Backpropagation neural network based adaptive load scheduling method in an isolated power system

Bulletin of Electrical Engineering and Informatics · Vol. 12 No. 5 (2023) · hlm. 3000–3007

DOI
10.11591/eei.v12i5.4511
ISSN
2089-3191, 2302-9285
Terbit
2023-06-19
Penerbit
Institute of Advanced Engineering and Science (IAES)
Bahasa
en
Lisensi
creativecommons.org/licenses/by-sa/4.0/

Abstrak

This work introduces an efficient load scheduling method for handling the day-to-day power supply needs. At peak load times, due to its instabilitythe power generation system fails and as a measure, the load shedding process is followed. The presented method overcomes this problem by scheduling the load based on necessity. For this load scheduling is handled with an artificial neural network (ANN). For the training purpose the backpropagation (BP) algorithm is used. The whole load essential is the input of the neural network (NN). The power generation of all resources and power losses at the instant of transmission is the NN output. The optimum scheduling of different power sources is important when considering all the available sources. Load scheduling shares the feasibility of entire load and losses. It is well-known as optimal scheduling if the constraints such as availability of power, load requirement, cost and power losses are considered. Training the system using a large number of parameters would be a difficult task. So, finest number of communally independent inputs is selected. The presented method aims to lower the power generation expenditure and formulate the power available on demand without alteration. The network is designed using MATLAB.

Kata kunci

Jaringan kolaborasi para penulis

4 penulis · 4 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Mahatma Gandhi University
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
S. KrishnakumarMahatma Gandhi University1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OpenAlex API (jurnal SINTA, ADR 0048) https://openalex.org/S2765016208, pertama di-harvest 19 Nov 2026, terakhir terlihat 19 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title xml:lang="en">Backpropagation neural network based adaptive load scheduling method in an isolated power system</dc:title><dc:creator>Vijo M. Joy</dc:creator><dc:creator>Joseph John</dc:creator><dc:creator>Sukumarapillai Krishnakumar</dc:creator><dc:subject>load scheduling</dc:subject><dc:subject>isolated power systems</dc:subject><dc:subject>BP neural network</dc:subject><dc:subject>load shedding</dc:subject><dc:subject>generation scheduling</dc:subject><dc:subject>power transmission losses</dc:subject><dc:subject>generation cost minimization</dc:subject><dc:subject>peak load</dc:subject><dc:description xml:lang="en">This work introduces an efficient load scheduling method for handling the day-to-day power supply needs. At peak load times, due to its instabilitythe power generation system fails and as a measure, the load shedding process is followed. The presented method overcomes this problem by scheduling the load based on necessity. For this load scheduling is handled with an artificial neural network (ANN). For the training purpose the backpropagation (BP) algorithm is used. The whole load essential is the input of the neural network (NN). The power generation of all resources and power losses at the instant of transmission is the NN output. The optimum scheduling of different power sources is important when considering all the available sources. Load scheduling shares the feasibility of entire load and losses. It is well-known as optimal scheduling if the constraints such as availability of power, load requirement, cost and power losses are considered. Training the system using a large number of parameters would be a difficult task. So, finest number of communally independent inputs is selected. The presented method aims to lower the power generation expenditure and formulate the power available on demand without alteration. The network is designed using MATLAB.</dc:description><dc:publisher>Institute of Advanced Engineering and Science (IAES)</dc:publisher><dc:date>2023-06-19</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/eei.v12i5.4511</dc:identifier><dc:identifier>10.11591/eei.v12i5.4511</dc:identifier><dc:source>Bulletin of Electrical Engineering and Informatics; Vol 12 No 5 (2023); 3000-3007</dc:source><dc:source>2089-3191</dc:source><dc:source>2302-9285</dc:source><dc:language>en</dc:language><dc:relation>https://beei.org/index.php/EEI/article/download/4511/3412</dc:relation><dc:rights>https://creativecommons.org/licenses/by-sa/4.0/</dc:rights></oai_dc:dc>