Melola Discovery

← Melola Discovery

Akses terbuka Jurnal SINTA 1

Determination of an Appropriate Method and Economic Cost Estimation for Plug and Abandonment of H-11 Well in The Tambun Field

Scientific Contributions Oil and Gas · Vol. 49 No. 3 (2026) · hlm. 153–170

DOI
10.29017/scog.v49i3.2141
ISSN
2541-0520, 2089-3361
Terbit
2026-08-26
Penerbit
Testing Center for Oil and Gas LEMIGAS
Bahasa
eng
Lisensi
creativecommons.org/licenses/by-sa/4.0

Abstrak

In accordance with Indonesian regulations, oil and gas wells approaching the end of their productive life and no longer economically viable must undergo plug and abandon (P&A) operations. The associated costs are the responsibility of the operating company. Therefore, operator must conduct technical and economic assessments to ensure that P&A operations are performed cost-effectively while complying with safety requirements, operational standards, and applicable national regulations. This study compares two plugs and abandonment methods for a directional well by evaluating the technical and economic performance of the SNI 13-6910-2002 and NORSOK Standard D-010. The Tambun field comprises several production wells, including the H-11 well, which was selected as the reference case for planning permanent abandonment after reaching its economic limit. The P&A design was developed by identifying the well sections requiring cement isolation and calculating the required volumes of cement, additives, and completion fluids using the rig-based abandonment method. The results provide an appropriate abandonment strategy and costs estimate for the tH-11 well based on both standards. The estimated abandonment cost is USD 505,737.59 using SNI 13-6910-2002, compared with USD 1,170,558.11 using NORSOK Standard D-010. Based on the comprehensive technical assessment, operational safety considerations, regulatory compliance, and economic evaluation, SNI 13-6910-2002 is recommended as the most suitable method for the permanent plug and abandonment of the H-11 well in Tambun field.

Kata kunci

Jaringan kolaborasi para penulis

24 penulis · 84 tautan kepenulisan bersama · 26 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Universitas Pembangunan Nasional Veteran Yogyakarta
  • Pertamina (Indonesia)
  • Universitas Darma Persada
  • University of Malaya
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Dedi KristantoUniversitas Pembangunan Nasional Veteran Yogyakarta6
HariyadiUniversitas Pembangunan Nasional Veteran Yogyakarta4
Rahajeng Suryo RahmadhiniUniversitas Pembangunan Nasional Veteran Yogyakarta2
Carin Nova AzzariaPertamina (Indonesia)2
Tri Bagus PrabowoUniversitas Darma Persada1
Fanata Yudha NugrahaUniversitas Pembangunan Nasional Veteran Yogyakarta1
Ndaru CahyaningtyasUniversitas Pembangunan Nasional Veteran Yogyakarta1
Azhar Faari FatahillahAfiliasi tidak diketahui1
Dian Indri AstutiAfiliasi tidak diketahui1
Windyanesha ParadhitaUniversitas Pembangunan Nasional Veteran Yogyakarta1
Muhammad NurcholisAfiliasi tidak diketahui1
Aris BuntoroUniversitas Pembangunan Nasional Veteran Yogyakarta1
Allen Haryanto LukmanaUniversitas Pembangunan Nasional Veteran Yogyakarta1
Boni SwadesiUniversitas Pembangunan Nasional Veteran Yogyakarta1
Teddy Eka PutraPertamina (Indonesia)1
Zulhemi AmirUniversity of Malaya1
Nur SuhascaryoUniversitas Pembangunan Nasional Veteran Yogyakarta1
Defi RustamiPertamina (Indonesia)1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.lemigas.esdm.go.id/index.php/SCOG/oai, pertama di-harvest 10 Nov 2026, terakhir terlihat 10 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">Determination of an Appropriate Method and Economic Cost Estimation for Plug and Abandonment of H-11 Well in The Tambun Field</dc:title>
	<dc:creator xml:lang="en"> Yusgiantoro, Luky Agung</dc:creator>
	<dc:creator xml:lang="en">Kristanto, Dedi</dc:creator>
	<dc:creator xml:lang="en">Wicaksono, Dimas Suryo </dc:creator>
	<dc:creator xml:lang="en">Larasati, Karina</dc:creator>
	<dc:creator xml:lang="en">Stephanie, Vania Raina</dc:creator>
	<dc:creator xml:lang="en">Irawan, Gondo </dc:creator>
	<dc:subject xml:lang="en">plug and abandonment</dc:subject>
	<dc:subject xml:lang="en">cost estimation</dc:subject>
	<dc:subject xml:lang="en">cement plug</dc:subject>
	<dc:subject xml:lang="en">SNI 13-6910-2002</dc:subject>
	<dc:subject xml:lang="en">NORSOK Standard D-010</dc:subject>
	<dc:description xml:lang="en">In accordance with Indonesian regulations, oil and gas wells approaching the end of their productive life and no longer economically viable must undergo plug and abandon (P&amp;amp;A) operations. The associated costs are the responsibility of the operating company. Therefore, operator must conduct technical and economic assessments to ensure that P&amp;amp;A operations are performed cost-effectively while complying with safety requirements, operational standards, and applicable national regulations. This study compares two plugs and abandonment methods for a directional well by evaluating the technical and economic performance of the SNI 13-6910-2002 and NORSOK Standard D-010. The Tambun field comprises several production wells, including the H-11 well, which was selected as the reference case  for planning permanent abandonment after reaching its economic limit. The P&amp;amp;A design was developed by identifying the well sections requiring cement isolation and calculating the required volumes of  cement, additives, and completion fluids using the rig-based abandonment method. The results provide an appropriate abandonment strategy and costs estimate for the tH-11 well based on both standards. The estimated abandonment cost is USD 505,737.59 using SNI 13-6910-2002, compared with USD 1,170,558.11 using NORSOK Standard D-010. Based on the comprehensive technical assessment, operational safety considerations, regulatory compliance, and economic evaluation, SNI 13-6910-2002 is recommended as the most suitable method for the permanent plug and abandonment of the H-11 well in Tambun field.</dc:description>
	<dc:publisher xml:lang="en">Testing Center for Oil and Gas LEMIGAS</dc:publisher>
	<dc:date>2026-08-26</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.lemigas.esdm.go.id/index.php/SCOG/article/view/2141</dc:identifier>
	<dc:identifier>10.29017/scog.v49i3.2141</dc:identifier>
	<dc:source xml:lang="en">Scientific Contributions Oil and Gas; Vol. 49 No. 3 (2026); 153-170</dc:source>
	<dc:source xml:lang="id">Scientific Contributions Oil and Gas; Vol 49 No 3 (2026); 153-170</dc:source>
	<dc:source>2541-0520</dc:source>
	<dc:source>2089-3361</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journal.lemigas.esdm.go.id/index.php/SCOG/article/view/2141/1754</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2026 Copyright by Authors. Published by LEMIGAS</dc:rights>
	<dc:rights xml:lang="en">https://creativecommons.org/licenses/by-sa/4.0</dc:rights>
</oai_dc:dc>