Melola Discovery

← Melola Discovery

Open access Jurnal SINTA 5

Analisis Biaya Beton Bertulang Dan Rangka Struktur Baja Pada Gedung Alfamidi Dc Kendari

Sultra Civil Engineering Journal (SCiEJ) · Vol. 6 No. 1 (2025) · pp. 537–544

DOI
10.54297/sciej.v6i1.1095
ISSN
2716-1714
Published
2025-04-29
Publisher
Universitas Sulawesi Tenggara
Language
eng
License
creativecommons.org/licenses/by/4.0

Abstract

Cost is a factor that influences the success and failure of a project. This is a parameter for the success of a project which can be seen from the completion time and minimum costs but with guaranteed quality in accordance with planning. Calculation of the Cost Budget Plan (RAB) is the total product of the quantity or volume of each work item together with the unit price of the work. Budget Plan The total cost of structural calculations using the steel structure method and the concrete structure method. The budget plan for the steel structure method is IDR 24.348.341.722,. and for structural work using the concrete structure method it is IDR. 29.071.552.971,65. In the DC Kendari alfamidi warehouse work, the steel and concrete structure method resulted in a difference of IDR 4.723.211,249,48.. For work items that have significant comparative costs, namely column work in concrete structure method structural work is IDR 7.616.810.069,95 and the planned cost budget for the steel structure method is IDR 3,805,657,473,58. In the Kendari DC Alfamidi warehouse work, the difference is found to be IDR 3.811.152.596,37 which means that work on concrete structure columns is more expensive than concrete structures

Collaboration network of the authors

40 authors · 115 co-authorship links · 11 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Sulawesi Tenggara
  • Institut Agama Islam Negeri Kendari
  • Universitas Islam Negeri Sayyid Ali Rahmatullah Tulungagung
  • Universitas Halu Oleo
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Irwan LakawaUniversitas Sulawesi Tenggara9
Sufrianto SufriantoUniversitas Sulawesi Tenggara9
Hujiyanto HujiyantoUniversitas Sulawesi Tenggara3
Andi MakkawaruUniversitas Sulawesi Tenggara3
Nur AlimInstitut Agama Islam Negeri Kendari2
Catrin SudardjatUniversitas Sulawesi Tenggara2
Hakiman HakimanUniversitas Sulawesi Tenggara2
Titin RetnawatiInstitut Agama Islam Negeri Kendari1
Sulistyorini SulistyoriniUniversitas Islam Negeri Sayyid Ali Rahmatullah Tulungagung1
Kasim KasimInstitut Agama Islam Negeri Kendari1
Abdul KadirInstitut Agama Islam Negeri Kendari1
Komang Agus SaputraUniversitas Sulawesi Tenggara1
Andi Kukuh SetiawanUniversitas Sulawesi Tenggara1
Andi Makkawaru Isazarni JassinAffiliation unknown1
Hado HadoUniversitas Sulawesi Tenggara1
Syamsuddin SyamsuddinUniversitas Sulawesi Tenggara1
La Ode Musa RachmatUniversitas Sulawesi Tenggara1
Sunaryo SunaryoUniversitas Sulawesi Tenggara1
Ramadhan Hidayat PutraUniversitas Sulawesi Tenggara1
Amad Syarif SyukriAffiliation unknown1
Catrin SudarjatUniversitas Sulawesi Tenggara1
Ahmad Syarif SukriUniversitas Halu Oleo1
Alianti AliantiAffiliation unknown1
Muh. Fiqram AbdillahUniversitas Sulawesi Tenggara1
Sulaiman SulaimanUniversitas Sulawesi Tenggara1
La MenudiUniversitas Sulawesi Tenggara1
Febriansyah ArsyadUniversitas Sulawesi Tenggara1
Harjunan HarjunanUniversitas Sulawesi Tenggara1
Lisman LismanUniversitas Sulawesi Tenggara1
Annur Rahmadhani AsanaUniversitas Sulawesi Tenggara1
La Ode Altakdir IlahiUniversitas Sulawesi Tenggara1
Syamsuddin SyamsuddinUniversitas Sulawesi Tenggara1
Heru Dwi FitriawanUniversitas Sulawesi Tenggara1
Wa Ode NadilaUniversitas Sulawesi Tenggara1
Siti Mariam AprillianUniversitas Sulawesi Tenggara1
Wa Ode MiniUniversitas Sulawesi Tenggara1
Anastsya FahiraUniversitas Sulawesi Tenggara1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://jurnal-unsultra.ac.id/index.php/scej/oai, first harvested 30 Okt 2026, last seen 30 Okt 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Analisis Biaya Beton Bertulang Dan Rangka Struktur Baja Pada Gedung Alfamidi Dc Kendari</dc:title>
	<dc:creator>Syamsuddin, Syamsuddin</dc:creator>
	<dc:creator>Ilham, Vickky Anggara</dc:creator>
	<dc:creator>Meilani, Sindi</dc:creator>
	<dc:description xml:lang="en-US">Cost is a factor that influences the success and failure of a project. This is a parameter for the success of a project which can be seen from the completion time and minimum costs but with guaranteed quality in accordance with planning. Calculation of the Cost Budget Plan (RAB) is the total product of the quantity or volume of each work item together with the unit price of the work. Budget Plan The total cost of structural calculations using the steel structure method and the concrete structure method. The budget plan for the steel structure method is IDR 24.348.341.722,. and for structural work using the concrete structure method it is IDR. 29.071.552.971,65. In the DC Kendari alfamidi warehouse work, the steel and concrete structure method resulted in a difference of IDR 4.723.211,249,48. . For work items that have significant comparative costs, namely column work in concrete structure method structural work is IDR 7.616.810.069,95 and the planned cost budget for the steel structure method is IDR 3,805,657,473,58. In the Kendari DC Alfamidi warehouse work, the difference is found to be IDR 3.811.152.596,37 which means that work on concrete structure columns is more expensive than concrete structures</dc:description>
	<dc:publisher xml:lang="en-US">Universitas Sulawesi Tenggara</dc:publisher>
	<dc:date>2025-04-29</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://jurnal-unsultra.ac.id/index.php/scej/article/view/1095</dc:identifier>
	<dc:identifier>10.54297/sciej.v6i1.1095</dc:identifier>
	<dc:source xml:lang="en-US">Sultra Civil Engineering Journal (SCiEJ); Vol 6 No 1 (2025): Sultra Civil Engineering Journal (SCiEJ); 537-544</dc:source>
	<dc:source>2716-1714</dc:source>
	<dc:source>10.54297/sciej.v6i1</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://jurnal-unsultra.ac.id/index.php/scej/article/view/1095/742</dc:relation>
	<dc:relation>10.54297/sciej.v6i1.1095.g742</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2025 Syamsuddin Syamsuddin, Vickky Anggara Ilham, Sindi Meilani</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>