Jurnal
SINTA 1
Proposed Improvement of Facility Layout in Production Area in Ud. Arshaindo Using the From To Chart (FTC) Method
Journal of Applied Engineering and Technological Science (JAETS) · Vol. 4 No. 1 (2022) · hlm. 333–341
ISSN 2715-6079, 2715-6087
Terbit 2022-10-31
Penerbit Yayasan Riset dan Pengembangan Intelektual (YRPI)
Bahasa en
Abstrak
Small and medium industry engaged in fast food. Currently, the layout of the facilities at the production site is experiencing problems related to the distance of material movement. This study aims to redesign the layout of the facility and make suggestions to the trade business to minimize material movement to make it more comfortable and efficient. The method used in the process of redesigning the layout of the facility at UD. ARSHAINDO is to use the FTC (From To Chart) method. From To Chart is a method that can help to solve problems then described in more detail by going through several stages of completion to the maximum point. The results obtained from the From To Chart calculation with a total distance between departments of 36 meters (proposed layout), while the distance applied to UD. ARSHAINDO currently has a distance between departments of 56 meters (initial layout), therefore the proposed layout design has minimized the material transfer distance between departments by 20 meters so that it can produce a maximum layout and the production process is more efficient in terms of the distance between previous departments
Jaringan kolaborasi para penulis
5 penulis ·
5 tautan kepenulisan bersama
Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.
Universitas Muhammadiyah Gresik
Organisasi berbeda
Organisasi sama
Afiliasi tidak diketahui
Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.
Sumber metadata: OAI-PMH (metadata jurnal) https://journal.yrpipku.com/index.php/jaets/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
<dc:title xml:lang="en">Proposed Improvement of Facility Layout in Production Area in Ud. Arshaindo Using the From To Chart (FTC) Method</dc:title>
<dc:creator xml:lang="en">Alghushan, Abdul Azis</dc:creator>
<dc:creator xml:lang="en">Nuruddin, Mochammad</dc:creator>
<dc:creator xml:lang="en">Dahda, Said Salim</dc:creator>
<dc:subject xml:lang="en">from to chart</dc:subject>
<dc:subject xml:lang="en">facility layout</dc:subject>
<dc:subject xml:lang="en">production area</dc:subject>
<dc:description xml:lang="en">Small and medium industry engaged in fast food. Currently, the layout of the facilities at the production site is experiencing problems related to the distance of material movement. This study aims to redesign the layout of the facility and make suggestions to the trade business to minimize material movement to make it more comfortable and efficient. The method used in the process of redesigning the layout of the facility at UD. ARSHAINDO is to use the FTC (From To Chart) method. From To Chart is a method that can help to solve problems then described in more detail by going through several stages of completion to the maximum point. The results obtained from the From To Chart calculation with a total distance between departments of 36 meters (proposed layout), while the distance applied to UD. ARSHAINDO currently has a distance between departments of 56 meters (initial layout), therefore the proposed layout design has minimized the material transfer distance between departments by 20 meters so that it can produce a maximum layout and the production process is more efficient in terms of the distance between previous departments</dc:description>
<dc:publisher xml:lang="en">Yayasan Riset dan Pengembangan Intelektual (YRPI)</dc:publisher>
<dc:date>2022-10-31</dc:date>
<dc:type>info:eu-repo/semantics/article</dc:type>
<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
<dc:format>application/pdf</dc:format>
<dc:identifier>https://journal.yrpipku.com/index.php/jaets/article/view/1118</dc:identifier>
<dc:identifier>10.37385/jaets.v4i1.1118</dc:identifier>
<dc:source xml:lang="en">Journal of Applied Engineering and Technological Science (JAETS); Vol. 4 No. 1 (2022): Journal of Applied Engineering and Technological Science (JAETS); 333-341</dc:source>
<dc:source>2715-6079</dc:source>
<dc:source>2715-6087</dc:source>
<dc:source>10.37385/jaets.v4i1</dc:source>
<dc:language>en</dc:language>
<dc:relation>https://journal.yrpipku.com/index.php/jaets/article/view/1118/764</dc:relation>
<dc:rights xml:lang="en">Copyright (c) 2022 Journal of Applied Engineering and Technological Science (JAETS)</dc:rights>
</oai_dc:dc>
Sitasi dan pengindeksan
Jumlah menurut tiap indeks pada 13 Nov 2026; setiap indeks menghitung sitasi dengan cara berbeda.
OpenAlex juga mencatat karya ini di: crossref, doaj.
Sitasi artikel ini
APA 7
Alghushan, A. A., Nuruddin, M., & Dahda, S. S. (2022). Proposed Improvement of Facility Layout in Production Area in Ud. Arshaindo Using the From To Chart (FTC) Method. Journal of Applied Engineering and Technological Science (JAETS), 4(1), 333–341. https://doi.org/10.37385/jaets.v4i1.1118
Salin
IEEE
A. A. Alghushan, M. Nuruddin, and S. S. Dahda, “Proposed Improvement of Facility Layout in Production Area in Ud. Arshaindo Using the From To Chart (FTC) Method,” Journal of Applied Engineering and Technological Science (JAETS), vol. 4, no. 1, pp. 333–341, 2022, doi: 10.37385/jaets.v4i1.1118.
Salin
Dibuat dari metadata jurnal; periksa nama penulis sebelum dipakai.