Act Number 21of 2014 on Geothermal Energy is considered a solution to the slow development of geothermal energy utilization for power plants by opening the way for exploitation in conservation forest areas. However, in practice, such exploitation is still constrained because it often clashes with the conservation interest. This study aims to review: (1) the role of Act No. 21/2014 as a legal justification to conduct geothermal power plant exploitation in Gunung Kembar and Gunung Waihlup within the core zone of Gunung Leuser National Park (GLNP), and (2) the potential impact of such exploitation on the international recognition of Tropical Rainforest Heritage of Sumatra (TRHS) as a world heritage. This research is normative legal research, using secondary data consisting of primary and secondary legal materials, and employs a qualitative method to analyze the data. The results showed that Act Number 21 of 2014 could not justify geothermal exploitation activity within the core zone of GLNP. The study also concluded that the geothermal power plant activity is projected to have the potential to compromise TRHS recognition as a world heritage site.

Kata kunci

Jaringan kolaborasi para penulis

10 penulis · 22 tautan kepenulisan bersama · 3 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Universitas Gadjah Mada
  • Sebelas Maret University
  • Muhammadiyah University of Surakarta
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Vivin PurnamawatiUniversitas Gadjah Mada10
Diah Apriani Atika SariSebelas Maret University3
Harry PurwantoUniversitas Gadjah Mada3
I Made Andi ArsanaUniversitas Gadjah Mada3
Nadia Nuraini IsfarinMuhammadiyah University of Surakarta1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://jurnal.uns.ac.id/yustisia/oai, pertama di-harvest 10 Nov 2026, terakhir terlihat 16 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Geothermal Exploitation in a World Heritage Site: a Case Study of Gunung Leuser National Park</dc:title>
	<dc:creator>Triatmodjo, Marsudi</dc:creator>
	<dc:creator>Merdekawati, Agustina</dc:creator>
	<dc:creator>Nurvianto, Sandy</dc:creator>
	<dc:creator>Hasibuan, Irkham Afnan Trisandi</dc:creator>
	<dc:creator>Agung, I Gusti Putu</dc:creator>
	<dc:subject xml:lang="en-US">geothermal power plant; Gunung Leuser National Park; tropical rainforest heritage of Sumatra</dc:subject>
	<dc:description xml:lang="en-US">Act Number 21of 2014 on Geothermal Energy is considered a solution to the slow development of geothermal energy utilization for power plants by opening the way for exploitation in conservation forest areas. However, in practice, such exploitation is still constrained because it often clashes with the conservation interest. This study aims to review: (1) the role of Act No. 21/2014 as a legal justification to conduct geothermal power plant exploitation in Gunung Kembar and Gunung Waihlup within the core zone of Gunung Leuser National Park (GLNP), and (2) the potential impact of such exploitation on the international recognition of Tropical Rainforest Heritage of Sumatra (TRHS) as a world heritage. This research is normative legal research, using secondary data consisting of primary and secondary legal materials, and employs a qualitative method to analyze the data. The results showed that Act Number 21 of 2014 could not justify geothermal exploitation activity within the core zone of GLNP. The study also concluded that the geothermal power plant activity is projected to have the potential to compromise TRHS recognition as a world heritage site.</dc:description>
	<dc:publisher xml:lang="en-US">Faculty of Law, Universitas Sebelas Maret</dc:publisher>
	<dc:contributor xml:lang="en-US"></dc:contributor>
	<dc:date>2021-04-08</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US"></dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://jurnal.uns.ac.id/yustisia/article/view/47797</dc:identifier>
	<dc:identifier>10.20961/yustisia.v10i1.47797</dc:identifier>
	<dc:source xml:lang="en-US">Yustisia; Vol 10, No 1: April 2021; 94-110</dc:source>
	<dc:source>2549-0907</dc:source>
	<dc:source>0852-0941</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://jurnal.uns.ac.id/yustisia/article/view/47797/31044</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2021 Agustina Merdekawati</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>