Melola Discovery

← Melola Discovery

Open access Jurnal SINTA 5

Analysis Of Work Delay In Slum Quality Improvement Project Puday-Lapulu

Sultra Civil Engineering Journal (SCiEJ) · Vol. 4 No. 1 (2023) · pp. 43–54

DOI
10.54297/sciej.v4i1.461
ISSN
2716-1714
Published
2023-04-29
Publisher
Universitas Sulawesi Tenggara
Language
eng
License
creativecommons.org/licenses/by/4.0

Abstract

A construction project is an activity that aims to build facilities and infrastructure within the planned timeframe. The project can be defined as an organized effort or activity that uses the available budget and resources that must be achieved to achieve important goals, objectives, and expectations using the existing budget and resources, which must be completed within the planned timeframe so that the project does not experience delays. The purpose of this study was to determine how much work delays, the factors that cause work delays and how much influence the delay factors have on work delays in the Puday- Lapulu Slums Quality Improvement Project. The results of this study indicate the value of SV is Rp. (- 8.25 %) While the value of SPI < 1 is 0.896 < 1, based on the criteria for the value of SV and SPI, it can be said that the work is late and has poor performance. Factors that influence delays are aspects of labor and materials. While the large influence of delay factors on work delays that is 10,9 %.

Collaboration network of the authors

40 authors · 132 co-authorship links · showing the 40 most connected

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Sulawesi Tenggara
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Irwan LakawaUniversitas Sulawesi Tenggara33
Vickky Anggara IlhamUniversitas Sulawesi Tenggara11
Andi MakkawaruUniversitas Sulawesi Tenggara7
Catrin SudardjatUniversitas Sulawesi Tenggara6
Hado HadoUniversitas Sulawesi Tenggara5
Hakiman HakimanUniversitas Sulawesi Tenggara5
Muhammad MuhsarUniversitas Sulawesi Tenggara5
Andi Makkawaru Isazarny JassinUniversitas Sulawesi Tenggara4
Sulaiman SulaimanUniversitas Sulawesi Tenggara4
Sunaryo SunaryoUniversitas Sulawesi Tenggara3
Haryono HaryonoUniversitas Sulawesi Tenggara3
Fikri Aris MunandarUniversitas Sulawesi Tenggara3
La Ode Musa RachmatUniversitas Sulawesi Tenggara2
Lisman LismanUniversitas Sulawesi Tenggara2
La Ode Abdul MananUniversitas Sulawesi Tenggara2
Erni DanggiUniversitas Sulawesi Tenggara2
Haryono HaryonoUniversitas Sulawesi Tenggara2
Komang Agus SaputraUniversitas Sulawesi Tenggara2
Andi Kukuh SetiawanUniversitas Sulawesi Tenggara2
Andi Makkawaru Isazarni JassinAffiliation unknown2
Syamsuddin SyamsuddinUniversitas Sulawesi Tenggara2
La Ode BariunUniversitas Sulawesi Tenggara1
Humairah MuljabarUniversitas Sulawesi Tenggara1
La Ode Muhammad Isman Hardiansyah BariunAffiliation unknown1
Joko Tri BrataUniversitas Sulawesi Tenggara1
Arsalim ArsalimUniversitas Sulawesi Tenggara1
Aswad AswadUniversitas Sulawesi Tenggara1
Syamsuddin SyamsuddinUniversitas Sulawesi Tenggara1
Hado HadoUniversitas Sulawesi Tenggara1
Catrin SudardjatUniversitas Sulawesi Tenggara1
Syamsuddin SyamsuddinUniversitas Sulawesi Tenggara1
Sri Jayani SafitriUniversitas Sulawesi Tenggara1
Nurmaida NurmaidaUniversitas Sulawesi Tenggara1
Hajar HajarUniversitas Sulawesi Tenggara1
Farra SasmitaUniversitas Sulawesi Tenggara1
Erni DanggiUniversitas Sulawesi Tenggara1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://jurnal-unsultra.ac.id/index.php/scej/oai, first harvested 30 Okt 2026, last seen 30 Okt 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Analysis Of Work Delay In Slum Quality Improvement Project Puday-Lapulu</dc:title>
	<dc:creator>Ardika, Made</dc:creator>
	<dc:creator>Sufrianto, Sufrianto</dc:creator>
	<dc:creator>Hujiyanto, Hujiyanto</dc:creator>
	<dc:creator>Hawa, Sitti</dc:creator>
	<dc:description xml:lang="en-US">A construction project is an activity that aims to build facilities and infrastructure within the planned timeframe. The project can be defined as an organized effort or activity that uses the available budget and resources that must be achieved to achieve important goals, objectives, and expectations using the existing budget and resources, which must be completed within the planned timeframe so that the project does not experience delays. The purpose of this study was to determine how much work delays, the factors that cause work delays and how much influence the delay factors have on work delays in the Puday- Lapulu Slums Quality Improvement Project.
The results of this study indicate the value of SV is Rp. (- 8.25 %) While the value of SPI &amp;lt; 1 is 0.896 &amp;lt; 1, based on the criteria for the value of SV and SPI, it can be said that the work is late and has poor performance. Factors that influence delays are aspects of labor and materials. While the large influence of delay factors on work delays that is 10,9 %.</dc:description>
	<dc:publisher xml:lang="en-US">Universitas Sulawesi Tenggara</dc:publisher>
	<dc:date>2023-04-29</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://jurnal-unsultra.ac.id/index.php/scej/article/view/461</dc:identifier>
	<dc:identifier>10.54297/sciej.v4i1.461</dc:identifier>
	<dc:source xml:lang="en-US">Sultra Civil Engineering Journal (SCiEJ); Vol 4 No 1 (2023): Sultra Civil Engineering Journal (SCiEJ); 43-54</dc:source>
	<dc:source>2716-1714</dc:source>
	<dc:source>10.54297/sciej.v4i1</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://jurnal-unsultra.ac.id/index.php/scej/article/view/461/280</dc:relation>
	<dc:relation>10.54297/sciej.v4i1.461.g280</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2023 Made Ardika, Sufrianto Sufrianto, Hujiyanto Hujiyanto, Sitti Hawa</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>