Melola Discovery

← Melola Discovery

Jurnal SINTA 1

Simultaneous Optimization of Block Replacement and Spare Part Ordering Time for a Multi Component System with Separate Spare Part Ordering for Block and Failure Replacements

Journal of Engineering and Technological Sciences · Vol. 48 No. 5 (2016) · hlm. 495–522

DOI
10.5614/j.eng.technol.sci.2016.48.5.1
ISSN
2338-5502, 2337-5779
Terbit
2016-11-30
Penerbit
Directorate for Research and Community Services, Institut Teknologi Bandung
Bahasa
eng

Abstrak

A block replacement schedule can be optimized simultaneously with a spare parts ordering schedule, since all items are replaced at a constant interval. The solution of joint optimization for spare parts ordering time and block replacement gives lower costs compared to separate optimization of ordering time and replacement time. The spare parts for replacement can be classified as stochastic demand for failure replacement and deterministic demand for block replacement. In this paper, we propose a simulation model for a separate spare parts ordering schedule. The solution was compared to the solution for a model with common spare parts for both failure and block replacement. The system has N identical components, each with a Weibull lifetime distribution. The costs of failure and block replacements, and also the costs of ordering, holding and shortage of spare parts are given. The proposed model was shown to perform better than the common order model. Also, compared to the age replacement model, the solution of the proposed model is relatively similar, yet the economies of scale would be an advantage for the block replacement over age replacement.

Jaringan kolaborasi para penulis

2 penulis · 1 tautan kepenulisan bersama · 1 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Hasanuddin University
  • Erasmus University Rotterdam
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journals.itb.ac.id/index.php/jets/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Simultaneous Optimization of Block Replacement and Spare Part Ordering Time for a Multi Component System with Separate Spare Part Ordering for Block and Failure Replacements</dc:title>
	<dc:creator>Mardin, Farid</dc:creator>
	<dc:creator>Dekker, Rommert</dc:creator>
	<dc:description xml:lang="en-US">A block replacement schedule can be optimized simultaneously with a spare parts ordering schedule, since all items are replaced at a constant interval. The solution of joint optimization for spare parts ordering time and block replacement gives lower costs compared to separate optimization of ordering time and replacement time. The spare parts for replacement can be classified as stochastic demand for failure replacement and deterministic demand for block replacement. In this paper, we propose a simulation model for a separate spare parts ordering schedule. The solution was compared to the solution for a model with common spare parts for both failure and block replacement. The system has N identical components, each with a Weibull lifetime distribution. The costs of failure and block replacements, and also the costs of ordering, holding and shortage of spare parts are given. The proposed model was shown to perform better than the common order model. Also, compared to the age replacement model, the solution of the proposed model is relatively similar, yet the economies of scale would be an advantage for the block replacement over age replacement.</dc:description>
	<dc:publisher xml:lang="en-US">Directorate for Research and Community Services, Institut Teknologi Bandung</dc:publisher>
	<dc:date>2016-11-30</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journals.itb.ac.id/index.php/jets/article/view/1943</dc:identifier>
	<dc:identifier>10.5614/j.eng.technol.sci.2016.48.5.1</dc:identifier>
	<dc:source xml:lang="en-US">Journal of Engineering and Technological Sciences; Vol. 48 No. 5 (2016); 495-522</dc:source>
	<dc:source>2338-5502</dc:source>
	<dc:source>2337-5779</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journals.itb.ac.id/index.php/jets/article/view/1943/1843</dc:relation>
</oai_dc:dc>