Melola Discovery

← Melola Discovery

Jurnal SINTA 1

Study on Basic Requirements and Critical Success Factors (CSFs) of Implementing Availability Payment in Public-Private Partnership in Regency/Municipal Government: A Case Study of Public Street Lighting in Bandung Municipal and Madiun Regency

Journal of the Civil Engineering Forum · Vol. 10 No. 3 (2024) · hlm. 287–298

DOI
10.22146/jcef.12564
ISSN
2549-5925, 2581-1037
Terbit
2024-09-10
Penerbit
Department of Civil and Environmental Engineering, Faculty of Engineering, Universitas Gadjah Mada
Bahasa
eng

Abstrak

Referring to PPP Books 2017-2023 issued by The Ministry of National Development Planning of Indonesia, there is only 1 out of 16 AP PPP projects at the municipal/regency level that have successfully reached the operational stage (6% success rate), i.e. Madiun Regency Public Street Lighting. Several municipal/regency AP PPP projects have failed, for example, Bandung Municipal Public Street Lighting. The widespread failures indicate that the application of AP in regional infrastructure has so far not been successful in Indonesia. This paper aims to identify the basic requirements, critical success factors, and lessons learned from AP PPP implementation in Municipal/Regency Governments. Thus, it is hoped that the future provision of regional infrastructure with the AP scheme can proceed seamlessly. This study used a mixed-method approach that combines qualitative and quantitative data from literature reviews, questionnaires, and interviews. The results showed that the basic requirements for AP PPP include the existence of regulations and institutions. The five main success factors of AP PPP in the Municipal/Regency Government are (1) a well-organized and committed public agency; (2) political support; (3) favorable and efficient legal framework; (4) stable political and economic situation; and (5) public and private sector commitments and responsibilities. The lesson learned from the case study is that fiscal capacity is not the main factor in the success of PPP in Madiun Regency, but rather the willingness of the local government to implement PPP by regularly holding capacity building and maintaining good relationships and communication with each stakeholder involved.

Kata kunci

Jaringan kolaborasi para penulis

10 penulis · 19 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Bandung Institute of Technology
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Puti Farida TaminBandung Institute of Technology1
Faisol ShahabBandung Institute of Technology1
Irika WidiasantiBandung Institute of Technology1
Adrianto OktavianusBandung Institute of Technology1
Ratih Dewi ShimaBandung Institute of Technology1
Krishna Suryanto PribadiBandung Institute of Technology1
Kevin Andika HartonoBandung Institute of Technology1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://jurnal.ugm.ac.id/v3/jcef/oai, pertama di-harvest 9 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Study on Basic Requirements and Critical Success Factors (CSFs) of Implementing Availability Payment in Public-Private Partnership in Regency/Municipal Government: A Case Study of Public Street Lighting in Bandung Municipal and Madiun Regency</dc:title>
	<dc:creator>Shodiqi, Alia Zata Izzati</dc:creator>
	<dc:creator>Tamin, Rizal Z.</dc:creator>
	<dc:creator>Mahani, Iris</dc:creator>
	<dc:subject xml:lang="en-US">Availability Payment</dc:subject>
	<dc:subject xml:lang="en-US">Critical Success Factors</dc:subject>
	<dc:subject xml:lang="en-US">Lessons Learned</dc:subject>
	<dc:subject xml:lang="en-US">Public-Private Partnership</dc:subject>
	<dc:subject xml:lang="en-US">Public Street Lighting</dc:subject>
	<dc:description xml:lang="en-US">Referring to PPP Books 2017-2023 issued by The Ministry of National Development Planning of Indonesia, there is only 1 out of 16 AP PPP projects at the municipal/regency level that have successfully reached the operational stage (6% success rate), i.e. Madiun Regency Public Street Lighting. Several municipal/regency AP PPP projects have failed, for example, Bandung Municipal Public Street Lighting. The widespread failures indicate that the application of AP in regional infrastructure has so far not been successful in Indonesia. This paper aims to identify the basic requirements, critical success factors, and lessons learned from AP PPP implementation in Municipal/Regency Governments. Thus, it is hoped that the future provision of regional infrastructure with the AP scheme can proceed seamlessly. This study used a mixed-method approach that combines qualitative and quantitative data from literature reviews, questionnaires, and interviews. The results showed that the basic requirements for AP PPP include the existence of regulations and institutions. The five main success factors of AP PPP in the Municipal/Regency Government are (1) a well-organized and committed public agency; (2) political support; (3) favorable and efficient legal framework; (4) stable political and economic situation; and (5) public and private sector commitments and responsibilities. The lesson learned from the case study is that fiscal capacity is not the main factor in the success of PPP in Madiun Regency, but rather the willingness of the local government to implement PPP by regularly holding capacity building and maintaining good relationships and communication with each stakeholder involved.</dc:description>
	<dc:publisher xml:lang="en-US">Department of Civil and Environmental Engineering, Faculty of Engineering, Universitas Gadjah Mada</dc:publisher>
	<dc:date>2024-09-10</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://jurnal.ugm.ac.id/v3/JCEF/article/view/12564</dc:identifier>
	<dc:identifier>10.22146/jcef.12564</dc:identifier>
	<dc:source xml:lang="en-US">Journal of the Civil Engineering Forum; Vol. 10 No. 3 (September 2024); 287-298</dc:source>
	<dc:source>2549-5925</dc:source>
	<dc:source>2581-1037</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://jurnal.ugm.ac.id/v3/JCEF/article/view/12564/4918</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2024 The Author(s)</dc:rights>
</oai_dc:dc>