Melola Discovery

← Melola Discovery

Jurnal SINTA 1

On The Assembly Line Balancing Problem: A Simplified Perspective With The Precedence Matrix

Journal of Applied Engineering and Technological Science (JAETS) · Vol. 6 No. 1 (2024) · hlm. 1–20

DOI
10.37385/jaets.v6i1.5597
ISSN
2715-6079, 2715-6087
Terbit
2024-12-15
Penerbit
Yayasan Riset dan Pengembangan Intelektual (YRPI)
Bahasa
en

Abstrak

The assembly line balancing problem (ALBP) has been an attractive research area for decades; however, the industrial application of the research findings remains limited. This can be attributed to the complexity of solution methods, restrictive assumptions, and the numerous variants of the problem in the real-world settings. This article describes using the precedence matrix as the basis for developing simplified, more practical analysis frameworks for the ALBP. We introduce algorithms to construct the precedence matrix from basic assembly problem data and implement it within a spreadsheet model, and to utilize this matrix in assigning the assembly tasks to workstations while ensuring assignment feasibility. The structure and potential uses of the precedence matrix-based framework are presented in detail. Furthermore, we compare selected line balancing priority rules using the proposed framework to demonstrate its effectiveness. The results suggest that the precedence matrix model is a straightforward, efficient tool for line balancing analysis, that can offer substantial support to both industry practitioners and academic researchers.

Kata kunci

Jaringan kolaborasi para penulis

6 penulis · 9 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • American University of the Middle East
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Wael FaragAmerican University of the Middle East1
Zekeriya UykanAmerican University of the Middle East1
Muhammad NadeemAmerican University of the Middle East1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.yrpipku.com/index.php/jaets/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">On The Assembly Line Balancing Problem: A Simplified Perspective With The Precedence Matrix</dc:title>
	<dc:creator xml:lang="en">Helal, Magdy</dc:creator>
	<dc:creator xml:lang="en">Nag, Kaushik</dc:creator>
	<dc:creator xml:lang="en">Ozdemir, Rifat</dc:creator>
	<dc:subject xml:lang="en">Assembly Line Balancing</dc:subject>
	<dc:subject xml:lang="en">Precedence Matrix</dc:subject>
	<dc:subject xml:lang="en">Spreadsheets</dc:subject>
	<dc:subject xml:lang="en">Priority Rules</dc:subject>
	<dc:description xml:lang="en">The assembly line balancing problem (ALBP) has been an attractive research area for decades; however, the industrial application of the research findings remains limited. This can be attributed to the complexity of solution methods, restrictive assumptions, and the numerous variants of the problem in the real-world settings. This article describes using the precedence matrix as the basis for developing simplified, more practical analysis frameworks for the ALBP. We introduce algorithms to construct the precedence matrix from basic assembly problem data and implement it within a spreadsheet model, and to utilize this matrix in assigning the assembly tasks to workstations while ensuring assignment feasibility. The structure and potential uses of the precedence matrix-based framework are presented in detail. Furthermore, we compare selected line balancing priority rules using the proposed framework to demonstrate its effectiveness. The results suggest that the precedence matrix model is a straightforward, efficient tool for line balancing analysis, that can offer substantial support to both industry practitioners and academic researchers.</dc:description>
	<dc:publisher xml:lang="en">Yayasan Riset dan Pengembangan Intelektual (YRPI)</dc:publisher>
	<dc:date>2024-12-15</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.yrpipku.com/index.php/jaets/article/view/5597</dc:identifier>
	<dc:identifier>10.37385/jaets.v6i1.5597</dc:identifier>
	<dc:source xml:lang="en">Journal of Applied Engineering and Technological Science (JAETS); Vol. 6 No. 1 (2024): Journal of Applied Engineering and Technological Science (JAETS); 1-20</dc:source>
	<dc:source>2715-6079</dc:source>
	<dc:source>2715-6087</dc:source>
	<dc:source>10.37385/jaets.v6i1</dc:source>
	<dc:language>en</dc:language>
	<dc:relation>https://journal.yrpipku.com/index.php/jaets/article/view/5597/3630</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2024 Journal of Applied Engineering and Technological Science (JAETS)</dc:rights>
</oai_dc:dc>