OPERATIONAL COST REDUCTION OF GAS-THERMAL POWER PLANT BASED ON BAT ALGORITHM

Sinergi · Vol. 25 No. 2 (2021) · hlm. 185–194

DOI
10.22441/sinergi.2021.2.010
ISSN
2460-1217, 1410-2331
Terbit
2021-02-20
Penerbit
Universitas Mercu Buana
Bahasa
eng

Abstrak

An optimised operation of a thermal power plant is required to optimise fuel consumption cost. It is still high and becomes a problem of economic dispatch in the operation of the plant. Load scheduling and generator capacity are needed to get optimal plant operation, especially energy usage. This paper presented a thermal power plant operation analysis to obtain optimum operational energy costs using the Bat Algorithm (BA). The actual data of 6 thermal power plants to serve the peak loads in 2018 is used for the calculation. The problem solution is simulated and calculated using maximum (95%) capacity and the BA method. The Simulation is done by using MATLAB software. The generator unit and generator load characteristics are collected to obtain objective functions and constraint functions. BA completes this function to get the lowest energy. The BA method will be compared with the calculation of real-time energy generation without BA to analyse its accuracy. The total operational cost of the actual power plant without BA is $ 1,988,410. BA simulation gave the total energy cost is $1,653,374. So, the generated energy savings is 16.85%, or 335,036 MW reduction.

Kata kunci

Jaringan kolaborasi para penulis

4 penulis · 4 tautan kepenulisan bersama · 1 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • National Institute of Science and Technology
  • Politeknik Enjinering Indorama
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Aris SuryadiPoliteknik Enjinering Indorama1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://publikasi.mercubuana.ac.id/index.php/sinergi/oai, pertama di-harvest 10 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">OPERATIONAL COST REDUCTION OF GAS-THERMAL POWER PLANT BASED ON BAT ALGORITHM</dc:title>
	<dc:creator>Sofwan, Agus</dc:creator>
	<dc:creator>Febriansyah, M.</dc:creator>
	<dc:creator>Sugeng, Sugeng</dc:creator>
	<dc:subject xml:lang="en-US">Economic Load Dispatch</dc:subject>
	<dc:subject xml:lang="en-US">Operational Cost</dc:subject>
	<dc:subject xml:lang="en-US">Optimisation</dc:subject>
	<dc:subject xml:lang="en-US">Real-Time</dc:subject>
	<dc:subject xml:lang="en-US">Thermal Power Plant</dc:subject>
	<dc:description xml:lang="en-US">An optimised operation of a thermal power plant is required to optimise fuel consumption cost. It is still high and becomes a problem of economic dispatch in the operation of the plant. Load scheduling and generator capacity are needed to get optimal plant operation, especially energy usage. This paper presented a thermal power plant operation analysis to obtain optimum operational energy costs using the Bat Algorithm (BA). The actual data of 6 thermal power plants to serve the peak loads in 2018 is used for the calculation. The problem solution is simulated and calculated using maximum (95%) capacity and the BA method. The Simulation is done by using MATLAB software. The generator unit and generator load characteristics are collected to obtain objective functions and constraint functions. BA completes this function to get the lowest energy. The BA method will be compared with the calculation of real-time energy generation without BA to analyse its accuracy. The total operational cost of the actual power plant without BA is $ 1,988,410. BA simulation gave the total energy cost is $1,653,374. So, the generated energy savings is 16.85%, or 335,036 MW reduction. </dc:description>
	<dc:publisher xml:lang="en-US">Universitas Mercu Buana</dc:publisher>
	<dc:date>2021-02-20</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://publikasi.mercubuana.ac.id/index.php/sinergi/article/view/8793</dc:identifier>
	<dc:identifier>10.22441/sinergi.2021.2.010</dc:identifier>
	<dc:source xml:lang="en-US">SINERGI; Vol. 25 No. 2 (2021); 185-194</dc:source>
	<dc:source>2460-1217</dc:source>
	<dc:source>1410-2331</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://publikasi.mercubuana.ac.id/index.php/sinergi/article/view/8793/4208</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2021 SINERGI</dc:rights>
</oai_dc:dc>