Analysis of the local energy potential connection with power plants based on archimedes turbine 10 kW

Journal of Robotics and Control (JRC) · Vol. 1 No. 5 (2020) · hlm. 162–166

DOI
10.18196/jrc.1533
ISSN
2715-5072, 2715-5056
Terbit
2020-04-27
Penerbit
Universitas Muhammadiyah Yogyakarta
Bahasa
eng

Abstrak

Research on the availability of water potential for the development of power plants with various scales and types of power plants has been done. Since most existing water sources have small discharges and low heads, this study aimed at designing a micro-hydropower center as one of the ways the electrical energy crisis could be avoided, with one of the renewable energy potentials, namely the potential energy of water in Micro Hydro Power Plant. Further studies were related to water resources to Micro Hydro Power Plants (MHPP) construction, especially Archimedes screw turbines guide parameters that corresponded to flow velocity, channel cross-section, and flow volume. It aimed to connect the local energy potential to the output power of the Archimedes screw turbine. The methods used for this study were 1. Observation 2. Data collection, and 3. Data Analysis. The study was carried out using an observation method that adopted field data collection techniques assisted by measuring equipment to collect data coverage that refers to related parameters. The power available on the channel resulted was 946 kW, and the power generated in the turbine was 5.9 kW.

Kata kunci

Jaringan kolaborasi para penulis

13 penulis · 30 tautan kepenulisan bersama · 8 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Universitas Muhammadiyah Palembang
  • Muhammadiyah University of Yogyakarta
  • KIIT University
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Wiwin Armoldo OktavianiUniversitas Muhammadiyah Palembang4
Suppermen SuppermenUniversitas Muhammadiyah Palembang3
Khoirul KarimUniversitas Muhammadiyah Palembang2
Aldiansyah AldiansyahUniversitas Muhammadiyah Palembang2
Taufik BarlianUniversitas Muhammadiyah Palembang1
Nugraha SyarifUniversitas Muhammadiyah Palembang1
Anish PandeyKIIT University1
Dhiya Uddin RijalusalamMuhammadiyah University of Yogyakarta1
Iswanto SuwarnoMuhammadiyah University of Yogyakarta1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.umy.ac.id/index.php/jrc/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 9 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Analysis of the local energy potential connection with power plants based on archimedes turbine 10 kW</dc:title>
	<dc:creator>Apriani, Yosi</dc:creator>
	<dc:creator>Saleh, Zulkiffli</dc:creator>
	<dc:creator>Dillah, Riyan Kurnia</dc:creator>
	<dc:creator>Sofian, Ian Mochamad</dc:creator>
	<dc:subject xml:lang="en-US">power available</dc:subject>
	<dc:subject xml:lang="en-US">power generated in the Archimedes turbine.</dc:subject>
	<dc:description xml:lang="en-US">Research on the availability of water potential for the development of power plants with various scales and types of power plants has been done. Since most existing water sources have small discharges and low heads, this study aimed at designing a micro-hydropower center as one of the ways the electrical energy crisis could be avoided, with one of the renewable energy potentials, namely the potential energy of water in Micro Hydro Power Plant. Further studies were related to water resources to Micro Hydro Power Plants (MHPP) construction, especially Archimedes screw turbines guide parameters that corresponded to flow velocity, channel cross-section, and flow volume. It aimed to connect the local energy potential to the output power of the Archimedes screw turbine. The methods used for this study were 1. Observation 2. Data collection, and 3. Data Analysis. The study was carried out using an observation method that adopted field data collection techniques assisted by measuring equipment to collect data coverage that refers to related parameters. The power available on the channel resulted was 946 kW, and the power generated in the turbine was 5.9 kW.</dc:description>
	<dc:publisher xml:lang="en-US">Universitas Muhammadiyah Yogyakarta</dc:publisher>
	<dc:date>2020-04-27</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.umy.ac.id/index.php/jrc/article/view/7988</dc:identifier>
	<dc:identifier>10.18196/jrc.1533</dc:identifier>
	<dc:source xml:lang="en-US">Journal of Robotics and Control (JRC); Vol. 1 No. 5 (2020): September; 162-166</dc:source>
	<dc:source>2715-5072</dc:source>
	<dc:source>2715-5056</dc:source>
	<dc:source>10.18196/jrc.v1i5</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journal.umy.ac.id/index.php/jrc/article/view/7988/5157</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2020 Journal of Robotics and Control (JRC)</dc:rights>
</oai_dc:dc>