Numerical Simulation on the Influence of Bridge Construction on River Flood Control in a Bottleneck Reach

Journal of Engineering and Technological Sciences · Vol. 50 No. 4 (2018) · hlm. 451–460

DOI
10.5614/j.eng.technol.sci.2017.50.4.1
ISSN
2338-5502, 2337-5779
Terbit
2018-10-31
Penerbit
Directorate for Research and Community Services, Institut Teknologi Bandung
Bahasa
eng

Abstrak

Bottleneck reach regions with narrow and deep cross sections prevent sediment transport and weaken flood control capacity. In addition, bridge constructions can exacerbate the risk of flooding in these areas. In this study, the Longhai Railway Extension Project at the Xianyang reach of the Weihe River in China was selected as a typical object. A horizontal 2-D numerical model was used to assess the effects of three engineering plans on flood discharge capacity under three flood frequencies. Plan 1 was designed to include building a new bridge, demolishing the three original bridges and dredging a single section of the channel. Plan 2 was the same as Plan 1, except for the compound sections. Plan 3 was designed with the four bridges coexisting and no dredging projects carried out. The results indicated that Plan 3 will increase the water level by 0.2-0.3 m in the upstream reach. The cross-sectional area was approximately 370 m2 larger under Plan 1 than under Plan 2. Water levels of 300-, 100-, and 5-year flooding around the bridge were reduced by 0.9, 0.9, and 0.6 m, respectively. To improve flood control capacity, an effective dredging project must be executed to widen the river and reduce the water stage in the bottleneck reach where the bridge is constructed.

Jaringan kolaborasi para penulis

4 penulis · 6 tautan kepenulisan bersama · 5 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Chinese Academy of Sciences
  • Institute of Soil and Water Conservation
  • Ministry of Water Resources of the People's Republic of China
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journals.itb.ac.id/index.php/jets/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 9 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Numerical Simulation on the Influence of Bridge Construction on River Flood Control in a Bottleneck Reach</dc:title>
	<dc:creator>Han, Jianqiao</dc:creator>
	<dc:creator>Wang, Honglei</dc:creator>
	<dc:creator>Luo, Han</dc:creator>
	<dc:creator>Duan, Wenzhong</dc:creator>
	<dc:description xml:lang="en-US">Bottleneck reach regions with narrow and deep cross sections prevent sediment transport and weaken flood control capacity. In addition, bridge constructions can exacerbate the risk of flooding in these areas. In this study, the Longhai Railway Extension Project at the Xianyang reach of the Weihe River in China was selected as a typical object. A horizontal 2-D numerical model was used to assess the effects of three engineering plans on flood discharge capacity under three flood frequencies. Plan 1 was designed to include building a new bridge, demolishing the three original bridges and dredging a single section of the channel. Plan 2 was the same as Plan 1, except for the compound sections. Plan 3 was designed with the four bridges coexisting and no dredging projects carried out. The results indicated that Plan 3 will increase the water level by 0.2-0.3 m in the upstream reach. The cross-sectional area was approximately 370 m2 larger under Plan 1 than under Plan 2. Water levels of 300-, 100-, and 5-year flooding around the bridge were reduced by 0.9, 0.9, and 0.6 m, respectively. To improve flood control capacity, an effective dredging project must be executed to widen the river and reduce the water stage in the bottleneck reach where the bridge is constructed.</dc:description>
	<dc:publisher xml:lang="en-US">Directorate for Research and Community Services, Institut Teknologi Bandung</dc:publisher>
	<dc:date>2018-10-31</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journals.itb.ac.id/index.php/jets/article/view/5318</dc:identifier>
	<dc:identifier>10.5614/j.eng.technol.sci.2017.50.4.1</dc:identifier>
	<dc:source xml:lang="en-US">Journal of Engineering and Technological Sciences; Vol. 50 No. 4 (2018); 451-460</dc:source>
	<dc:source>2338-5502</dc:source>
	<dc:source>2337-5779</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journals.itb.ac.id/index.php/jets/article/view/5318/3469</dc:relation>
</oai_dc:dc>