Enhancing efficiency in construction scheduling for SMEs: A novel matrix-based VBA-excel model

Journal of Applied Engineering and Technological Science (JAETS) · Vol. 7 No. 2 (2026) · hlm. 1140–1162

DOI
10.37385/jaets.v7i2.9232
ISSN
2715-6079, 2715-6087
Terbit
2026-06-15
Penerbit
Yayasan Riset dan Pengembangan Intelektual (YRPI)
Bahasa
en

Abstrak

Small and medium-sized enterprises (SMEs) in construction face challenges managing complex project schedules cost-effectively. This study develops a user-friendly, matrix-based VBA-Excel model to enhance scheduling efficiency. The objective is to create an accessible tool that automates task dependency management without requiring advanced coding skills. The model employs the Precedence Diagramming Method (PDM), integrating all dependency types (FS, SS, FF, SF) with lag/lead adjustments through VBA automation in Excel. Implementation involved designing a novel matrix structure for dependency handling and a simple interface, validated via case studies with 11 and 9 tasks, benchmarked against industry standards. Results show accurate schedule calculations matching benchmarks, with seamless adjustments, though processing slows for large projects. The tool enables SMEs to optimize resources, reduce delays, and improve competitiveness at no cost. Limitations include Excel’s computational limits and omission of real-world calendar constraints like holidays. Future enhancements could include cloud-based scalability and risk integration. This innovative model fosters inclusive project management, reducing infrastructure disparities in underserved regions.

Kata kunci

Jaringan kolaborasi para penulis

2 penulis · 1 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Industrial University of Ho Chi Minh City
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.yrpipku.com/index.php/jaets/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">Enhancing efficiency in construction scheduling for SMEs: A novel matrix-based VBA-excel model</dc:title>
	<dc:creator xml:lang="en">Nguyen-Son, L.</dc:creator>
	<dc:creator xml:lang="en">T. Thai-Phuong</dc:creator>
	<dc:subject xml:lang="en">Construction Scheduling</dc:subject>
	<dc:subject xml:lang="en">VBA-Excel</dc:subject>
	<dc:subject xml:lang="en">PDM</dc:subject>
	<dc:subject xml:lang="en">SMEs</dc:subject>
	<dc:subject xml:lang="en">Matrix-Based Model</dc:subject>
	<dc:subject xml:lang="en">Dependency Management</dc:subject>
	<dc:subject xml:lang="en">Cost-Effective Tool</dc:subject>
	<dc:description xml:lang="en">Small and medium-sized enterprises (SMEs) in construction face challenges managing complex project schedules cost-effectively. This study develops a user-friendly, matrix-based VBA-Excel model to enhance scheduling efficiency. The objective is to create an accessible tool that automates task dependency management without requiring advanced coding skills. The model employs the Precedence Diagramming Method (PDM), integrating all dependency types (FS, SS, FF, SF) with lag/lead adjustments through VBA automation in Excel. Implementation involved designing a novel matrix structure for dependency handling and a simple interface, validated via case studies with 11 and 9 tasks, benchmarked against industry standards. Results show accurate schedule calculations matching benchmarks, with seamless adjustments, though processing slows for large projects. The tool enables SMEs to optimize resources, reduce delays, and improve competitiveness at no cost. Limitations include Excel’s computational limits and omission of real-world calendar constraints like holidays. Future enhancements could include cloud-based scalability and risk integration. This innovative model fosters inclusive project management, reducing infrastructure disparities in underserved regions.</dc:description>
	<dc:publisher xml:lang="en">Yayasan Riset dan Pengembangan Intelektual (YRPI)</dc:publisher>
	<dc:date>2026-06-15</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.yrpipku.com/index.php/jaets/article/view/9232</dc:identifier>
	<dc:identifier>10.37385/jaets.v7i2.9232</dc:identifier>
	<dc:source xml:lang="en">Journal of Applied Engineering and Technological Science (JAETS); Vol. 7 No. 2 (2026): Journal of Applied Engineering and Technological Science (JAETS); 1140-1162</dc:source>
	<dc:source>2715-6079</dc:source>
	<dc:source>2715-6087</dc:source>
	<dc:source>10.37385/jaets.v7i2</dc:source>
	<dc:language>en</dc:language>
	<dc:relation>https://journal.yrpipku.com/index.php/jaets/article/view/9232/6392</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2026 L. Nguyen-Son, T. Thai-Phuong</dc:rights>
</oai_dc:dc>