Production and Delivery Batch Scheduling with Multiple Due Dates to Minimize Total Cost

Journal of Engineering and Technological Sciences · Vol. 49 No. 1 (2017) · hlm. 16–36

DOI
10.5614/j.eng.technol.sci.2017.49.1.2
ISSN
2338-5502, 2337-5779
Terbit
2017-04-30
Penerbit
Directorate for Research and Community Services, Institut Teknologi Bandung
Bahasa
eng

Abstrak

This paper addresses an integrated production and delivery batch scheduling problem for a make-to-order environment over daily time period, where the holding costs of in-process and completed parts at a supplier location and of completed parts at a manufacturer location are distinguished. All orders of parts with different due dates from the manufacturer arrive at the same time. The parts are produced in production batches and subsequently the completed parts are delivered in delivery batches using a capacitated vehicle in order to be received at the respective due dates. This study was aimed at finding an integrated schedule of production and delivery batches so as to meet the due date at minimum total cost consisting of the corresponding holding cost and delivery cost. The holding cost is a derivation of the so-called actual flow time (AFT), while the delivery cost is assumed to be proportional to the number of deliveries. The problems can be formulated as an integer non-linear programming model, and the global optimal solution can be obtained using optimization software. A heuristic algorithm is proposed to cope with the computational time problem using software. The numerical experiences show that the proposed algorithm yields near global optimal solutions.

Kata kunci

Jaringan kolaborasi para penulis

10 penulis · 18 tautan kepenulisan bersama · 3 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Bandung Institute of Technology
  • Diponegoro University
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Singgih SaptadiDiponegoro University1
Iman SudirmanBandung Institute of Technology1
Rajesri GovindarajuBandung Institute of Technology1
Nova Indah SaragihBandung Institute of Technology1
Senator Nur BahagiaBandung Institute of Technology1
Ibnu SyabriBandung Institute of Technology1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journals.itb.ac.id/index.php/jets/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Production and Delivery Batch Scheduling with Multiple Due Dates to Minimize Total Cost</dc:title>
	<dc:creator>Prasetyaningsih, Endang</dc:creator>
	<dc:creator>Suprayogi, Suprayogi</dc:creator>
	<dc:creator>Samadhi, T.M.A. Ari</dc:creator>
	<dc:creator>Halim, Abdul Hakim</dc:creator>
	<dc:subject xml:lang="en-US">actual flow time</dc:subject>
	<dc:subject xml:lang="en-US">backward scheduling</dc:subject>
	<dc:subject xml:lang="en-US">batch scheduling</dc:subject>
	<dc:subject xml:lang="en-US">integer non-linear programming</dc:subject>
	<dc:subject xml:lang="en-US">integrated production and delivery.</dc:subject>
	<dc:description xml:lang="en-US">This paper addresses an integrated production and delivery batch scheduling problem for a make-to-order environment over daily time period, where the holding costs of in-process and completed parts at a supplier location and of completed parts at a manufacturer location are distinguished. All orders of parts with different due dates from the manufacturer arrive at the same time. The parts are produced in production batches and subsequently the completed parts are delivered in delivery batches using a capacitated vehicle in order to be received at the respective due dates. This study was aimed at finding an integrated schedule of production and delivery batches so as to meet the due date at minimum total cost consisting of the corresponding holding cost and delivery cost. The holding cost is a derivation of the so-called actual flow time (AFT), while the delivery cost is assumed to be proportional to the number of deliveries. The problems can be formulated as an integer non-linear programming model, and the global optimal solution can be obtained using optimization software. A heuristic algorithm is proposed to cope with the computational time problem using software. The numerical experiences show that the proposed algorithm yields near global optimal solutions.</dc:description>
	<dc:publisher xml:lang="en-US">Directorate for Research and Community Services, Institut Teknologi Bandung</dc:publisher>
	<dc:date>2017-04-30</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journals.itb.ac.id/index.php/jets/article/view/2198</dc:identifier>
	<dc:identifier>10.5614/j.eng.technol.sci.2017.49.1.2</dc:identifier>
	<dc:source xml:lang="en-US">Journal of Engineering and Technological Sciences; Vol. 49 No. 1 (2017); 16-36</dc:source>
	<dc:source>2338-5502</dc:source>
	<dc:source>2337-5779</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journals.itb.ac.id/index.php/jets/article/view/2198/2467</dc:relation>
</oai_dc:dc>