Melola Discovery

← Melola Discovery

Jurnal SINTA 1

“Scrumbear” framework for solving traditional scrum model problems

Bulletin of Electrical Engineering and Informatics · Vol. 10 No. 1 (2021) · hlm. 319–326

DOI
10.11591/eei.v10i1.2487
ISSN
2089-3191, 2302-9285
Terbit
2021-02-01
Penerbit
Institute of Advanced Engineering and Science (IAES)
Bahasa
en

Abstrak

Software engineering is a discipline that is little understood by people. It defines how software is developed and maintained to meet the clients’ requirements. Software engineers follow certain systems and standards in their work to meet the clients’ desires. It is on this background that engineers follow specific models in coming up with the final product. One of the models highly used is scrum, which is one of the agile methodologies. However, despite being highly used, it has inherent flaws that need to be corrected. Those flaws are product owner continues changing; do not accept changes in working scrum, sprint’s release time limitation, finally wasting team time within each sprint. This paper presents a new framework, which is an updated version of the current Scrum, to overcome the scum models mentioned issues. In this study, a new framework is presented in a way that is understandable and needed by software developer’s team upon the collected qualitative and quantitative data. The implementation was by making some changes to the current scrum model leading to the “Scrumbear”, certain flaws can be corrected. One of the presented changes involve adding the control master rule to ensure controlling the requirements changing.

Kata kunci

Jaringan kolaborasi para penulis

7 penulis · 10 tautan kepenulisan bersama · 2 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Prince Sultan University
  • Tun Hussein Onn University of Malaysia
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Nora Khaled Al GhanmiPrince Sultan University1
Nurul Husna Mohd JamailTun Hussein Onn University of Malaysia1
Abdul Halim A. G.Tun Hussein Onn University of Malaysia1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OpenAlex API (jurnal SINTA, ADR 0048) https://openalex.org/S2765016208, pertama di-harvest 22 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title xml:lang="en">“Scrumbear” framework for solving traditional scrum model problems</dc:title><dc:creator>Leanah Alsaber</dc:creator><dc:creator>Ebtesam Al Elsheikh</dc:creator><dc:creator>Sarah Aljumah</dc:creator><dc:creator>Nor Shahida Mohd Jamail</dc:creator><dc:subject>Scrum</dc:subject><dc:subject>agile software development</dc:subject><dc:subject>acceptance of change</dc:subject><dc:description xml:lang="en">Software engineering is a discipline that is little understood by people. It defines how software is developed and maintained to meet the clients’ requirements. Software engineers follow certain systems and standards in their work to meet the clients’ desires. It is on this background that engineers follow specific models in coming up with the final product. One of the models highly used is scrum, which is one of the agile methodologies. However, despite being highly used, it has inherent flaws that need to be corrected. Those flaws are product owner continues changing; do not accept changes in working scrum, sprint’s release time limitation, finally wasting team time within each sprint. This paper presents a new framework, which is an updated version of the current Scrum, to overcome the scum models mentioned issues. In this study, a new framework is presented in a way that is understandable and needed by software developer’s team upon the collected qualitative and quantitative data. The implementation was by making some changes to the current scrum model leading to the “Scrumbear”, certain flaws can be corrected. One of the presented changes involve adding the control master rule to ensure controlling the requirements changing.</dc:description><dc:publisher>Institute of Advanced Engineering and Science (IAES)</dc:publisher><dc:date>2021-02-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/eei.v10i1.2487</dc:identifier><dc:identifier>10.11591/eei.v10i1.2487</dc:identifier><dc:source>Bulletin of Electrical Engineering and Informatics; Vol 10 No 1 (2021); 319-326</dc:source><dc:source>2089-3191</dc:source><dc:source>2302-9285</dc:source><dc:language>en</dc:language><dc:relation>https://beei.org/index.php/EEI/article/download/2487/1756</dc:relation></oai_dc:dc>