Melola Discovery

← Melola Discovery

Akses terbuka Jurnal SINTA 1

Evaluating watershed rehabilitation success beyond vegetation cover: A case study from Southeast Sulawesi, Indonesia

Journal of Degraded and Mining Lands Management · Vol. 13 No. 4 (2026) · hlm. 11341–11353

DOI
10.15243/jdmlm.2026.134.11341
ISSN
2502-2458, 2339-076X
Terbit
2026-10-01
Penerbit
Brawijaya University
Bahasa
eng
Lisensi
creativecommons.org/licenses/by-nc/4.0

Abstrak

Watershed rehabilitation programs carried out under Indonesia's Forest Area Utilization Permit (Persetujuan Penggunaan Kawasan Hutan, PPKH) obligation are currently evaluated using short-term structural indicators. Meanwhile, functional recovery is rarely assessed explicitly, particularly in landscapes dominated by Imperata cylindrica. This case study evaluated structural and functional recovery in the 139-ha Poleang watershed rehabilitation area, Bombana Regency, Southeast Sulawesi, three years after the rehabilitation intervention began. Vegetation dynamics were analyzed using a 1995-2026 Landsat NDVI time series, while hydrological function recovery was estimated through the surface runoff coefficient using Cook's method. The pre-intervention NDVI trend was positive but not statistically significant (Sen's Slope = 0.00261/yr; Z = 1.44; p = 0.1486). The actual post-intervention NDVI (0.803) nominally exceeded the pre-intervention trend projection but remained below the mature forest reference value (0.853). The surface runoff coefficient in 2026 is estimated to have decreased slightly from 64.85% to 64.71%, with a maximum potential reduction of only 6.79% under a full canopy cover scenario (C = 58.06%). The structural recovery achievement (32.05%) far exceeded the functional recovery achievement (2.12%), indicating a recovery lag in watershed rehabilitation. These findings suggest that evaluation frameworks for program success that rely solely on structural indicators risk failing to capture the dynamics of functional watershed recovery, highlighting the need for a phased evaluation design that extends the functional monitoring window beyond the current three-year implementation period.

Kata kunci

Jaringan kolaborasi para penulis

16 penulis · 39 tautan kepenulisan bersama · 3 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Bandung Institute of Technology
  • Tanjungpura University
  • IPB University
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
SantiTanjungpura University1
Ari KrisnohadiTanjungpura University1
SulakhudinAfiliasi tidak diketahui1
Ratna HerawatiningsihTanjungpura University1
MudimAfiliasi tidak diketahui1
Cecep KusmanaIPB University1
Tatang TiryanaIPB University1
Ani SuryaniIPB University1
Rina Ratnasih IrwantoBandung Institute of Technology1
Fahmi Idris FirdausBandung Institute of Technology1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) http://jdmlm.ub.ac.id/index.php/jdmlm/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 9 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Evaluating watershed rehabilitation success beyond vegetation cover:  A case study from Southeast Sulawesi, Indonesia</dc:title>
	<dc:creator>Aniswari, Sekar Arum</dc:creator>
	<dc:creator>Nisa, Fitrotun</dc:creator>
	<dc:creator>Riza, Maulida</dc:creator>
	<dc:creator>Sumarga, Elham</dc:creator>
	<dc:creator>Suwandhi, Ichsan</dc:creator>
	<dc:creator>Abdillah, Andi Massoeang</dc:creator>
	<dc:subject xml:lang="en-US">Imperata cylindrica</dc:subject>
	<dc:subject xml:lang="en-US">NDVI</dc:subject>
	<dc:subject xml:lang="en-US">structural-functional recovery</dc:subject>
	<dc:subject xml:lang="en-US">surface runoff coefficient</dc:subject>
	<dc:subject xml:lang="en-US">watershed rehabilitation</dc:subject>
	<dc:description xml:lang="en-US">Watershed rehabilitation programs carried out under Indonesia's Forest Area Utilization Permit (Persetujuan Penggunaan Kawasan Hutan, PPKH) obligation are currently evaluated using short-term structural indicators. Meanwhile, functional recovery is rarely assessed explicitly, particularly in landscapes dominated by Imperata cylindrica. This case study evaluated structural and functional recovery in the 139-ha Poleang watershed rehabilitation area, Bombana Regency, Southeast Sulawesi, three years after the rehabilitation intervention began. Vegetation dynamics were analyzed using a 1995-2026 Landsat NDVI time series, while hydrological function recovery was estimated through the surface runoff coefficient using Cook's method. The pre-intervention NDVI trend was positive but not statistically significant (Sen's Slope = 0.00261/yr; Z = 1.44; p =  0.1486). The actual post-intervention NDVI (0.803) nominally exceeded the pre-intervention trend projection but remained below the mature forest reference value (0.853). The surface runoff coefficient in 2026 is estimated to have decreased slightly from 64.85% to 64.71%, with a maximum potential reduction of only 6.79% under a full canopy cover scenario (C = 58.06%). The structural recovery achievement (32.05%) far exceeded the functional recovery achievement (2.12%), indicating a recovery lag in watershed rehabilitation. These findings suggest that evaluation frameworks for program success that rely solely on structural indicators risk failing to capture the dynamics of functional watershed recovery, highlighting the need for a phased evaluation design that extends the functional monitoring window beyond the current three-year implementation period.</dc:description>
	<dc:publisher xml:lang="en-US">Brawijaya University</dc:publisher>
	<dc:date>2026-10-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://jdmlm.ub.ac.id/index.php/jdmlm/article/view/18039</dc:identifier>
	<dc:identifier>10.15243/jdmlm.2026.134.11341</dc:identifier>
	<dc:source xml:lang="en-US">Journal of Degraded and Mining Lands Management; Vol. 13 No. 4 (2026); 11341–11353</dc:source>
	<dc:source>2502-2458</dc:source>
	<dc:source>2339-076X</dc:source>
	<dc:source>10.15243/jdmlm.2026.134</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://jdmlm.ub.ac.id/index.php/jdmlm/article/view/18039/2178</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2026 Journal of Degraded and Mining Lands Management</dc:rights>
	<dc:rights xml:lang="en-US">https://creativecommons.org/licenses/by-nc/4.0</dc:rights>
</oai_dc:dc>