Proposing Utilization of Photovoltaic (PV) Source into Power Distribution Network Using University of Port Harcourt as a Case Study

Journal of Robotics and Control (JRC) · Vol. 2 No. 4 (2021) · hlm. 274–282

DOI
10.18196/jrc.2491
ISSN
2715-5072, 2715-5056
Terbit
2021-07-01
Penerbit
Universitas Muhammadiyah Yogyakarta
Bahasa
eng

Abstrak

Relying on Power Holding Company of Nigeria (PHCN) for power distribution in University of Port Harcourt (Uniport) has not really helped in satisfying the overall power requirements, considering the fact that alternative renewable sources of power exist in its environs and tapping into it will help ameliorate these challenges. This work involves proposing utilization of photovoltaic (PV) source into power distribution using Uniport as a case study. Solar radiation profile was obtained as latitude 40o48.1 oN and longitude 6o55.9oE with average clearance index of 4.37kwh/m2/day. Solar altitude, angle of incidence, azimuth, global solar value in kw/m2 were recorded as well as models for PV, battery bank and converter components formulated. Moreso, sensitivity and optimization studies including systems architecture, load and PV output for the solar network was carried out. User specified variables such as appliance peak power, total energy produced/consumed per day, total amount to be invested as well as lifespan of solar generating plant. Overall cost of solar PV amounted to about Two billion, seven hundred and forty million, six hundred thousand naira (N2, 740,600,000) for a twenty-four (24) hour power supply. Operation and maintenance cost for a projection of twenty-five (25) years (OPEX was also determined to be Ninety-six million, five hundred thousand naira (N96, 500,000:00). At 25 years, amount that must have been spent on bills to PHEDC for consuming maximum of ten (10) hours of electrical power is about Seven billion, eight hundred and sixteen million, three hundred and thirty-one thousand, one hundred naira (N 7,816,331,100:00). This implies that if Uniport decides to jettison PHEDC for the next twenty-five (25) years and want to be sure of a guaranteed 24 hours’ power supply, it would have saved a total of Five billion, and seventy-five million, seven hundred and thirty-one thousand, one hundred naira (N5,075,731,100:00). Furthermore, generated power by this design is 7500MWhr but the load consumed in a year is 7100MWhr/year given an excess used power of 400MWhr/year. This excess power can be sold thereby creating extra profit for the institution.

Kata kunci

Jaringan kolaborasi para penulis

3 penulis · 2 tautan kepenulisan bersama · 1 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • University of Port Harcourt
  • University of Benin
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Onohaebi S.OUniversity of Benin1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.umy.ac.id/index.php/jrc/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Proposing Utilization of Photovoltaic (PV) Source into Power Distribution Network Using University of Port Harcourt as a Case Study</dc:title>
	<dc:creator>Eseosa, Omorogiuwa</dc:creator>
	<dc:creator>Wariboko, Noel Iloayira</dc:creator>
	<dc:subject xml:lang="en-US">PHCN</dc:subject>
	<dc:subject xml:lang="en-US">PHEDC</dc:subject>
	<dc:subject xml:lang="en-US">PHOTOVOLTAIC</dc:subject>
	<dc:subject xml:lang="en-US">UNIPORT</dc:subject>
	<dc:subject xml:lang="en-US">RENEWABLE ENERGY</dc:subject>
	<dc:description xml:lang="en-US">Relying on Power Holding Company of Nigeria (PHCN) for power distribution in University of Port Harcourt (Uniport) has not really helped in satisfying the overall power requirements, considering the fact that alternative renewable sources of power exist in its environs and tapping into it will help ameliorate these challenges. This work involves proposing utilization of photovoltaic (PV) source into power distribution using Uniport as a case study. Solar radiation profile was obtained as latitude 40o48.1 oN and longitude 6o55.9oE with average clearance index of 4.37kwh/m2/day. Solar altitude, angle of incidence, azimuth, global solar value in kw/m2 were recorded as well as models for PV, battery bank and converter components formulated. Moreso, sensitivity and optimization studies including systems architecture, load and PV output for the solar network was carried out. User specified variables such as appliance peak power, total energy produced/consumed per day, total amount to be invested as well as lifespan of solar generating plant. Overall cost of solar PV amounted to about Two billion, seven hundred and forty million, six hundred thousand naira (N2, 740,600,000) for a twenty-four (24) hour power supply. Operation and maintenance cost for a projection of twenty-five (25) years (OPEX was also determined to be Ninety-six million, five hundred thousand naira (N96, 500,000:00). At 25 years, amount that must have been spent on bills to PHEDC for consuming maximum of ten (10) hours of electrical power is about Seven billion, eight hundred and sixteen million, three hundred and thirty-one thousand, one hundred naira (N 7,816,331,100:00). This implies that if Uniport decides to jettison PHEDC for the next twenty-five (25) years and want to be sure of a guaranteed 24 hours’ power supply, it would have saved a total of Five billion, and seventy-five million, seven hundred and thirty-one thousand, one hundred naira (N5,075,731,100:00). Furthermore, generated power by this design is 7500MWhr but the load consumed in a year is 7100MWhr/year given an excess used power of 400MWhr/year. This excess power can be sold thereby creating extra profit for the institution.</dc:description>
	<dc:publisher xml:lang="en-US">Universitas Muhammadiyah Yogyakarta</dc:publisher>
	<dc:date>2021-07-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.umy.ac.id/index.php/jrc/article/view/10115</dc:identifier>
	<dc:identifier>10.18196/jrc.2491</dc:identifier>
	<dc:source xml:lang="en-US">Journal of Robotics and Control (JRC); Vol. 2 No. 4 (2021): July; 274-282</dc:source>
	<dc:source>2715-5072</dc:source>
	<dc:source>2715-5056</dc:source>
	<dc:source>10.18196/jrc.v2i4</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journal.umy.ac.id/index.php/jrc/article/view/10115/5827</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2020 Journal of Robotics and Control (JRC)</dc:rights>
</oai_dc:dc>