Comparison of different methods to face the huge increase in future load in power distribution network

Bulletin of Electrical Engineering and Informatics · Vol. 11 No. 5 (2022) · hlm. 2450–2459

DOI
10.11591/eei.v11i5.4092
ISSN
2089-3191, 2302-9285
Terbit
2022-10-01
Penerbit
Institute of Advanced Engineering and Science (IAES)
Bahasa
en
Lisensi
creativecommons.org/licenses/by-sa/4.0/

Abstrak

The main challenge of present distribution networks is the huge increase in demand for electricity especially in city center where the demand is increasing vertically for the same geographical area. This work presents the analyses of 5-Mail distribution network in Basra City/Iraq with conventional system 33/11/0.416 kV, at future load by estimating the increase in load 10 years later. The network is analyzed in terms of voltage drop, power losses, and the feeder loading. To improve the network the 33/11/0.416 kV system is re-analyzed at the expected future load using the optimal reconfiguration of the network or adding capacitor placement to reduce losses and voltage drop. The results of these methods are compared with the results of the network re-analyzed using the proposed 33/0.416 kV system at future load. The results show that the proposed method of upgrading the voltage level of distribution network is the best solution. The GIS software is used to locate the distribution transformers and lying of the underground cables. CYME software is used to simulate the electric distribution system and conduct the load flow and other analyses.The GIS software is used to locate the distribution transformers and lying of the underground cables. CYME software is used to simulate the electric distribution system and conduct the load flow and other analyses.

Kata kunci

Jaringan kolaborasi para penulis

2 penulis · 1 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • University of Basrah
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OpenAlex API (jurnal SINTA, ADR 0048) https://openalex.org/S2765016208, pertama di-harvest 22 Nov 2026, terakhir terlihat 22 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title xml:lang="en">Comparison of different methods to face the huge increase in future load in power distribution network</dc:title><dc:creator>Salam B Abood</dc:creator><dc:creator>Thamir Abdul-Wahhab</dc:creator><dc:subject>power distribution networks</dc:subject><dc:subject>load forecasting</dc:subject><dc:subject>voltage drop</dc:subject><dc:subject>power losses</dc:subject><dc:subject>network reconfiguration</dc:subject><dc:subject>capacitor placement</dc:subject><dc:description xml:lang="en">The main challenge of present distribution networks is the huge increase in demand for electricity especially in city center where the demand is increasing vertically for the same geographical area. This work presents the analyses of 5-Mail distribution network in Basra City/Iraq with conventional system 33/11/0.416 kV, at future load by estimating the increase in load 10 years later. The network is analyzed in terms of voltage drop, power losses, and the feeder loading. To improve the network the 33/11/0.416 kV system is re-analyzed at the expected future load using the optimal reconfiguration of the network or adding capacitor placement to reduce losses and voltage drop. The results of these methods are compared with the results of the network re-analyzed using the proposed 33/0.416 kV system at future load. The results show that the proposed method of upgrading the voltage level of distribution network is the best solution. The GIS software is used to locate the distribution transformers and lying of the underground cables. CYME software is used to simulate the electric distribution system and conduct the load flow and other analyses.The GIS software is used to locate the distribution transformers and lying of the underground cables. CYME software is used to simulate the electric distribution system and conduct the load flow and other analyses.</dc:description><dc:publisher>Institute of Advanced Engineering and Science (IAES)</dc:publisher><dc:date>2022-10-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/eei.v11i5.4092</dc:identifier><dc:identifier>10.11591/eei.v11i5.4092</dc:identifier><dc:source>Bulletin of Electrical Engineering and Informatics; Vol 11 No 5 (2022); 2450-2459</dc:source><dc:source>2089-3191</dc:source><dc:source>2302-9285</dc:source><dc:language>en</dc:language><dc:relation>https://beei.org/index.php/EEI/article/download/4092/2887</dc:relation><dc:rights>https://creativecommons.org/licenses/by-sa/4.0/</dc:rights></oai_dc:dc>