Efektivitas Metode Zero One Dalam Manajemen Resiko Pekerjaan Konstruksi Gedung Berlantai (Studi Kasus Gedung Kuliah Fakultas Kehutanan Dan Ilmu Lingkungan Universitas Halu Oleo Kendari)

Sultra Civil Engineering Journal (SCiEJ) · Vol. 5 No. 2 (2024) · pp. 293–299

DOI
10.54297/sciej.v5i2.612
ISSN
2716-1714
Published
2024-10-25
Publisher
Universitas Sulawesi Tenggara
Language
eng
License
creativecommons.org/licenses/by/4.0

Abstract

This study aims to analyze the visibility of the Zero-One method in the construction of the Faculty of Forestry and Environmental Sciences Building, Halu Oleo Kendari University, Southeast Sulawesi. The results of the analysis showed that a weak control system was the main cause of delays and additional costs in this project. This variable has the highest weight, reaching an average of 90.38, in line with secondary data in the form of monthly reports from the project which show that there is a delay of 1-2 weeks of working days in the process of vertical formwork on floor plate work 2-3, this has a major impact on project time and cost. Corrective measures that can be suggested include optimization of staff performance through material training and risk management, as well as better strategies to address weak systems and avoid delays. The results of this analysis also highlight other risks such as errors in budget planning, material expenditure, and inefficient use of materials. This research was conducted by collecting data from 9 respondents involved in the project. In parallel with the secondary findings of the monthly report of the project, it was identified that there were delays in certain construction processes. Addressing efforts include increasing working hours and manpower to catch up with delays and minimize the addition of inefficient costs. The study provides valuable insights for improving risk management and efficiency in construction projects, focusing on cost and time control systems.

Collaboration network of the authors

40 authors · 150 co-authorship links · 8 across different organisations · showing the 40 most connected

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Halu Oleo
  • Universitas Sembilanbelas November Kolaka
  • Universitas Sulawesi Tenggara
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
La WelendoAffiliation unknown7
Siti Nurjanah AhmadUniversitas Halu Oleo6
Baso MursidiAffiliation unknown5
La Ode Muhamad Nurrakhmad ArsyadUniversitas Halu Oleo4
Nasrul NasrulUniversitas Halu Oleo4
Adris Ade PutraAffiliation unknown3
sulha sulhaAffiliation unknown3
Ainussalbi Al IkhsanAffiliation unknown2
Muhammad Syarif PrasetiaAffiliation unknown2
Mappa NasrunAffiliation unknown2
Fathur Rahman RustanUniversitas Sembilanbelas November Kolaka2
La Ode Muhammad Nurrakhmad ArsyadAffiliation unknown2
Fitriah Mas'udAffiliation unknown2
Mappa NashrunAffiliation unknown2
St Nawal JayaUniversitas Halu Oleo2
ARMAN FASLIHAffiliation unknown2
Adris A. PutraAffiliation unknown2
Statiswaty StatiswatyUniversitas Halu Oleo2
Gede Agus SutrayasaUniversitas Halu Oleo2
Laode DenyUniversitas Halu Oleo2
Kadir RamadanUniversitas Halu Oleo2
Galih Adi SulistyoUniversitas Halu Oleo2
Hado HadoUniversitas Sulawesi Tenggara2
Ismayana IsmayanaUniversitas Halu Oleo2
Meri AprianiUniversitas Halu Oleo2
Anafi MinmahddunUniversitas Halu Oleo2
Putri RamadhaniUniversitas Halu Oleo1
Asrullah TondasiUniversitas Halu Oleo1
Ishak KadirUniversitas Halu Oleo1
Albert Rokky PalulunganUniversitas Halu Oleo1
Diki DarmawanAffiliation unknown1
Asraf AsrafAffiliation unknown1
Riswandi RiswandiAffiliation unknown1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://jurnal-unsultra.ac.id/index.php/scej/oai, first harvested 30 Okt 2026, last seen 1 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Efektivitas Metode Zero One Dalam Manajemen Resiko Pekerjaan Konstruksi Gedung Berlantai (Studi Kasus Gedung Kuliah Fakultas Kehutanan Dan Ilmu Lingkungan Universitas Halu Oleo Kendari)</dc:title>
	<dc:creator>Soeparyanto, Try Sugiyarto</dc:creator>
	<dc:creator>Nirah, Jalba</dc:creator>
	<dc:creator>Nuhun, Ridwan Syah</dc:creator>
	<dc:creator>Fadil, La Ode muhammad</dc:creator>
	<dc:creator>Prasetya, Dhalmaz</dc:creator>
	<dc:creator>Putra P, Dwi Bayu</dc:creator>
	<dc:creator>Ali, Muhammad Alfian</dc:creator>
	<dc:description xml:lang="en-US">This study aims to analyze the visibility of the Zero-One method in the construction of the Faculty of Forestry and Environmental Sciences Building, Halu Oleo Kendari University, Southeast Sulawesi. The results of the analysis showed that a weak control system was the main cause of delays and additional costs in this project. This variable has the highest weight, reaching an average of 90.38, in line with secondary data in the form of monthly reports from the project which show that there is a delay of 1-2 weeks of working days in the process of vertical formwork on floor plate work 2-3, this has a major impact on project time and cost. Corrective measures that can be suggested include optimization of staff performance through material training and risk management, as well as better strategies to address weak systems and avoid delays. The results of this analysis also highlight other risks such as errors in budget planning, material expenditure, and inefficient use of materials. This research was conducted by collecting data from 9 respondents involved in the project. In parallel with the secondary findings of the monthly report of the project, it was identified that there were delays in certain construction processes. Addressing efforts include increasing working hours and manpower to catch up with delays and minimize the addition of inefficient costs. The study provides valuable insights for improving risk management and efficiency in construction projects, focusing on cost and time control systems.</dc:description>
	<dc:publisher xml:lang="en-US">Universitas Sulawesi Tenggara</dc:publisher>
	<dc:date>2024-10-25</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://jurnal-unsultra.ac.id/index.php/scej/article/view/612</dc:identifier>
	<dc:identifier>10.54297/sciej.v5i2.612</dc:identifier>
	<dc:source xml:lang="en-US">Sultra Civil Engineering Journal (SCiEJ); Vol 5 No 2 (2024): Sultra Civil Engineering Journal (SCiEJ); 293-299</dc:source>
	<dc:source>2716-1714</dc:source>
	<dc:source>10.54297/sciej.v5i2</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://jurnal-unsultra.ac.id/index.php/scej/article/view/612/402</dc:relation>
	<dc:relation>10.54297/sciej.v5i2.612.g402</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2024 Try Sugiyarto Soeparyanto, Jalba Nirah, Ridwan Syah Nuhun, La Ode muhammad Fadil, Dhalmaz Prasetya, Dwi Bayu Putra P, Muhammad Alfian Ali</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>