Design of A Digitalization System for Machine Scheduling and Allocation in Flexible Job Shop Heavy Equipment Manufacturing Industry

Journal of Applied Engineering and Technological Science (JAETS) · Vol. 7 No. 1 (2025) · hlm. 499–518

DOI
10.37385/jaets.v7i1.5089
ISSN
2715-6079, 2715-6087
Terbit
2025-12-29
Penerbit
Yayasan Riset dan Pengembangan Intelektual (YRPI)
Bahasa
en

Abstrak

This study aims to develop a digitalized scheduling system based on the Flexible Job Shop (FJS) model to optimize production efficiency in the heavy equipment manufacturing industry. The heavy equipment manufacturing industry faces significant challenges in achieving production efficiency due to its high-mix, low-volume (HMLV) nature and the complexity of production processes. The research follows a structured approach, beginning with Focus Group Discussions (FGDs) to gather stakeholder requirements. These requirements are translated into a House of Quality (HoQ) matrix to prioritize features for the dashboard. A literature review identifies optimal scheduling methods, with a focus on FJS and heuristic scheduling rules. The dashboard is developed using JavaScript, PHP, Node.js, and PostgreSQL, and deployed on Amazon Web Services (AWS). The system undergoes black-box testing to ensure functionality and reliability before implementation. The study identifies the Earliest Due Date (EDD) method as the most effective scheduling approach, with an average delay of 3.2 days, utilization of 29%, and completion time of 14.33 days. The implementation of the digitalized scheduling system increased on-time production from 70.56% to 92.8% and improved production achievement from 92.78% to 97.4%. The dashboard application successfully integrates real-time data, adaptive scheduling, and operational features, such as a start-stop system and machine load recommendations. The findings highlight the importance of digital transformation in manufacturing, particularly in optimizing resource allocation, reducing delays, and improving production efficiency. This research contributes to the field of digitalized scheduling and real-time production management by providing a practical, data-driven solution tailored to the HMLV characteristics of heavy equipment manufacturing.

Kata kunci

Jaringan kolaborasi para penulis

11 penulis · 23 tautan kepenulisan bersama · 4 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Binus University
  • University of Malaya
  • State University of Medan
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Noor Hasnah MoinUniversity of Malaya1
Fajar KurniawanUniversity of Malaya1
Siti Nurmaya MusaUniversity of Malaya1
Dhadung PrihanantoBinus University1
Ruben Cornelius SiagianState University of Medan1
Lulut AlfarisAfiliasi tidak diketahui1
Anas Noor FirdausAfiliasi tidak diketahui1
Ukta Indra NyuswantoroAfiliasi tidak diketahui1
Andri WahyudiAfiliasi tidak diketahui1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.yrpipku.com/index.php/jaets/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 16 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">Design of A Digitalization System for Machine Scheduling and Allocation in Flexible Job Shop Heavy Equipment Manufacturing Industry </dc:title>
	<dc:creator xml:lang="en">Karim, Mohammad Alfin</dc:creator>
	<dc:creator xml:lang="en">Sahroni, Taufik Roni</dc:creator>
	<dc:subject xml:lang="en">Digitalization</dc:subject>
	<dc:subject xml:lang="en">Heavy Equipment Industry</dc:subject>
	<dc:subject xml:lang="en">Scheduling</dc:subject>
	<dc:subject xml:lang="en">On-time Production</dc:subject>
	<dc:subject xml:lang="en">EDD</dc:subject>
	<dc:description xml:lang="en">This study aims to develop a digitalized scheduling system based on the Flexible Job Shop (FJS) model to optimize production efficiency in the heavy equipment manufacturing industry. The heavy equipment manufacturing industry faces significant challenges in achieving production efficiency due to its high-mix, low-volume (HMLV) nature and the complexity of production processes. The research follows a structured approach, beginning with Focus Group Discussions (FGDs) to gather stakeholder requirements. These requirements are translated into a House of Quality (HoQ) matrix to prioritize features for the dashboard. A literature review identifies optimal scheduling methods, with a focus on FJS and heuristic scheduling rules. The dashboard is developed using JavaScript, PHP, Node.js, and PostgreSQL, and deployed on Amazon Web Services (AWS). The system undergoes black-box testing to ensure functionality and reliability before implementation. The study identifies the Earliest Due Date (EDD) method as the most effective scheduling approach, with an average delay of 3.2 days, utilization of 29%, and completion time of 14.33 days. The implementation of the digitalized scheduling system increased on-time production from 70.56% to 92.8% and improved production achievement from 92.78% to 97.4%. The dashboard application successfully integrates real-time data, adaptive scheduling, and operational features, such as a start-stop system and machine load recommendations. The findings highlight the importance of digital transformation in manufacturing, particularly in optimizing resource allocation, reducing delays, and improving production efficiency. This research contributes to the field of digitalized scheduling and real-time production management by providing a practical, data-driven solution tailored to the HMLV characteristics of heavy equipment manufacturing.</dc:description>
	<dc:publisher xml:lang="en">Yayasan Riset dan Pengembangan Intelektual (YRPI)</dc:publisher>
	<dc:date>2025-12-29</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.yrpipku.com/index.php/jaets/article/view/5089</dc:identifier>
	<dc:identifier>10.37385/jaets.v7i1.5089</dc:identifier>
	<dc:source xml:lang="en">Journal of Applied Engineering and Technological Science (JAETS); Vol. 7 No. 1 (2025): Journal of Applied Engineering and Technological Science (JAETS); 499-518</dc:source>
	<dc:source>2715-6079</dc:source>
	<dc:source>2715-6087</dc:source>
	<dc:source>10.37385/jaets.v7i1</dc:source>
	<dc:language>en</dc:language>
	<dc:relation>https://journal.yrpipku.com/index.php/jaets/article/view/5089/5467</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2025 Mohammad Alfin Karim, Taufik Roni Sahroni</dc:rights>
</oai_dc:dc>