Melola Discovery

← Melola Discovery

Jurnal Tanpa peringkat SINTA

ANALISIS PRODUKTIVITAS TENAGA KERJA PADA KONSTRUKSI PEMASANGAN BATU BATA

Media Konstruksi : Jurnal Ilmiah Teknik Sipil · Vol. 3 No. 2 (2018)

DOI
10.33772/jmk.v3i2.27209
ISSN
2503-2712
Terbit
2018-07-01
Penerbit
PRODI D3 TEKNIK SIPIL
Bahasa
eng

Abstrak

Abstract Human Resources is one of the most decisive factors in a job, including in a construction work. A small job supports not supported by good human resources in terms of quality and productivity, will not provide maximum and satisfactory results in a project.This study aims to learn about how to improve work productivity in brick pairs by using tools and not using tools and to learn how to use Bricky tools in brick installation.The results of the study showed that the results of the work of the pair of bricks in the three research sites were won by SNI, using a brick attachment tool and not. Based on the percentage of performance with SNI (100%) then at location I with a performance percentage of 80%, location II with a percentage of 110%, while location III with a percentage of 70%. With this value, it is necessary to compare it when using the brick installation tool, then the percentage is 120%. Abstrak Sumber Daya Manusia adalah salah satu faktor yang sangat berpengaruh dalam sebuah pekerjaan, termasuk dalam sebuah pekerjaan kontruksi. Sebuah pekerjaan sekecil apapun apabila tidak didukung dengan sumber daya manusia yang bagus dalam hal kualitas dan produktivitas, tidak akan memberikan hasil yang maksimal dan memuaskan dalam sebuah proyek.Penelitian ini bertujuan untuk mengetahui untuk mengetahui perbedaan tingkat produktivitas tenaga kerja pada pekerjaan pasangan batu bata dengan menggunakan alat bantu dan tidak menggunakan alat bantu dan untuk mengetahui efektivitas pemakaian alat bantu Bricky dalam pemasangan batu bata.Hasil penelitian menunjukkan bahwa tingkat produktivitas tenaga kerja pada pekerjaan pasangan batu bata di tiga lokasi penelitian dengan mengacu pada SNI, menggunakan alat bantu pasang bata dan tidak. Berdasarkan persentase kinerja dengan SNI (100%) maka pada lokasi I dengan persentase kinerja 80 %, lokasi II dengan persentase 110 %, sedangkan lokasi III dengan persentase 70%. Dengan nilai tersebut maka jika dibandingkan dengan kinerja saat menggunakan alat bantu pasang bata maka didapat persentase 120%.

Jaringan kolaborasi para penulis

40 penulis · 117 tautan kepenulisan bersama · 14 lintas organisasi · menampilkan 40 yang paling banyak terhubung

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Universitas Halu Oleo
  • Universitas Sulawesi Tenggara
  • Poltekkes Kemenkes Palu
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Umran SaritaAfiliasi tidak diketahui7
Siti Nurjanah AhmadUniversitas Halu Oleo5
Fitriah FitriahAfiliasi tidak diketahui4
La WelendoAfiliasi tidak diketahui3
Nasrul NasrulPoltekkes Kemenkes Palu3
Hasmina Tari MokuiUniversitas Halu Oleo2
Anafi MinmahddunUniversitas Halu Oleo2
La Ode Muhamad Nurrakhmad ArsyadUniversitas Halu Oleo2
Wayan MustikaAfiliasi tidak diketahui2
Muh Thahir AzikinAfiliasi tidak diketahui2
RIdwansyah NuhunAfiliasi tidak diketahui2
Masykur KimsanAfiliasi tidak diketahui2
Anrias AnriasUniversitas Halu Oleo1
Febriansyah ArsyadUniversitas Sulawesi Tenggara1
Hasir HasirUniversitas Halu Oleo1
Muh Wonua Bhakti AlsonUniversitas Sulawesi Tenggara1
Nanda Ayu PratiwiUniversitas Sulawesi Tenggara1
Romy TamburakaAfiliasi tidak diketahui1
Try SugiyartoAfiliasi tidak diketahui1
Adrianto YusufAfiliasi tidak diketahui1
Muhammad Handy Dwi AdityawanAfiliasi tidak diketahui1
Masdiana MasdianaUniversitas Halu Oleo1
Azman AzmanAfiliasi tidak diketahui1
Aloysius A. Prima MangiriAfiliasi tidak diketahui1
Sultan Machmud Hasan MasikkiAfiliasi tidak diketahui1
Evy YusufAfiliasi tidak diketahui1
Try Sugiyarto SoeparyantoUniversitas Halu Oleo1
Laode Mulia RasiAfiliasi tidak diketahui1
Aprijal Mukti LalumbuAfiliasi tidak diketahui1
Romy S. E. TamburakaAfiliasi tidak diketahui1
Juprianto JupriantoAfiliasi tidak diketahui1
Sitti Kosma AsmatunAfiliasi tidak diketahui1
Aksar AksarAfiliasi tidak diketahui1
Karsata HaafiAfiliasi tidak diketahui1
Mursalim Ninoy La OlaAfiliasi tidak diketahui1
Ibnu RamadhanAfiliasi tidak diketahui1
Mega Dwi AnitaAfiliasi tidak diketahui1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://ojs.uho.ac.id/index.php/MedKons/oai, pertama di-harvest 8 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">ANALISIS PRODUKTIVITAS TENAGA KERJA PADA KONSTRUKSI PEMASANGAN BATU BATA</dc:title>
	<dc:creator>Firon, Andi</dc:creator>
	<dc:creator>Simatupang, Minson</dc:creator>
	<dc:creator>Sulha, Sulha</dc:creator>
	<dc:description xml:lang="en-US"> Abstract Human Resources is one of the most decisive factors in a job, including in a construction work. A small job supports not supported by good human resources in terms of quality and productivity, will not provide maximum and satisfactory results in a project.This study aims to learn about how to improve work productivity in brick pairs by using tools and not using tools and to learn how to use Bricky tools in brick installation.The results of the study showed that the results of the work of the pair of bricks in the three research sites were won by SNI, using a brick attachment tool and not. Based on the percentage of performance with SNI (100%) then at location I with a performance percentage of 80%, location II with a percentage of 110%, while location III with a percentage of 70%. With this value, it is necessary to compare it when using the brick installation tool, then the percentage is 120%.  Abstrak Sumber Daya  Manusia adalah  salah  satu faktor  yang sangat  berpengaruh dalam sebuah pekerjaan, termasuk  dalam sebuah pekerjaan  kontruksi. Sebuah pekerjaan sekecil apapun  apabila tidak didukung  dengan sumber daya  manusia yang  bagus dalam hal kualitas dan produktivitas, tidak akan memberikan  hasil yang maksimal dan memuaskan  dalam sebuah  proyek.Penelitian ini bertujuan untuk mengetahui untuk mengetahui perbedaan tingkat produktivitas tenaga kerja pada pekerjaan pasangan batu bata dengan menggunakan alat bantu dan tidak menggunakan alat bantu dan untuk mengetahui efektivitas pemakaian alat bantu Bricky dalam pemasangan batu bata.Hasil penelitian menunjukkan bahwa tingkat produktivitas  tenaga kerja pada pekerjaan pasangan batu bata  di tiga lokasi penelitian dengan mengacu pada SNI, menggunakan alat bantu pasang bata dan tidak. Berdasarkan persentase kinerja dengan SNI (100%) maka pada lokasi I dengan persentase kinerja 80 %, lokasi II dengan persentase 110 %, sedangkan lokasi III dengan persentase 70%. Dengan nilai tersebut maka jika dibandingkan dengan kinerja saat menggunakan alat bantu pasang bata maka didapat persentase 120%. </dc:description>
	<dc:publisher xml:lang="en-US">PRODI D3 TEKNIK SIPIL</dc:publisher>
	<dc:contributor xml:lang="en-US"></dc:contributor>
	<dc:date>2018-07-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs.uho.ac.id/index.php/MedKons/article/view/27209</dc:identifier>
	<dc:identifier>10.33772/jmk.v3i2.27209</dc:identifier>
	<dc:source xml:lang="en-US">Media Konstruksi : Jurnal Ilmiah Teknik Sipil; Vol 3, No 2 (2018): MedKons</dc:source>
	<dc:source>2503-2712</dc:source>
	<dc:source>10.33772/jmk.v3i2</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs.uho.ac.id/index.php/MedKons/article/view/27209/15854</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2022 MEDIA KONSTRUKSI</dc:rights>
</oai_dc:dc>