Melola Discovery

← Melola Discovery

Jurnal SINTA 1

THE SELECTION OF PRODUCTIVITY KEY PERFORMANCE INDICATORS FOR CAR MANUFACTURING COMPANIES USING INTEGRATED PERFORMANCE MEASUREMENT SYSTEM

Sinergi · Vol. 22 No. 2 (2018) · hlm. 101–106

DOI
10.22441/sinergi.2018.2.005
ISSN
2460-1217, 1410-2331
Terbit
2018-06-27
Penerbit
Universitas Mercu Buana
Bahasa
eng

Abstrak

The increase in car market 17% in 2020, and ASEAN Free Trade policy only 5% for imported products, cause tightened competition in the automotive market. Car manufacturing companies face problems in selecting their performance indicators related to competitive challenges. The purpose of this research is to develop productivity key performance indicators in car manufacturing that conform to stakeholder requirements as a strategy to win the market. The conditions are manifested in a mapping of manufacturing symbols using the Integrated Performance Measurement System (IPMS) method. That manufacturing productivity indicators will become the focus of the top management to be controlled. There are four stages to go through, starting with the identification of stakeholder requirement, which produces six criteria and 12 stakeholder requirements and mapped into 16 goals and 24 key performance indicator (KPI). The second stage is benchmarking, and preparation of KPI hierarchy and the third stage is the description of each KPI in the form of KPI specification table. The fourth stage is the weighting of the six main criteria that result in 3 priority criteria which must be reported monthly between the manufacturing division (painting), finance and administration. Those are employee safety, manufacturing process effectiveness (painting) and waste elimination activities. The priority is obtained based on questionnaires answered by ten stakeholders (experts) processed with Analytical Hierarchy Process (AHP) approach and has been tested consistency in the number 0.09. These three criteria are described in 15 KPIs: performance rate, availability rate, quality rate, trained operator ratio, training value ratio> 80, delay ratio, attendance ratio, downtime losses, setup and adjustment losses, idle time, defect losses, yield losses, manpower efficiency, environmental impact and work accident ratio.

Kata kunci

Jaringan kolaborasi para penulis

14 penulis · 28 tautan kepenulisan bersama · 8 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Mercu Buana University
  • Binus University
  • IPB University
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Dyah Lestari WidaningrumBinus University1
Amelia MeiliaBinus University1
Samuel Nata CharisBinus University1
Fransisca Dini AriyantiBinus University1
Galang P. N. HakimMercu Buana University1
Hendi HerlambangMercu Buana University1
Irkham Syifaul QulubAfiliasi tidak diketahui1
Lutfi SaputroMercu Buana University1
M. Syamsul MaarifIPB University1
Machfud MachfudIPB University1
Noer Azam AchsaniIPB University1
Ani SuryaniIPB University1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://publikasi.mercubuana.ac.id/index.php/sinergi/oai, pertama di-harvest 10 Nov 2026, terakhir terlihat 16 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">THE SELECTION OF PRODUCTIVITY KEY PERFORMANCE INDICATORS FOR CAR MANUFACTURING COMPANIES USING INTEGRATED PERFORMANCE MEASUREMENT SYSTEM</dc:title>
	<dc:creator>Amrina, Uly</dc:creator>
	<dc:creator>Firdaus, Alfa</dc:creator>
	<dc:subject xml:lang="en-US">Mapping</dc:subject>
	<dc:subject xml:lang="en-US">Productivity</dc:subject>
	<dc:subject xml:lang="en-US">Indicators IPMS</dc:subject>
	<dc:subject xml:lang="en-US">AHP</dc:subject>
	<dc:description xml:lang="en-US">The increase in car market 17% in 2020, and ASEAN Free Trade policy only 5% for imported products, cause tightened competition in the automotive market. Car manufacturing companies face problems in selecting their performance indicators related to competitive challenges. The purpose of this research is to develop productivity key performance indicators in car manufacturing that conform to stakeholder requirements as a strategy to win the market. The conditions are manifested in a mapping of manufacturing symbols using the Integrated Performance Measurement System (IPMS) method. That manufacturing productivity indicators will become the focus of the top management to be controlled. There are four stages to go through, starting with the identification of stakeholder requirement, which produces six criteria and 12 stakeholder requirements and mapped into 16 goals and 24 key performance indicator (KPI). The second stage is benchmarking, and preparation of KPI hierarchy and the third stage is the description of each KPI in the form of KPI specification table. The fourth stage is the weighting of the six main criteria that result in 3 priority criteria which must be reported monthly between the manufacturing division (painting), finance and administration. Those are employee safety, manufacturing process effectiveness (painting) and waste elimination activities. The priority is obtained based on questionnaires answered by ten stakeholders (experts) processed with Analytical Hierarchy Process (AHP) approach and has been tested consistency in the number 0.09. These three criteria are described in 15 KPIs: performance rate, availability rate, quality rate, trained operator ratio, training value ratio&amp;gt; 80, delay ratio, attendance ratio, downtime losses, setup and adjustment losses, idle time, defect losses, yield losses, manpower efficiency, environmental impact and work accident ratio. </dc:description>
	<dc:publisher xml:lang="en-US">Universitas Mercu Buana</dc:publisher>
	<dc:date>2018-06-27</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://publikasi.mercubuana.ac.id/index.php/sinergi/article/view/2709</dc:identifier>
	<dc:identifier>10.22441/sinergi.2018.2.005</dc:identifier>
	<dc:source xml:lang="en-US">SINERGI; Vol. 22 No. 2 (2018); 101-106</dc:source>
	<dc:source>2460-1217</dc:source>
	<dc:source>1410-2331</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://publikasi.mercubuana.ac.id/index.php/sinergi/article/view/2709/1725</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2018 SINERGI</dc:rights>
</oai_dc:dc>