construction projects is very important because many projects have had their work schedule stopped due to funding problems and soaring material prices. One type of project that is of concern in terms of cost optimization is a road pavement project. This huge cost is inseparable from the procurement of the materials needed for road construction, what's more, quarry materials are not available around the project site and to bring in these materials is increasingly expensive. The purpose of this study is to analyze how to compare costs and compare the duration of time required between the use of the Abeli Quarry and the Simbo Quarry. Based on the calculation results, the time needed to replace subgrade using simbo quarry is done by 1 person the foreman, 10 units of dump trucks and 1 unit of excavator is 14 days while for abeli quarry with the same number of workers and equipment it can be done in 28 days. Based on the results of the calculation of the budget plan, the cost required for subgrade replacement work using quarry simbo is Rp. 538,102,160.00 while for the abeli quarry it is Rp. 1,048,254,320.00 with a difference of Rp. 510,152,160.00. The duration of time needed for subgrade replacement work using abeli quarry is 28 days while for simbo quarry is 14 days. Where the difference in time is 14 days with a comparison percentage of 50%.Optimalisasi pada proyek konstruksi menjadi sangat penting karena banyak proyek yang jadwal pekerjaannya dihentikan karena masalah dana dan harga material yang melonjak. Salah satu jenis proyek yang menjadi perhatian dalam hal pengoptimalisasian biaya adalah proyek perkerasan jalan (pavement). Biaya yang besar ini tidak terlepas dari pengadaan material yang dibutuhkan untuk pembangunan jalan apa lagi quarry material tidak tersedia disekitar lokasi proyek dan untuk mendatangkan material-material itu semakin mahal. Adapun tujuan penelitian ini, yaitu Untuk menganalisa Bagaimana perbandingan biaya dan perbandingan durasi waktu yang dibutuhkan antara quarry abeli dan quarry simbo. Berdasarkan hasil perhitungan, waktu yang dibutuhkan Pada penggantian tanah dasar dengan mengunakan quarry simbo yang dikerjakan oleh 1 orang mandor, 10 unit dump truck dan 1 unit excavator adalah 14 hari sedangkan untuk quarry abeli dengan jumlah pekerja dan peralatan yang sama dapat dikerjakan dalam waktu 28 hari. Berdasarkan hasil perhitungan rencana anggaran biaya, biaya yang dibutuhkan perkerjaan penggantian tanah dasar dengan menggunakan quarry simbo adalah Rp. 538.102.160,00 sedangkan untuk quarry abeli adalah Rp.1.048.254.320,00 dengan selisih sebesar Rp.510.152.160,00. Durasi waktu yang dibutuhkan untuk pekerjaan penggantian tanah dasar menggunakan quarry abeli yakni 28 hari sedangkan untuk quarry simbo yakni 14 hari. Dimana selisih waktunya yakni 14 hari dengan persentase perbandingan 50%.

Jaringan kolaborasi para penulis

40 penulis · 120 tautan kepenulisan bersama · 3 lintas organisasi · menampilkan 40 yang paling banyak terhubung

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Universitas Halu Oleo
  • Universitas Sembilanbelas November Kolaka
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Umran SaritaAfiliasi tidak diketahui10
Siti Nurjanah AhmadUniversitas Halu Oleo6
Wayan MustikaAfiliasi tidak diketahui4
Nasrul NasrulAfiliasi tidak diketahui4
La WelendoAfiliasi tidak diketahui3
Anafi MinmahddunUniversitas Halu Oleo2
La Ode Muhamad Nurrakhmad ArsyadUniversitas Halu Oleo2
Baso MursidiAfiliasi tidak diketahui2
Muh Thahir AzikinAfiliasi tidak diketahui2
RIdwansyah NuhunAfiliasi tidak diketahui2
Minson SimatupangUniversitas Halu Oleo2
M. HasinuddinAfiliasi tidak diketahui2
Muhammad Handy Dwi AdityawanAfiliasi tidak diketahui2
Masdiana MasdianaUniversitas Halu Oleo2
La TaenaAfiliasi tidak diketahui1
Hj. Wa Kuasa BakaAfiliasi tidak diketahui1
Try SugiyartoAfiliasi tidak diketahui1
Adrianto YusufAfiliasi tidak diketahui1
Azman AzmanAfiliasi tidak diketahui1
Aloysius A. Prima MangiriAfiliasi tidak diketahui1
Sultan Machmud Hasan MasikkiAfiliasi tidak diketahui1
Evy YusufAfiliasi tidak diketahui1
Try Sugiyarto SoeparyantoUniversitas Halu Oleo1
Laode Mulia RasiAfiliasi tidak diketahui1
Rika Fitriani MallaAfiliasi tidak diketahui1
Aprijal Mukti LalumbuAfiliasi tidak diketahui1
Romy S. E. TamburakaAfiliasi tidak diketahui1
Juprianto JupriantoAfiliasi tidak diketahui1
Sitti Kosma AsmatunAfiliasi tidak diketahui1
Aksar AksarAfiliasi tidak diketahui1
Karsata HaafiAfiliasi tidak diketahui1
Mursalim Ninoy La OlaAfiliasi tidak diketahui1
Ibnu RamadhanAfiliasi tidak diketahui1
Mega Dwi AnitaAfiliasi tidak diketahui1
Fathur Rahman RustanUniversitas Sembilanbelas November Kolaka1
Tajri TajriAfiliasi tidak diketahui1
Agustan AgustanUniversitas Halu Oleo1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://ojs.uho.ac.id/index.php/MedKons/oai, pertama di-harvest 8 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Analisis Perbandingan Penggunaan Quarry Abeli Dan Quarry Simbo Berdasarkan Waktu Dan Biaya (Studi Kasus : Proyek Pembuatan Jalan Inspeksi Bandar Udara Haluoelo)</dc:title>
	<dc:creator>Rajab, Abdul</dc:creator>
	<dc:creator>Sulha, Sulha</dc:creator>
	<dc:creator>Fitriah, Fitriah</dc:creator>
	<dc:description xml:lang="en-US">Optimization of construction projects is very important because many projects have had their work schedule stopped due to funding problems and soaring material prices. One type of project that is of concern in terms of cost optimization is a road pavement project. This huge cost is inseparable from the procurement of the materials needed for road construction, what's more, quarry materials are not available around the project site and to bring in these materials is increasingly expensive. The purpose of this study is to analyze how to compare costs and compare the duration of time required between the use of the Abeli Quarry and the Simbo Quarry. Based on the calculation results, the time needed to replace subgrade using simbo quarry is done by 1 person the foreman, 10 units of dump trucks and 1 unit of excavator is 14 days while for abeli quarry with the same number of workers and equipment it can be done in 28 days. Based on the results of the calculation of the budget plan, the cost required for subgrade replacement work using quarry simbo is Rp. 538,102,160.00 while for the abeli quarry it is Rp. 1,048,254,320.00 with a difference of Rp. 510,152,160.00. The duration of time needed for subgrade replacement work using abeli quarry is 28 days while for simbo quarry is 14 days. Where the difference in time is 14 days with a comparison percentage of 50%.Optimalisasi pada proyek konstruksi menjadi sangat penting karena banyak proyek yang jadwal pekerjaannya dihentikan karena masalah dana dan harga material yang melonjak. Salah satu jenis proyek yang menjadi perhatian dalam hal pengoptimalisasian biaya adalah proyek perkerasan jalan (pavement). Biaya yang besar ini tidak terlepas dari pengadaan material yang dibutuhkan untuk pembangunan jalan apa lagi quarry material tidak tersedia disekitar lokasi proyek dan untuk mendatangkan material-material itu semakin mahal. Adapun tujuan penelitian ini, yaitu Untuk menganalisa Bagaimana perbandingan biaya dan perbandingan durasi waktu yang dibutuhkan antara quarry abeli dan quarry simbo. Berdasarkan hasil perhitungan, waktu yang dibutuhkan Pada penggantian tanah dasar dengan mengunakan quarry simbo yang dikerjakan oleh 1 orang mandor, 10 unit dump truck dan 1 unit excavator adalah 14 hari sedangkan untuk quarry abeli dengan jumlah pekerja dan peralatan yang sama dapat dikerjakan dalam waktu 28 hari. Berdasarkan hasil perhitungan rencana anggaran biaya, biaya yang dibutuhkan perkerjaan penggantian tanah dasar dengan menggunakan quarry simbo adalah Rp. 538.102.160,00 sedangkan untuk quarry abeli adalah Rp.1.048.254.320,00 dengan selisih sebesar Rp.510.152.160,00. Durasi waktu yang dibutuhkan untuk pekerjaan penggantian tanah dasar menggunakan quarry abeli yakni 28 hari sedangkan untuk quarry simbo yakni 14 hari. Dimana selisih waktunya yakni 14 hari dengan persentase perbandingan 50%.</dc:description>
	<dc:publisher xml:lang="en-US">PRODI D3 TEKNIK SIPIL</dc:publisher>
	<dc:contributor xml:lang="en-US"></dc:contributor>
	<dc:date>2023-07-04</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs.uho.ac.id/index.php/MedKons/article/view/32659</dc:identifier>
	<dc:identifier>10.33772/jmk.v8i2.32659</dc:identifier>
	<dc:source xml:lang="en-US">Media Konstruksi : Jurnal Ilmiah Teknik Sipil; Vol 8, No 2 (2023); 95-100</dc:source>
	<dc:source>2503-2712</dc:source>
	<dc:source>10.33772/jmk.v8i2</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs.uho.ac.id/index.php/MedKons/article/view/32659/18622</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2023 Media Konstruksi : Jurnal Ilmiah Teknik Sipil</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>