Melola Discovery

← Melola Discovery

Open access Jurnal SINTA 5

Analisis Produktivitas Tenaga Kerja Pada Proyek Pembangunan Ruang Laboratorium Komputer SDN 7 Lembo Kabupaten Konawe Utara

Sultra Civil Engineering Journal (SCiEJ) · Vol. 7 No. 1 (2026) · pp. 772–779

DOI
10.54297/sciej.v7i1.1491
ISSN
2716-1714
Published
2026-04-30
Publisher
Universitas Sulawesi Tenggara
Language
eng
License
creativecommons.org/licenses/by/4.0

Abstract

The difference between productivity in the field and reference productivity can cause discrepancies between project planning and its implementation. This may result in resource wastage, cost inefficiency, and disruption of the project schedule. Therefore, an in-depth study is needed to determine the actual level of labor productivity occurring in the field. This study was conducted to analyze labor productivity in red brick wall masonry and wall plastering work on the Computer Laboratory Room Construction Project at SDN 7 Lembo. The purpose of this study is to calculate the actual labor productivity value and compare it with the reference productivity based on applicable regulations. Through this research, it is expected to provide an overview of the level of labor efficiency. This research was conducted through direct observation in the field. Observations were carried out on red brick masonry and wall plastering work. The aspects observed included the work volume, number of workers, and the duration of work per day. The results of this study show that the average labor productivity in the field is 5.53 m²/OH for brick masonry work and 22.79 m²/OH for plastering work. The standard labor productivity value according to the reference (Permen PUPR 2025) for brick masonry work is 4.76 m²/OH, and for wall plastering work it is also 4.76 m²/OH. The comparison of productivity values is 1.16 m²/OH for brick masonry work and 4.78 m²/OH for plastering work. Based on these results, the field productivity is higher than the productivity according to the reference standard.

Collaboration network of the authors

40 authors · 121 co-authorship links · 4 across different organisations · showing the 40 most connected

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Sulawesi Tenggara
  • Institut Agama Islam Negeri Kendari
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Irwan LakawaUniversitas Sulawesi Tenggara27
Andi MakkawaruUniversitas Sulawesi Tenggara9
Catrin SudardjatUniversitas Sulawesi Tenggara8
Hujiyanto HujiyantoUniversitas Sulawesi Tenggara8
Hado HadoUniversitas Sulawesi Tenggara5
Hakiman HakimanUniversitas Sulawesi Tenggara5
Sitti HawaUniversitas Sulawesi Tenggara4
Sunaryo SunaryoUniversitas Sulawesi Tenggara3
Andi Makkawaru Isazarny JassinUniversitas Sulawesi Tenggara3
Muhammad MuhsarUniversitas Sulawesi Tenggara3
Lisman LismanUniversitas Sulawesi Tenggara3
Haryono HaryonoUniversitas Sulawesi Tenggara2
La Ode Musa RachmatUniversitas Sulawesi Tenggara2
Fikri Aris MunandarUniversitas Sulawesi Tenggara2
La Ode Abdul MananUniversitas Sulawesi Tenggara2
Erni DanggiUniversitas Sulawesi Tenggara2
Haryono HaryonoUniversitas Sulawesi Tenggara2
Komang Agus SaputraUniversitas Sulawesi Tenggara2
Andi Kukuh SetiawanUniversitas Sulawesi Tenggara2
Andi Makkawaru Isazarni JassinAffiliation unknown2
Syamsuddin SyamsuddinUniversitas Sulawesi Tenggara2
Syamsuddin SyamsuddinInstitut Agama Islam Negeri Kendari2
La Ode BariunUniversitas Sulawesi Tenggara1
Humairah MuljabarUniversitas Sulawesi Tenggara1
La Ode Muhammad Isman Hardiansyah BariunAffiliation unknown1
Joko Tri BrataUniversitas Sulawesi Tenggara1
Arsalim ArsalimUniversitas Sulawesi Tenggara1
Aswad AswadUniversitas Sulawesi Tenggara1
Syamsuddin SyamsuddinUniversitas Sulawesi Tenggara1
Hajar HajarUniversitas Sulawesi Tenggara1
Farra SasmitaUniversitas Sulawesi Tenggara1
Erni DanggiUniversitas Sulawesi Tenggara1
Eko Efendi JuantoroUniversitas Sulawesi Tenggara1
La Ode Muhamad MagribiUniversitas Sulawesi Tenggara1
Ramadhan Hidayat PutraUniversitas Sulawesi Tenggara1
Amad Syarif SyukriAffiliation unknown1
Catrin SudarjatUniversitas Sulawesi Tenggara1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://jurnal-unsultra.ac.id/index.php/scej/oai, first harvested 30 Okt 2026, last seen 30 Okt 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Analisis Produktivitas Tenaga Kerja Pada Proyek Pembangunan Ruang Laboratorium Komputer SDN 7 Lembo Kabupaten Konawe Utara</dc:title>
	<dc:creator>Sufrianto, Sufrianto</dc:creator>
	<dc:creator>Ilham, Vickky Anggara</dc:creator>
	<dc:creator>Mini, Wa Ode</dc:creator>
	<dc:description xml:lang="en-US">The difference between productivity in the field and reference productivity can cause discrepancies between project planning and its implementation. This may result in resource wastage, cost inefficiency, and disruption of the project schedule. Therefore, an in-depth study is needed to determine the actual level of labor productivity occurring in the field. This study was conducted to analyze labor productivity in red brick wall masonry and wall plastering work on the Computer Laboratory Room Construction Project at SDN 7 Lembo. The purpose of this study is to calculate the actual labor productivity value and compare it with the reference productivity based on applicable regulations. Through this research, it is expected to provide an overview of the level of labor efficiency. This research was conducted through direct observation in the field. Observations were carried out on red brick masonry and wall plastering work. The aspects observed included the work volume, number of workers, and the duration of work per day. The results of this study show that the average labor productivity in the field is 5.53 m²/OH for brick masonry work and 22.79 m²/OH for plastering work. The standard labor productivity value according to the reference (Permen PUPR 2025) for brick masonry work is 4.76 m²/OH, and for wall plastering work it is also 4.76 m²/OH. The comparison of productivity values is 1.16 m²/OH for brick masonry work and 4.78 m²/OH for plastering work. Based on these results, the field productivity is higher than the productivity according to the reference standard.</dc:description>
	<dc:publisher xml:lang="en-US">Universitas Sulawesi Tenggara</dc:publisher>
	<dc:date>2026-04-30</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://jurnal-unsultra.ac.id/index.php/scej/article/view/1491</dc:identifier>
	<dc:identifier>10.54297/sciej.v7i1.1491</dc:identifier>
	<dc:source xml:lang="en-US">Sultra Civil Engineering Journal (SCiEJ); Vol 7 No 1 (2026): Sultra Civil Engineering Journal (SCiEJ); 772-779</dc:source>
	<dc:source>2716-1714</dc:source>
	<dc:source>10.54297/sciej.v7i1</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://jurnal-unsultra.ac.id/index.php/scej/article/view/1491/1016</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2026 Sufrianto Sufrianto, Vickky Anggara Ilham, Wa Ode Mini</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>