Analisis Perbandingan Upah Harian dengan Borongan (Studi Kasus Proyek Peningkatan Kualitas Permukiman Kumuh Desa Lagasa)

Sultra Civil Engineering Journal (SCiEJ) · Vol. 4 No. 2 (2023) · pp. 140–148

DOI
10.54297/sciej.v4i2.528
ISSN
2716-1714
Published
2023-10-25
Publisher
Universitas Sulawesi Tenggara
Language
eng
License
creativecommons.org/licenses/by/4.0

Abstract

There are several types of wage systems in a construction project, including a time-based wage system, namely providing wages based on time for work that has been carried out by craftsmen, such as daily work. There is also a piece rate wage system, which provides wages directly based on the amount of workmanship produced by the craftsman. Contractors must be careful in providing wages to workers, so that the work is in accordance with the planned time, whether the contractor benefits or not. If the work time is less or even ineffective for the journeyman, then it is certain that the contractor will suffer losses because the resulting productivity is small. Based on the analysis for the productivity of daily workers and piece workers, the productivity of piece workers is greater than that of daily workers in the work of Improving the Quality of Lagasa Village Slum Settlements. For piece work on taluds for area A it is 62.47 m3/day, while daily work on taluds for area A is 7,809 m3/day, for work on drainage for area B it is 78.15 m^1/day while daily work on drainage for area B is 9, 77 m^1/day and for wholesale block paving work in area C it is 526.65 m^2/day while daily block paving work in area C is 65.83083 m^2/day

Collaboration network of the authors

40 authors · 122 co-authorship links · 4 across different organisations · showing the 40 most connected

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Sulawesi Tenggara
  • Institut Agama Islam Negeri Kendari
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Irwan LakawaUniversitas Sulawesi Tenggara30
Hujiyanto HujiyantoUniversitas Sulawesi Tenggara10
Andi MakkawaruUniversitas Sulawesi Tenggara9
Catrin SudardjatUniversitas Sulawesi Tenggara8
Hado HadoUniversitas Sulawesi Tenggara6
Sitti HawaUniversitas Sulawesi Tenggara5
Andi Makkawaru Isazarny JassinUniversitas Sulawesi Tenggara4
Muhammad MuhsarUniversitas Sulawesi Tenggara4
Sunaryo SunaryoUniversitas Sulawesi Tenggara3
Fikri Aris MunandarUniversitas Sulawesi Tenggara3
Haryono HaryonoUniversitas Sulawesi Tenggara2
Erni DanggiUniversitas Sulawesi Tenggara2
La Ode Musa RachmatUniversitas Sulawesi Tenggara2
La Ode Abdul MananUniversitas Sulawesi Tenggara2
Erni DanggiUniversitas Sulawesi Tenggara2
Haryono HaryonoUniversitas Sulawesi Tenggara2
Komang Agus SaputraUniversitas Sulawesi Tenggara2
Andi Kukuh SetiawanUniversitas Sulawesi Tenggara2
Andi Makkawaru Isazarni JassinAffiliation unknown2
Syamsuddin SyamsuddinUniversitas Sulawesi Tenggara2
Syamsuddin SyamsuddinInstitut Agama Islam Negeri Kendari2
La Ode BariunUniversitas Sulawesi Tenggara1
Humairah MuljabarUniversitas Sulawesi Tenggara1
La Ode Muhammad Isman Hardiansyah BariunAffiliation unknown1
Joko Tri BrataUniversitas Sulawesi Tenggara1
Arsalim ArsalimUniversitas Sulawesi Tenggara1
Aswad AswadUniversitas Sulawesi Tenggara1
Syamsuddin SyamsuddinUniversitas Sulawesi Tenggara1
Hajar HajarUniversitas Sulawesi Tenggara1
Farra SasmitaUniversitas Sulawesi Tenggara1
Eko Efendi JuantoroUniversitas Sulawesi Tenggara1
La Ode Muhamad MagribiUniversitas Sulawesi Tenggara1
Ramadhan Hidayat PutraUniversitas Sulawesi Tenggara1
Amad Syarif SyukriAffiliation unknown1
Catrin SudarjatUniversitas Sulawesi Tenggara1
Suhardin MangidiUniversitas Sulawesi Tenggara1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://jurnal-unsultra.ac.id/index.php/scej/oai, first harvested 30 Okt 2026, last seen 30 Okt 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Analisis Perbandingan Upah Harian dengan Borongan (Studi Kasus Proyek Peningkatan Kualitas Permukiman Kumuh Desa Lagasa)</dc:title>
	<dc:creator>Lisman, Lisman</dc:creator>
	<dc:creator>Sufrianto, Sufrianto</dc:creator>
	<dc:creator>Hakiman, Hakiman</dc:creator>
	<dc:creator>Ilham, Vickky Anggara</dc:creator>
	<dc:description xml:lang="en-US">There are several types of wage systems in a construction project, including a time-based wage system, namely providing wages based on time for work that has been carried out by craftsmen, such as daily work. There is also a piece rate wage system, which provides wages directly based on the amount of workmanship produced by the craftsman. Contractors must be careful in providing wages to workers, so that the work is in accordance with the planned time, whether the contractor benefits or not. If the work time is less or even ineffective for the journeyman, then it is certain that the contractor will suffer losses because the resulting productivity is small. Based on the analysis for the productivity of daily workers and piece workers, the productivity of piece workers is greater than that of daily workers in the work of Improving the Quality of Lagasa Village Slum Settlements. For piece work on taluds for area A it is 62.47 m3/day, while daily work on taluds for area A is 7,809 m3/day, for work on drainage for area B it is 78.15 m^1/day while daily work on drainage for area B is 9, 77 m^1/day and for wholesale block paving work in area C it is 526.65 m^2/day while daily block paving work in area C is 65.83083 m^2/day</dc:description>
	<dc:publisher xml:lang="en-US">Universitas Sulawesi Tenggara</dc:publisher>
	<dc:date>2023-10-25</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://jurnal-unsultra.ac.id/index.php/scej/article/view/528</dc:identifier>
	<dc:identifier>10.54297/sciej.v4i2.528</dc:identifier>
	<dc:source xml:lang="en-US">Sultra Civil Engineering Journal (SCiEJ); Vol 4 No 2 (2023): Sultra Civil Engineering Journal (SCiEJ); 140-148</dc:source>
	<dc:source>2716-1714</dc:source>
	<dc:source>10.54297/sciej.v4i2</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://jurnal-unsultra.ac.id/index.php/scej/article/view/528/314</dc:relation>
	<dc:relation>10.54297/sciej.v4i2.528.g314</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2023 Lisman Lisman, Sufrianto Sufrianto, Hakiman Hakiman, Vickky Anggara Ilham</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>