PELAKSANAAN PERJANJIAN PEMBORONGAN PEMBANGUNAN TALUD PENGAMAN PANTAI (Suatu Studi di Kabupaten Kolaka)

Sultra Law Review · Vol. ume No. mor (2025) · pp. 1671–1686

ISSN
2685-208X
Published
2025-04-16
Publisher
Fakultas Hukum Universitas Sulawesi Tenggara
Language
eng

Abstract

This study aims to determine and understand whether the implementation of the coastal protection embankment construction contract agreement has been in accordance with the agreed agreement, To determine and understand how the efforts made by the parties with the delay in completing the work. The study was conducted at PT. Mega Senindo and the PU Office of Kolaka Regency and the study used a normative legal approach because this study aims to study and analyze the legal relationship between the government and PT. Mega Sesindo. with primary and secondary data then analyzed qualitatively and then described the problems in this study so that conclusions and solutions to the problems can be obtained. Based on the results of the study that 1. The implementation of the coastal protection embankment construction contract agreement between the Kolaka Regency Government and PT. Mega Senindo has been carried out in accordance with Presidential Decree number 80 of 2003 concerning Guidelines for the procurement of government goods and services, where PT. Mega Senindo as the executor of the embankment construction work, based on the results of an open auction conducted by the Kolaka Regency Government. All matters relating to the implementation of the coastal protection embankment work have been stated in the agreement letter between PT. Mega Senindo with the Kolaka Regency Government, but in the agreement PT. Mega Senindo is in a weak and unbalanced position with the government. 2. efforts to resolve the delay in the implementation of this work unilaterally and do not refer to the existing contract because the termination is more based on a circular issued regarding the expiration of the budget year so that the provisions in the contract regarding the extension of the implementation period are not taken, and the decision tends to be forced. The government imposes sanctions on the second party as a blacklisted company so that PT. Mega Senindo cannot participate in the auction in the following year's APBN/APBD as a result of the delay in completing the construction of the coastal protection embankment. The decision of the Kolaka Regency government stating that PT. Mega Senindo has defaulted due to the delay in the handover of the work cannot be justified, considering that the material requirements and formal requirements regarding the state of default have also not been met.

Collaboration network of the authors

34 authors · 81 co-authorship links · 2 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Sulawesi Tenggara
  • Indonesia University of Education
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Djohar ArifinUniversitas Sulawesi Tenggara6
Suriani Bt ToloUniversitas Sulawesi Tenggara4
Rifkah Anniza RahmanUniversitas Sulawesi Tenggara2
Alimuddin AlimuddinUniversitas Sulawesi Tenggara2
Alimuddin AlimuddinAffiliation unknown2
La Ode MuhramUniversitas Sulawesi Tenggara2
Ayu Lestari DewiUniversitas Sulawesi Tenggara1
Harmoko HamzahUniversitas Sulawesi Tenggara1
La Ode BariunUniversitas Sulawesi Tenggara1
Muh. Endang SaAffiliation unknown1
Irpan IrpanUniversitas Sulawesi Tenggara1
H.M. Abidin RamliUniversitas Sulawesi Tenggara1
Megit MegitUniversitas Sulawesi Tenggara1
Muh. Safri S.Universitas Sulawesi Tenggara1
Feri LimbongUniversitas Sulawesi Tenggara1
Djohar Abidin ArifinUniversitas Sulawesi Tenggara1
Irma Sukmawati SanggoUniversitas Sulawesi Tenggara1
Syamsiah SyamsiahUniversitas Sulawesi Tenggara1
Sri MuliyaniUniversitas Sulawesi Tenggara1
Sri MulyaniIndonesia University of Education1
Herianto HeriantoUniversitas Sulawesi Tenggara1
Muh. Nur Jaya BUniversitas Sulawesi Tenggara1
M. Rico Aswal Lumo ArdiansyahUniversitas Sulawesi Tenggara1
Yulfin YulfinUniversitas Sulawesi Tenggara1
Muh. FitriadiUniversitas Sulawesi Tenggara1
Fabrizio Belantarawan PutraUniversitas Sulawesi Tenggara1
Joko Tri BrataUniversitas Sulawesi Tenggara1
Wa Ode Intan KurniawatiUniversitas Sulawesi Tenggara1
Niken Yulian YusufUniversitas Sulawesi Tenggara1
Hijriani HijrianiUniversitas Sulawesi Tenggara1
La Ode Muhammad IsmanAffiliation unknown1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://jurnal-unsultra.ac.id/index.php/sulrev/oai, first harvested 30 Okt 2026, last seen 30 Okt 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">PELAKSANAAN PERJANJIAN PEMBORONGAN PEMBANGUNAN TALUD PENGAMAN PANTAI (Suatu Studi di Kabupaten Kolaka)</dc:title>
	<dc:creator>Suharto, Suharto</dc:creator>
	<dc:creator>Khayati, Sri</dc:creator>
	<dc:creator>Hariru, La Ode</dc:creator>
	<dc:description xml:lang="en-US">This study aims to determine and understand whether the implementation of the coastal protection embankment construction contract agreement has been in accordance with the agreed agreement, To determine and understand how the efforts made by the parties with the delay in completing the work. The study was conducted at PT. Mega Senindo and the PU Office of Kolaka Regency and the study used a normative legal approach because this study aims to study and analyze the legal relationship between the government and PT. Mega Sesindo. with primary and secondary data then analyzed qualitatively and then described the problems in this study so that conclusions and solutions to the problems can be obtained. Based on the results of the study that 1. The implementation of the coastal protection embankment construction contract agreement between the Kolaka Regency Government and PT. Mega Senindo has been carried out in accordance with Presidential Decree number 80 of 2003 concerning Guidelines for the procurement of government goods and services, where PT. Mega Senindo as the executor of the embankment construction work, based on the results of an open auction conducted by the Kolaka Regency Government. All matters relating to the implementation of the coastal protection embankment work have been stated in the agreement letter between PT. Mega Senindo with the Kolaka Regency Government, but in the agreement PT. Mega Senindo is in a weak and unbalanced position with the government. 2. efforts to resolve the delay in the implementation of this work unilaterally and do not refer to the existing contract because the termination is more based on a circular issued regarding the expiration of the budget year so that the provisions in the contract regarding the extension of the implementation period are not taken, and the decision tends to be forced. The government imposes sanctions on the second party as a blacklisted company so that PT. Mega Senindo cannot participate in the auction in the following year's APBN/APBD as a result of the delay in completing the construction of the coastal protection embankment. The decision of the Kolaka Regency government stating that PT. Mega Senindo has defaulted due to the delay in the handover of the work cannot be justified, considering that the material requirements and formal requirements regarding the state of default have also not been met.</dc:description>
	<dc:publisher xml:lang="en-US">Fakultas Hukum Universitas Sulawesi Tenggara</dc:publisher>
	<dc:date>2025-04-16</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://jurnal-unsultra.ac.id/index.php/sulrev/article/view/964</dc:identifier>
	<dc:source xml:lang="en-US">Sultra Law Review; Volume 03 Nomor 02, Oktober 2021; 1671 - 1686</dc:source>
	<dc:source>2685-208X</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://jurnal-unsultra.ac.id/index.php/sulrev/article/view/964/624</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2021 Sultra Law Review</dc:rights>
</oai_dc:dc>