Melola Discovery

← Melola Discovery

Akses terbuka Jurnal Tanpa peringkat SINTA

Analisis Kestabilan Heap Leach Pad Berdasarkan Jumlah Material Yang Dapat Ditampung Pada Projek Tambang XX, Jawa Barat

Mining Science and Technology Journal · Vol. 2 No. 1 (2023) · hlm. 39–53

DOI
10.54297/minetech-journal.v2i1.441
ISSN
2962-4339
Terbit
2023-04-03
Penerbit
Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara
Bahasa
eng
Lisensi
creativecommons.org/licenses/by/4.0

Abstrak

The XX mining project is one of the gold mining companies in Indonesia that uses the heap leaching method to separate gold from other rocks. But it turns out that this heap leaching pile has a maximum capacity with a total volume of 14000 m3. In order to obtain an optimal slope design from a current slope condition on the planned location of the Heap Leach Pad in the XX mining project so that the cause of the heap failure can be determined with certainty, a geotechnical analysis was carried out referring to the Decree of the Minister of Energy and Mineral Resources Number 1827 K/30/MEM/2018. In this study, slope stability analysis was carried out using the boundary equilibrium method. The data used is secondary data obtained directly from the XX mining project and laboratory test data. Tests carried out in the laboratory are to determine the value of rock density and shear strength test to determine the value of the inner shear angle and rock cohesion. In the slope modeling, the condition of water pressure is assumed to be maximum and the slope of the heap leaching pile is composed of soil and propylene. From the results of the analysis it was found that the slope was in an unstable condition when the heap leaching capacity was 11000 m3. So it needs to be handled, namely providing recommendations by reducing the height of the slope which was originally 1 meter to 0.5 meters. Keywords: Heap Leaching, Slope Stability, Boundary Equilibrium Method

Jaringan kolaborasi para penulis

3 penulis · 2 tautan kepenulisan bersama · 1 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Syarif Hidayatullah State Islamic University Jakarta
  • Sriwijaya University
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Lusitania LusitaniaSriwijaya University1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://jurnal-unsultra.ac.id/index.php/minetech/oai, pertama di-harvest 30 Okt 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Analisis Kestabilan Heap Leach Pad Berdasarkan Jumlah Material Yang Dapat Ditampung Pada Projek Tambang XX, Jawa Barat</dc:title>
	<dc:creator>Razak, Supardi</dc:creator>
	<dc:creator>Kusumaningsih, Dewi Ayu</dc:creator>
	<dc:description xml:lang="en-US">The XX mining project is one of the gold mining companies in Indonesia that uses the heap leaching method to separate gold from other rocks. But it turns out that this heap leaching pile has a maximum capacity with a total volume of 14000 m3. In order to obtain an optimal slope design from a current slope condition on the planned location of the Heap Leach Pad in the XX mining project so that the cause of the heap failure can be determined with certainty, a geotechnical analysis was carried out referring to the Decree of the Minister of Energy and Mineral Resources Number 1827 K/30/MEM/2018 . In this study, slope stability analysis was carried out using the boundary equilibrium method. The data used is secondary data obtained directly from the XX mining project and laboratory test data. Tests carried out in the laboratory are to determine the value of rock density and shear strength test to determine the value of the inner shear angle and rock cohesion. In the slope modeling, the condition of water pressure is assumed to be maximum and the slope of the heap leaching pile is composed of soil and propylene. From the results of the analysis it was found that the slope was in an unstable condition when the heap leaching capacity was 11000 m3. So it needs to be handled, namely providing recommendations by reducing the height of the slope which was originally 1 meter to 0.5 meters. 
&amp;nbsp;
Keywords: Heap Leaching, Slope Stability, Boundary Equilibrium Method</dc:description>
	<dc:publisher xml:lang="en-US">Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara</dc:publisher>
	<dc:date>2023-04-03</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://jurnal-unsultra.ac.id/index.php/minetech/article/view/441</dc:identifier>
	<dc:identifier>10.54297/minetech-journal.v2i1.441</dc:identifier>
	<dc:source xml:lang="en-US">Mining Science And Technology Journal; Vol 2 No 1 (2023): Mining Science and Technology Journal; 39-53</dc:source>
	<dc:source>2962-4339</dc:source>
	<dc:source>10.54297/minetech-journal.v2i1</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://jurnal-unsultra.ac.id/index.php/minetech/article/view/441/260</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2023 Supardi Razak, Dewi Ayu Kusumaningsih</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>