Melola Discovery

← Melola Discovery

Jurnal SINTA 1

The Development of Ungauged-Catchment Integrated-Similarity Unit Hydrograph to Estimate Inflow of Wonogiri Reservoir

Journal of the Civil Engineering Forum · Vol. 9 No. 3 (2023) · hlm. 239–250

DOI
10.22146/jcef.7051
ISSN
2549-5925, 2581-1037
Terbit
2023-07-24
Penerbit
Department of Civil and Environmental Engineering, Faculty of Engineering, Universitas Gadjah Mada
Bahasa
eng

Abstrak

The Wonogiri Reservoir is a multipurpose reservoir at the Upper Bengawan Solo Watershed, primarily designed to serve as a flood control system. However, there is no accurate estimation of the inflow into the reservoir due to the limited availability of hydrological stations. Observations showed only four out of ten unit hydrographs of the Wonogiri Reservoir watershed. Therefore, this study was conducted to apply an integrated similarity-based approach for designing unit hydrographs in ungauged catchments. The process involved evaluating the integrated similarity between pairs of gauged-ungauged catchments using hydrologic and physical property parameters. This led to the selection of the donor or gauged catchment with the highest similarity score to develop the unit hydrograph for the ungauged catchments. The developed UHs were further applied to estimate the reservoir inflow for the December 25, 2007, flood event. The results showed that the computed peak discharge was 10.9% lower than a previous study. Subsequently, the HEC-HMS simulation model was used to project the updated design flood hydrographs to the reservoir. The design rainfall was derived from automatic rainfall recorder (ARR) and PERSIANN satellite-based data. The ARR data showed that the extreme rainfall duration was 5 hours while satellite data indicated 6 hours. The application of the ARR 5-hour duration to the updated flood hydrographs led to a peak discharge of 5123 m3 s-1, 7041 m3 s-1, and 10,370 m3 s-1 for the 60-year, 500-year, and PMF floods respectively in line with the flood design criteria of Wonogiri Reservoir. These estimates were observed to be significantly higher than the 1982 design floods which were 4000 m3 s-1, 5100 m3 s-1, and 9600 m3 s-1 respectively. This updated flood control design was important to renew the operation rule of the Wonogiri reservoir during flood periods.

Kata kunci

Jaringan kolaborasi para penulis

9 penulis · 14 tautan kepenulisan bersama · 1 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Universitas Gadjah Mada
  • Politeknik Negeri Bali
  • University of Bangka Belitung
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Muhammad MujiburrakhmanUniversity of Bangka Belitung2
Indra NurdianyotoAfiliasi tidak diketahui2
Fransisca Natania Karina RediastiUniversitas Gadjah Mada1
Bambang TriatmodjoUniversitas Gadjah Mada1
I Made Marsa ArsanaPoliteknik Negeri Bali1
Ni Luh Linda MuliasihPoliteknik Negeri Bali1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://jurnal.ugm.ac.id/v3/jcef/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 16 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">The Development of Ungauged-Catchment Integrated-Similarity Unit Hydrograph to Estimate Inflow of Wonogiri Reservoir</dc:title>
	<dc:creator>Santoso, Kurniawan Putra</dc:creator>
	<dc:creator>Istiarto</dc:creator>
	<dc:creator>Jayadi, Rachmad</dc:creator>
	<dc:subject xml:lang="en-US">Ungauged Catchment</dc:subject>
	<dc:subject xml:lang="en-US">Integrated Similarity</dc:subject>
	<dc:subject xml:lang="en-US">Unit Hydrograph</dc:subject>
	<dc:subject xml:lang="en-US">Wonogiri Reservoir Flood Inflow</dc:subject>
	<dc:subject xml:lang="en-US">HEC-HMS</dc:subject>
	<dc:description xml:lang="en-US">The Wonogiri Reservoir is a multipurpose reservoir at the Upper Bengawan Solo Watershed, primarily designed to serve as a flood control system. However, there is no accurate estimation of the inflow into the reservoir due to the limited availability of hydrological stations. Observations showed only four out of ten unit hydrographs of the Wonogiri Reservoir watershed. Therefore, this study was conducted to apply an integrated similarity-based approach for designing unit hydrographs in ungauged catchments. The process involved evaluating the integrated similarity between pairs of gauged-ungauged catchments using hydrologic and physical property parameters. This led to the selection of the donor or gauged catchment with the highest similarity score to develop the unit hydrograph for the ungauged catchments. The developed UHs were further applied to estimate the reservoir inflow for the December 25, 2007, flood event. The results showed that the computed peak discharge was 10.9% lower than a previous study. Subsequently, the HEC-HMS simulation model was used to project the updated design flood hydrographs to the reservoir. The design rainfall was derived from automatic rainfall recorder (ARR) and PERSIANN satellite-based data. The ARR data showed that the extreme rainfall duration was 5 hours while satellite data indicated 6 hours. The application of the ARR 5-hour duration to the updated flood hydrographs led to a peak discharge of 5123 m3 s-1, 7041 m3 s-1, and 10,370 m3 s-1 for the 60-year, 500-year, and PMF floods respectively in line with the flood design criteria of Wonogiri Reservoir. These estimates were observed to be significantly higher than the 1982 design floods which were 4000 m3 s-1, 5100 m3 s-1, and 9600 m3 s-1 respectively. This updated flood control design was important to renew the operation rule of the Wonogiri reservoir during flood periods.
&amp;nbsp;</dc:description>
	<dc:publisher xml:lang="en-US">Department of Civil and Environmental Engineering, Faculty of Engineering, Universitas Gadjah Mada</dc:publisher>
	<dc:date>2023-07-24</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://jurnal.ugm.ac.id/v3/JCEF/article/view/7051</dc:identifier>
	<dc:identifier>10.22146/jcef.7051</dc:identifier>
	<dc:source xml:lang="en-US">Journal of the Civil Engineering Forum; Vol. 9 No. 3 (September 2023); 239-250</dc:source>
	<dc:source>2549-5925</dc:source>
	<dc:source>2581-1037</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://jurnal.ugm.ac.id/v3/JCEF/article/view/7051/3077</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2023 The Author(s)</dc:rights>
</oai_dc:dc>