Akses terbuka
Jurnal
SINTA 1
Risiko Investasi dalam Pembangunan Jalan Tol di Indonesia
Journal of Regional and City Planning · Vol. 18 No. 3 (2007) · hlm. 40–54
ISSN 2502-6429
Terbit 2007-12-01
Penerbit The Directorate for Research and Innovation, Institut Teknologi Bandung
Bahasa eng
Abstrak
In accordance with an effort to increase economic development for the welfare of the society, the government of Republic of Indonesia plan to develop infrastructures, including toll road, in a big scale. On the contrary to the high investment potential, there are some risks arise and have to be faced by government and investors. These risks has to be taken into account in investment cal culation as a whole and managed very well since the beginning so that it can be anticipated as early as possible. Risk management is a well and systematic approach to manage these risk, started from risk identification and responses. In toll business, t here are so many risk have to be faced in every stage, from planning, construction until operation and maintenance stages, with the magnitude of very small to very big and probability occurrence from very rare to always happen. In this case, attitude toward this risk are accept, mitigate, transfer to other party, or avoid at all. Regional/Local government could participate in toll road development, either as part of regulator or investor, this might slightly change risk implication.
Jaringan kolaborasi para penulis
2 penulis ·
1 tautan kepenulisan bersama
Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.
Organisasi berbeda
Organisasi sama
Afiliasi tidak diketahui
Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.
Sumber metadata: OAI-PMH (metadata jurnal) http://journals.itb.ac.id/index.php/jpwk/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 16 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
<dc:title xml:lang="en-US">Risiko Investasi dalam Pembangunan Jalan Tol di Indonesia</dc:title>
<dc:creator>Karsaman, Rudy Hermawan</dc:creator>
<dc:subject xml:lang="en-US">risiko</dc:subject>
<dc:subject xml:lang="en-US">investasi</dc:subject>
<dc:subject xml:lang="en-US">jalan tol</dc:subject>
<dc:subject xml:lang="en-US">tol road</dc:subject>
<dc:subject xml:lang="en-US">pemerintah daereah</dc:subject>
<dc:description xml:lang="en-US">In accordance with an effort to increase economic development for the welfare of the society, the government of Republic of Indonesia plan to develop infrastructures, including toll road, in a big scale. On the contrary to the high investment potential, there are some risks arise and have to be faced by government and investors. These risks has to be taken into account in investment cal culation as a whole and managed very well since the beginning so that it can be anticipated as early as possible. Risk management is a well and systematic approach to manage these risk, started from risk identification and responses. In toll business, t here are so many risk have to be faced in every stage, from planning, construction until operation and maintenance stages, with the magnitude of very small to very big and probability occurrence from very rare to always happen. In this case, attitude toward this risk are accept, mitigate, transfer to other party, or avoid at all. Regional/Local government could participate in toll road development, either as part of regulator or investor, this might slightly change risk implication.</dc:description>
<dc:publisher xml:lang="en-US">The Directorate for Research and Innovation, Institut Teknologi Bandung</dc:publisher>
<dc:date>2007-12-01</dc:date>
<dc:type>info:eu-repo/semantics/article</dc:type>
<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
<dc:type xml:lang="en-US">Research Article</dc:type>
<dc:format>application/pdf</dc:format>
<dc:identifier>https://journals.itb.ac.id/index.php/jpwk/article/view/4228</dc:identifier>
<dc:source xml:lang="en-US">Journal of Regional and City Planning; Vol. 18 No. 3 (2007); 40-54</dc:source>
<dc:source>2502-6429</dc:source>
<dc:language>eng</dc:language>
<dc:relation>https://journals.itb.ac.id/index.php/jpwk/article/view/4228/2287</dc:relation>
<dc:rights xml:lang="en-US">Copyright (c) 2017 Journal of Regional and City Planning</dc:rights>
<dc:rights xml:lang="en-US">https://creativecommons.org/licenses/by-nc/4.0/</dc:rights>
</oai_dc:dc>
Sitasi dan pengindeksan
OpenAlex
Belum diperiksa
Crossref
Tidak ditemukan
Jumlah menurut tiap indeks pada 16 Nov 2026; setiap indeks menghitung sitasi dengan cara berbeda.
Sitasi artikel ini
APA 7
Karsaman, R. H. (2007). Risiko Investasi dalam Pembangunan Jalan Tol di Indonesia. Journal of Regional and City Planning, 18(3), 40–54. https://journals.itb.ac.id/index.php/jpwk/article/view/4228
Salin
IEEE
R. H. Karsaman, “Risiko Investasi dalam Pembangunan Jalan Tol di Indonesia,” Journal of Regional and City Planning, vol. 18, no. 3, pp. 40–54, 2007.
Salin
Dibuat dari metadata jurnal; periksa nama penulis sebelum dipakai.