Abstrak

Integrating solar energy into a coal-fired power plant is a promising way to reduce auxiliary load and numerous environmental issues related to the coal-based power generation sector. This paper will discuss the annual performance of PV plant 689 kWp at ash disposal that integrated into 615 MW coal-fired power plant PT xxx, including an estimate of total potential energy that can be generated; analysis of auxiliary load to improve performance and decreasing pollutant emissions by coal consumption reduction. The PV Plant has been operated for at least 2 years, built on an area of 5,000m2, is an On-grid PV Plant system with 11 grid Inverters and has 2,120 solar modules installed. Based on the simulation using Helioscope software, it can generate electrical energy up to 977,442 kWh per year with a performance ratio of 79.3%. The result of the PV plant utilization evaluation shows the amount of electrical energy produced is 1,096,105 kWh in 2021, above the estimation from the simulation. This result means auxiliary power load was decreasing by 0.4932%, It is also considered to be able to save the use of 263.065 kiloliters per year of diesel and also save the use of coal up to 386.634 tons or equivalent to 0.007% coal consumption per year. From an environmental point of view, it is also assessed to reduce CO2 emissions equivalent to 920.729 tons/year and the equivalent of planting 4,602 trees per year.

Kata kunci

Jaringan kolaborasi para penulis

24 penulis · 82 tautan kepenulisan bersama · 43 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Diponegoro University
  • Universitas Negeri Padang
  • National Research and Innovation Agency
  • Sriwijaya University
  • Medan Area University
  • Hiroshima University
  • Ulsan National Institute of Science and Technology
  • Organisasi lain
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Singgih SaptadiDiponegoro University2
Yudiartono YudiartonoNational Research and Innovation Agency1
Adiarso AdiarsoNational Research and Innovation Agency1
Gusni SushantiHiroshima University1
Muhammad Djoni BustanSriwijaya University1
Sri HaryatiSriwijaya University1
Dori YuvendaUniversitas Negeri Padang1
Remon LapisaUniversitas Negeri Padang1
Krismadinata KrismadinataUniversitas Negeri Padang1
Sri Rizki Putri PrimandariUniversitas Negeri Padang1
Andre KurniawanUniversitas Negeri Padang1
Mulianti MuliantiUniversitas Negeri Padang1
Yus Donald ChaniagoUlsan National Institute of Science and Technology1
Habib SatriaMedan Area University1
Rahmad B. Y. SyahMedan Area University1
Sapto NisworoUniversitas Tidar1
Heri SugitoDiponegoro University1
Kiichiro KagawaUniversity of Fukui1
Ali KhumaeniDiponegoro University1
Nasrullah IdrisUniversitas Syiah Kuala1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) http://teknomekanik.ppj.unp.ac.id/index.php/teknomekanik/oai, pertama di-harvest 10 Nov 2026, terakhir terlihat 16 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">Integrating PV plant 689 kWp into Coal-Fired Power Plant (CFPP) 615 MW at Paiton: To reduce auxiliary load and coal consumption</dc:title>
	<dc:creator xml:lang="en">Albar, Syarief</dc:creator>
	<dc:creator xml:lang="en">Windarta, Jaka</dc:creator>
	<dc:creator xml:lang="en">Wardaya, Asep Yoyo</dc:creator>
	<dc:creator xml:lang="en">Elshaarani, Tarig</dc:creator>
	<dc:subject xml:lang="en">Energy</dc:subject>
	<dc:subject xml:lang="en">PV Plant</dc:subject>
	<dc:subject xml:lang="en">CFPP</dc:subject>
	<dc:subject xml:lang="en">Paiton</dc:subject>
	<dc:subject xml:lang="en">Emission Coal</dc:subject>
	<dc:description xml:lang="en">Integrating solar energy into a coal-fired power plant is a promising way to reduce auxiliary load and numerous environmental issues related to the coal-based power generation sector. This paper will discuss the annual performance of PV plant 689 kWp at ash disposal that integrated into 615 MW coal-fired power plant PT xxx, including an estimate of total potential energy that can be generated; analysis of auxiliary load to improve performance and decreasing pollutant emissions by coal consumption reduction. The PV Plant has been operated for at least 2 years, built on an area of 5,000m2, is an On-grid PV Plant system with 11 grid Inverters and has 2,120 solar modules installed. Based on the simulation using Helioscope software, it can generate electrical energy up to 977,442 kWh per year with a performance ratio of 79.3%. The result of the PV plant utilization evaluation shows the amount of electrical energy produced is 1,096,105 kWh in 2021, above the estimation from the simulation. This result means auxiliary power load was decreasing by 0.4932%, It is also considered to be able to save the use of 263.065 kiloliters per year of diesel and also save the use of coal up to 386.634 tons or equivalent to 0.007% coal consumption per year. From an environmental point of view, it is also assessed to reduce CO2 emissions equivalent to 920.729 tons/year and the equivalent of planting 4,602 trees per year.</dc:description>
	<dc:publisher xml:lang="en">Universitas Negeri Padang</dc:publisher>
	<dc:date>2022-12-17</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>http://teknomekanik.ppj.unp.ac.id/index.php/teknomekanik/article/view/170</dc:identifier>
	<dc:identifier>10.24036/teknomekanik.v5i2.17072</dc:identifier>
	<dc:source xml:lang="en">Teknomekanik; Vol. 5 No. 2 (2022): Regular Issue; 103-111</dc:source>
	<dc:source>2621-8720</dc:source>
	<dc:source>2621-9980</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>http://teknomekanik.ppj.unp.ac.id/index.php/teknomekanik/article/view/170/132</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2022 Syarief Albar, Jaka Windarta, Asep Yoyo Wardaya, Tarig Elshaarani (Author)</dc:rights>
	<dc:rights xml:lang="en">http://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>