Melola Discovery

← Melola Discovery

Jurnal SINTA 1

Estimation of Bank Erosion Due to Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)

Journal of Engineering and Technological Sciences · Vol. 41 No. 2 (2013) · hlm. 148–166

DOI
10.5614/itbj.eng.sci.2009.41.2.5
ISSN
2338-5502, 2337-5779
Terbit
2013-09-13
Penerbit
Directorate for Research and Community Services, Institut Teknologi Bandung
Bahasa
eng

Abstrak

Sedimentation is such a crucial issue to be noted once the accumulated sediment begins to fill the reservoir dead storage, this will then influence the long-term reservoir operation. The sediment accumulated requires a serious attention for it may influence the storage capacity and other reservoir management of activities. The continuous inflow of sediment to the reservoir will decrease the capacity of reservoir storage, the reservoir value in use, and the useful age of reservoir. Because of that, the rate of the sediment needs to be delayed as possible. In this research, the delay of the sediment rate is considered based on the rate of flow of landslide of the reservoir slope. The rate of flow of the sliding slope can be minimized by way of each reservoir autonomous efforts. This effort can be performed through; the regulation of fluctuating rate of reservoir surface current that does not cause suddenly drawdown and upraising as well. The research model is compiled using the searching technique of Non Linear Programming (NLP). The rate of bank erosion for the reservoir variates from 0.0009 to 0.0048 MCM/year, which is no sigrificant value to threaten the life time of reservoir.Mean while the rate of watershed sediment has a significant value, i.e: 3,02 MCM/year for Saguling that causes to fullfill the storage capacity in 40 next years (from years 2008).

Jaringan kolaborasi para penulis

6 penulis · 9 tautan kepenulisan bersama · 5 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Universitas Muhammadiyah Aceh
  • Bandung Institute of Technology
  • Universitas Syiah Kuala
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Hafnidar A. RaniUniversitas Muhammadiyah Aceh1
Firmansyah RachmanUniversitas Muhammadiyah Aceh1
Tasri SalamUniversitas Muhammadiyah Aceh1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journals.itb.ac.id/index.php/jets/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Estimation of Bank Erosion Due to Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)</dc:title>
	<dc:creator>Legowo, Sri</dc:creator>
	<dc:creator>Hadihardaja, Iwan K.</dc:creator>
	<dc:creator>Azmeri, Azmeri</dc:creator>
	<dc:description xml:lang="en-US">Sedimentation  is  such  a  crucial  issue  to  be  noted  once  the accumulated  sediment  begins  to  fill  the  reservoir  dead  storage,  this  will  then influence the long-term reservoir operation. The sediment accumulated requires a serious attention for it may influence the storage capacity and other reservoir management  of  activities.  The  continuous  inflow  of  sediment  to  the  reservoir will decrease the capacity of reservoir storage, the reservoir value in use, and the useful  age  of  reservoir.  Because  of  that,  the  rate  of  the  sediment  needs  to  be delayed as possible. In this research, the delay of the sediment rate is considered based on the rate of flow of landslide of the reservoir slope. The rate of flow of the sliding slope can be minimized by way of each reservoir autonomous efforts. This  effort  can  be  performed  through;  the  regulation  of  fluctuating  rate  of reservoir surface current that does not cause suddenly  drawdown  and upraising as well. The research model is compiled using the searching technique of Non Linear Programming (NLP). The  rate  of  bank  erosion  for  the  reservoir  variates  from  0.0009  to  0.0048 MCM/year, which is no sigrificant value to threaten the life time of reservoir.Mean  while  the   rate  of  watershed  sediment  has  a  significant  value,  i.e:  3,02  MCM/year  for  Saguling  that  causes  to  fullfill  the  storage  capacity  in  40  next years (from years 2008). </dc:description>
	<dc:publisher xml:lang="en-US">Directorate for Research and Community Services, Institut Teknologi Bandung</dc:publisher>
	<dc:date>2013-09-13</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journals.itb.ac.id/index.php/jets/article/view/123</dc:identifier>
	<dc:identifier>10.5614/itbj.eng.sci.2009.41.2.5</dc:identifier>
	<dc:source xml:lang="en-US">Journal of Engineering and Technological Sciences; Vol. 41 No. 2 (2009); 148-166</dc:source>
	<dc:source>2338-5502</dc:source>
	<dc:source>2337-5779</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journals.itb.ac.id/index.php/jets/article/view/123/119</dc:relation>
</oai_dc:dc>