Enhanced SARIMAX and Gradient Boosting Load Forecasting for Photovoltaic Integration and Transformer Expansion Planning in a 132/33-kV Substation

Journal of Robotics and Control (JRC) · Vol. 7 No. 3 (2026) · hlm. 3784–3801

DOI
10.18196/jrc.v7i3.28869
ISSN
2715-5072, 2715-5056
Terbit
2026-05-01
Penerbit
Universitas Muhammadiyah Yogyakarta
Bahasa
eng
Lisensi
creativecommons.org/licenses/by-sa/4.0

Abstrak

Accurate load forecasting is critical for secure and efficient power system operation in rapidly growing regions such as the Nineveh Governorate in Iraq. This study proposes an integrated framework that couples data-driven daily load forecasting with network scenario analysis to support multi-year expansion planning for an overloaded 132/33 kV substation. The research contribution is an end-to-end pipeline in which daily demand forecasts from a seasonal ARIMA model with exogenous variables (SARIMAX) are used to drive photovoltaic (PV) and transformer reinforcement studies on a real Iraqi grid. A tailored feature-engineering strategy combining climatic, temporal and demographic variables is employed to train and compare two models: a Gradient Boosting regressor and the SARIMAX time-series model. Using strictly time-ordered data from 2022 to 2024, the latter delivers superior accuracy (R² = 0.999998 with very low MAE and RMSE), and residual diagnostics confirm that remaining errors are negligible relative to monthly peak loads. Forecasts for (2025–2030) are then used to define two PVsyst and ETAP expansion scenarios – 18 MW grid-connected PV plant and the installation of the transformer of 25 MVA. Both options provide significant transformer loading reduction and safe operation, and the PV plant option also ensures lower dependence on the upstream grid and emissions, and the second transformer option provides N+1 redundancy in the event of high demand. The modular structure is transferable to other Networks in Iraq after retraining and local validation as was shown in substation tests in Mosul, and could be expanded to include other planning and operational conditions.

Kata kunci

Jaringan kolaborasi para penulis

12 penulis · 18 tautan kepenulisan bersama · 6 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • University of Mosul
  • Universiti Sains Malaysia
  • University of Technology Malaysia
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Wisam NajemUniversity of Mosul1
Shaker Mahmood KhudherUniversity of Mosul1
Mustafa AljammalUniversity of Mosul1
Karam Khairullah MohammedUniversity of Technology Malaysia1
Ali AbbawiUniversity of Mosul1
Ibrahim Ismael AlnaibUniversity of Mosul1
Hiba Nadhim A. Al-KaoazUniversity of Mosul1
Mohd Fadzil AinUniversiti Sains Malaysia1
Mohamad Kamarol Mohd JamilUniversiti Sains Malaysia1
Mazyed A. Al-TakUniversiti Sains Malaysia1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.umy.ac.id/index.php/jrc/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Enhanced SARIMAX and Gradient Boosting Load Forecasting for Photovoltaic Integration and Transformer Expansion Planning in a 132/33-kV Substation</dc:title>
	<dc:creator>Mustafa, Anas </dc:creator>
	<dc:creator>alyozbaky, Omar</dc:creator>
	<dc:subject xml:lang="en-US">Electrical Load Forecasting</dc:subject>
	<dc:subject xml:lang="en-US">Machine Learning</dc:subject>
	<dc:subject xml:lang="en-US">SARIMAX</dc:subject>
	<dc:subject xml:lang="en-US">Gradient Boosting</dc:subject>
	<dc:subject xml:lang="en-US">Photovoltaic (PV) Integration</dc:subject>
	<dc:subject xml:lang="en-US">Power Grid Flexibility</dc:subject>
	<dc:description xml:lang="en-US">Accurate load forecasting is critical for secure and efficient power system operation in rapidly growing regions such as the Nineveh Governorate in Iraq. This study proposes an integrated framework that couples data-driven daily load forecasting with network scenario analysis to support multi-year expansion planning for an overloaded 132/33 kV substation. The research contribution is an end-to-end pipeline in which daily demand forecasts from a seasonal ARIMA model with exogenous variables (SARIMAX) are used to drive photovoltaic (PV) and transformer reinforcement studies on a real Iraqi grid. A tailored feature-engineering strategy combining climatic, temporal and demographic variables is employed to train and compare two models: a Gradient Boosting regressor and the SARIMAX time-series model. Using strictly time-ordered data from 2022 to 2024, the latter delivers superior accuracy (R² = 0.999998 with very low MAE and RMSE), and residual diagnostics confirm that remaining errors are negligible relative to monthly peak loads. Forecasts for (2025–2030) are then used to define two PVsyst and ETAP expansion scenarios – 18 MW grid-connected PV plant and the installation of the transformer of 25 MVA. Both options provide significant transformer loading reduction and safe operation, and the PV plant option also ensures lower dependence on the upstream grid and emissions, and the second transformer option provides N+1 redundancy in the event of high demand. The modular structure is transferable to other Networks in Iraq after retraining and local validation as was shown in substation tests in Mosul, and could be expanded to include other planning and operational conditions.</dc:description>
	<dc:publisher xml:lang="en-US">Universitas Muhammadiyah Yogyakarta</dc:publisher>
	<dc:date>2026-05-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.umy.ac.id/index.php/jrc/article/view/28869</dc:identifier>
	<dc:identifier>10.18196/jrc.v7i3.28869</dc:identifier>
	<dc:source xml:lang="en-US">Journal of Robotics and Control (JRC); Vol. 7 No. 3 (2026); 3784-3801</dc:source>
	<dc:source>2715-5072</dc:source>
	<dc:source>2715-5056</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journal.umy.ac.id/index.php/jrc/article/view/28869/12563</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2026 Anas  Mustafa, Omar alyozbaky</dc:rights>
	<dc:rights xml:lang="en-US">https://creativecommons.org/licenses/by-sa/4.0</dc:rights>
</oai_dc:dc>