Abstract

By analyzing the implementation of this project work is expected to know the comparison between the plan and the realization, the effectiveness of the time executor and factors affecting the effectiveness of implementation on road reconstruction work. The medhod used in this research is to take data in the form of curve S, RAB, back up data, weekly report, montly report and questonnaire data for factors that influence the implementation of extreme weather factors, coordination factor between agencies, factors of delay in material testing, experience of executor and tool availability factor with analysis using SPSS mean rank application. Based on the result of reviewing and data analyzing, the time that occurs in the implementation of the road reconstruction work has been delayed due to get minus deviation value, than is in February – 0,225 %, March – 4,855 %, April -10,118 %, May – 20,606 %, June – 37,379 %, July – 57,111 %, August – 55,379 %. Data for the value of the effectiveness of work on aggregate class B in April 0,4 months Mei 0,87, June 0,90, July 0,87, August 0,87. Aggregate of class A in May 0,13, June 0,17, month of July 0,35, month of August 0,90 and work of asphalting AC-BC its effectiveness value is 0,4. The data for factor affecting effectveness of implementation based on mean rank analysis ie extreme weather 3,0, coordination between intances 3,30, material testing delay 2,90, execution experience 2,90, availability of tools 2,90s

Collaboration network of the authors

40 authors · 121 co-authorship links · 6 across different organisations · showing the 40 most connected

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Sulawesi Tenggara
  • World Bank
  • Institut Agama Islam Negeri Kendari
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Sufrianto SufriantoUniversitas Sulawesi Tenggara20
Hujiyanto HujiyantoUniversitas Sulawesi Tenggara10
Vickky Anggara IlhamUniversitas Sulawesi Tenggara9
Sulaiman SulaimanUniversitas Sulawesi Tenggara9
Sitti HawaUniversitas Sulawesi Tenggara5
Catrin SudardjatUniversitas Sulawesi Tenggara4
Hakiman HakimanUniversitas Sulawesi Tenggara3
Haryono HaryonoUniversitas Sulawesi Tenggara3
Andi MakkawaruUniversitas Sulawesi Tenggara2
Hayadi HayadiUniversitas Sulawesi Tenggara2
La Ode Muhamad MagribiUniversitas Sulawesi Tenggara2
Sunaryo SunaryoUniversitas Sulawesi Tenggara2
Syamsuddin SyamsuddinUniversitas Sulawesi Tenggara2
Arsum Rheza Djaya SaputraUniversitas Sulawesi Tenggara2
La Ode Ahmad RasyidAffiliation unknown2
Komang Agus SaputraUniversitas Sulawesi Tenggara1
Andi Kukuh SetiawanUniversitas Sulawesi Tenggara1
Hado HadoUniversitas Sulawesi Tenggara1
Catrin SudardjatUniversitas Sulawesi Tenggara1
Syamsuddin SyamsuddinUniversitas Sulawesi Tenggara1
Sri Jayani SafitriUniversitas Sulawesi Tenggara1
Nurmaida NurmaidaUniversitas Sulawesi Tenggara1
Andi Makkawaru Isazarni JassinAffiliation unknown1
Hado HadoUniversitas Sulawesi Tenggara1
Syamsuddin SyamsuddinUniversitas Sulawesi Tenggara1
M BasriUniversitas Sulawesi Tenggara1
Sulaiman sulaimanAffiliation unknown1
La Ode Muh MagribiUniversitas Sulawesi Tenggara1
Sumariyani SumariyaniWorld Bank1
Dian FitrawansyahUniversitas Sulawesi Tenggara1
Eko Efendi JuantoroUniversitas Sulawesi Tenggara1
La Ode Munawal Akbar IdatiUniversitas Sulawesi Tenggara1
Syamsuddin SyamsuddinInstitut Agama Islam Negeri Kendari1
Al MustahyunUniversitas Sulawesi Tenggara1
Neti RahmawatiAffiliation unknown1
Sulaiman SulaimanUniversitas Sulawesi Tenggara1
La Derita FlorentinusUniversitas Sulawesi Tenggara1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://jurnal-unsultra.ac.id/index.php/scej/oai, first harvested 30 Okt 2026, last seen 30 Okt 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Efektifitas Waktu Pelaksanaan Pekerjaan Rekonstruksi Jalan Wolo –Batas Kota Kolaka – Rate Rate</dc:title>
	<dc:creator>Ahmad, Ahmad</dc:creator>
	<dc:creator>Lakawa, Irwan</dc:creator>
	<dc:creator>Rachmat, La Ode Musa</dc:creator>
	<dc:description xml:lang="en-US">By analyzing the implementation of this project work is expected to know the comparison between the plan and the realization, the effectiveness of the time executor and factors affecting the effectiveness of implementation on road reconstruction work. The medhod used in this research is to take data in the form of curve S, RAB, back up data, weekly report, montly report and questonnaire data for factors that influence the implementation of extreme weather factors, coordination factor between agencies, factors of delay in material testing, experience of executor and tool availability factor with analysis using SPSS mean rank application. Based on the result of reviewing and data analyzing, the time that occurs in the implementation of the road reconstruction work has been delayed due to get minus deviation value, than is in February – 0,225 %, March – 4,855 %, April -10,118 %, May – 20,606 %, June – 37,379 %, July – 57,111 %, August – 55,379 %. Data for the value of the effectiveness of work on aggregate class B in April 0,4 months Mei 0,87, June 0,90, July 0,87, August 0,87. Aggregate of class A in May 0,13, June 0,17, month of July 0,35, month of August 0,90 and work of asphalting AC-BC its effectiveness value is 0,4. The data for factor affecting effectveness of implementation based on mean rank analysis ie extreme weather 3,0, coordination between intances 3,30, material testing delay 2,90, execution experience 2,90, availability of tools 2,90s</dc:description>
	<dc:publisher xml:lang="en-US">Universitas Sulawesi Tenggara</dc:publisher>
	<dc:date>2020-06-08</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://jurnal-unsultra.ac.id/index.php/scej/article/view/50</dc:identifier>
	<dc:identifier>10.54297/sciej.v1i1.50</dc:identifier>
	<dc:source xml:lang="en-US">Sultra Civil Engineering Journal (SCiEJ); Vol 1 No 1 (2020): Sultra Civil Engineering Journal (SCiEJ); 1-17</dc:source>
	<dc:source>2716-1714</dc:source>
	<dc:source>10.54297/sciej.v1i1</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://jurnal-unsultra.ac.id/index.php/scej/article/view/50/38</dc:relation>
	<dc:relation>10.54297/sciej.v1i1.50.g38</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2020 Ahmad Ahmad, Irwan Lakawa, La Ode Musa Rachmat</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>