An Integrated Analysis of Shut-In Well Reactivation for Oil Production Optimization in The DLN-11 Well

Scientific Contributions Oil and Gas · Vol. 49 No. 1 (2026) · hlm. 247–266

DOI
10.29017/scog.v49i1.2012
ISSN
2541-0520, 2089-3361
Terbit
2026-03-03
Penerbit
Testing Center for Oil and Gas LEMIGAS
Bahasa
eng
Lisensi
creativecommons.org/licenses/by/4.0

Abstrak

DLN-11 well was temporarily shut-in due to excessive water production, which became the main issue causing a decline in daily oil production. Therefore, this study conducted an integrated analysis to determine the cause of excessive water production, so that appropriate mitigation measures could be implemented, as well as to formulate a well reactivation strategy aimed at optimizing oil production. The methodology in this study was carried out in an integrated manner through technical and economic evaluations. The technical analysis began with the application of the Chan diagnostic plot as an initial mitigation step, followed by the evaluation of data logging, core analysis data, and production data as advanced mitigation steps to obtain appropriate solutions for addressing production-related issues. In addition, an economic analysis was conducted as a basis for decision-making within a risk management framework. Based on the results of the integrated analysis between the Chan diagnostic plot method and cement evaluation data from Cement Bond Log (CBL), Variable Density Log (VDL) dan Ultra Sonic Imaging Tool (USIT), the high water cut in DLN-11 well, as a reactivation candidate, was caused by water channeling due to the presence of free pipe conditions, where the cement did not properly isolate the annulus between the casing and the formation. To overcome this issue, remedial cementing was carried out to improve the quality of cement bonding. Furthermore, based on the evaluation results of the C/O Log, DLN-11 well still owns five potential oil-bearing zones that can be produced. The reactivation strategy was implemented by opening the interval of 7927-7942 ftMD, resulting in a production rate of 549 BOPD with a water cut of 82%. The economic analysis results indicate that DLN-11 well yields an NPV of 1,256,000 US$, an IRR of 247.5%, and a Pay Out Time (POT) of 3 months and 16 days. Therefore, from both technical and economic perspectives, the implemented reactivation strategy for DLN-11 well has proven to increase oil production and generate positive economic indicators.

Kata kunci

Jaringan kolaborasi para penulis

39 penulis · 154 tautan kepenulisan bersama · 43 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Universitas Pembangunan Nasional Veteran Yogyakarta
  • Bandung Institute of Technology
  • Pertamina (Indonesia)
  • Universitas Darma Persada
  • University of Malaya
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Ndaru CahyaningtyasUniversitas Pembangunan Nasional Veteran Yogyakarta4
Karina LarasatiUniversitas Pembangunan Nasional Veteran Yogyakarta4
Dimas Suryo WicaksonoUniversitas Pembangunan Nasional Veteran Yogyakarta4
Indah WidiyaningsihUniversitas Pembangunan Nasional Veteran Yogyakarta3
Dewi AsmorowatiBandung Institute of Technology2
Boni SwadesiUniversitas Pembangunan Nasional Veteran Yogyakarta2
Tri Bagus PrabowoUniversitas Darma Persada2
Nur SuhascaryoUniversitas Pembangunan Nasional Veteran Yogyakarta2
Defi RustamiPertamina (Indonesia)2
Rahajeng Suryo RahmadhiniUniversitas Pembangunan Nasional Veteran Yogyakarta2
Carin Nova AzzariaPertamina (Indonesia)2
Eko Widi PramudyohadiAfiliasi tidak diketahui1
Hariyadi HariyadiUniversitas Pembangunan Nasional Veteran Yogyakarta1
Aditya Fahrizal KurniawanUniversitas Pembangunan Nasional Veteran Yogyakarta1
Unggul Setiadi NursidikUniversitas Pembangunan Nasional Veteran Yogyakarta1
Muhammad Rizky Rahmadsyah LubisPertamina (Indonesia)1
Mahruri SanmurjanaAfiliasi tidak diketahui1
Taufan MarhaendrajanaBandung Institute of Technology1
Tutuka AriadjiBandung Institute of Technology1
Ardhi Hakim Lumban GaolBandung Institute of Technology1
Miftah HidayatBandung Institute of Technology1
Fanata Yudha NugrahaUniversitas Pembangunan Nasional Veteran Yogyakarta1
Azhar Faari FatahillahAfiliasi tidak diketahui1
Dian Indri AstutiAfiliasi tidak diketahui1
Muhammad NurcholisAfiliasi tidak diketahui1
Aris BuntoroUniversitas Pembangunan Nasional Veteran Yogyakarta1
Allen Haryanto LukmanaUniversitas Pembangunan Nasional Veteran Yogyakarta1
Teddy Eka PutraPertamina (Indonesia)1
Zulhemi AmirUniversity of Malaya1
Sayoga Heru PrayitnoUniversitas Pembangunan Nasional Veteran Yogyakarta1
Mia Ferian HelmyUniversitas Pembangunan Nasional Veteran Yogyakarta1
Bintang PramudithaUniversitas Pembangunan Nasional Veteran Yogyakarta1
Dedi KristantoUniversitas Pembangunan Nasional Veteran Yogyakarta1
Vania Raina StephanieUniversitas Pembangunan Nasional Veteran Yogyakarta1
Gondo IrawanPertamina (Indonesia)1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.lemigas.esdm.go.id/index.php/SCOG/oai, pertama di-harvest 10 Nov 2026, terakhir terlihat 10 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">An Integrated Analysis of Shut-In Well Reactivation for Oil Production Optimization in The DLN-11 Well</dc:title>
	<dc:creator xml:lang="en"> Kristanto, Dedi</dc:creator>
	<dc:creator xml:lang="en">Yusgiantoro, Luky Agung</dc:creator>
	<dc:creator xml:lang="en">Hariyadi</dc:creator>
	<dc:creator xml:lang="en">Paradhita, Windyanesha</dc:creator>
	<dc:subject xml:lang="en">shut-in well</dc:subject>
	<dc:subject xml:lang="en">excessive water production</dc:subject>
	<dc:subject xml:lang="en">reactivation</dc:subject>
	<dc:subject xml:lang="en">optimization</dc:subject>
	<dc:description xml:lang="en">DLN-11 well was temporarily shut-in due to excessive water production, which became the main issue causing a decline in daily oil production. Therefore, this study conducted an integrated analysis to determine the cause of excessive water production, so that appropriate mitigation measures could be implemented, as well as to formulate a well reactivation strategy aimed at optimizing oil production. The methodology in this study was carried out in an integrated manner through technical and economic evaluations. The technical analysis began with the application of the Chan diagnostic plot as an initial mitigation step, followed by the evaluation of data logging, core analysis data, and production data as advanced mitigation steps to obtain appropriate solutions for addressing production-related issues. In addition, an economic analysis was conducted as a basis for decision-making within a risk management framework. Based on the results of the integrated analysis between the Chan diagnostic plot method and cement evaluation data from Cement Bond Log (CBL), Variable Density Log (VDL) dan Ultra Sonic Imaging Tool (USIT), the high water cut in DLN-11 well, as a reactivation candidate, was caused by water channeling due to the presence of free pipe conditions, where the cement did not properly isolate the annulus between the casing and the formation. To overcome this issue, remedial cementing was carried out to improve the quality of cement bonding. Furthermore, based on the evaluation results of the C/O Log, DLN-11 well still owns five potential oil-bearing zones that can be produced. The reactivation strategy was implemented by opening the interval of 7927-7942 ftMD, resulting in a production rate of 549 BOPD with a water cut of 82%. The economic analysis results indicate that DLN-11 well yields an NPV of 1,256,000 US$, an IRR of 247.5%, and a Pay Out Time (POT) of 3 months and 16 days. Therefore, from both technical and economic perspectives, the implemented reactivation strategy for DLN-11 well has proven to increase oil production and generate positive economic indicators.</dc:description>
	<dc:publisher xml:lang="en">Testing Center for Oil and Gas LEMIGAS</dc:publisher>
	<dc:date>2026-03-03</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.lemigas.esdm.go.id/index.php/SCOG/article/view/2012</dc:identifier>
	<dc:identifier>10.29017/scog.v49i1.2012</dc:identifier>
	<dc:source xml:lang="en">Scientific Contributions Oil and Gas; Vol. 49 No. 1 (2026); 247-266</dc:source>
	<dc:source xml:lang="id">Scientific Contributions Oil and Gas; Vol 49 No 1 (2026); 247-266</dc:source>
	<dc:source>2541-0520</dc:source>
	<dc:source>2089-3361</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journal.lemigas.esdm.go.id/index.php/SCOG/article/view/2012/1651</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2026 © Copyright by Authors. Published by LEMIGAS</dc:rights>
	<dc:rights xml:lang="en">https://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>