Delayed arrival at busy stations results in cascading effects. Late arrivals mean that an incoming rake would not be available for reuse and the subsequent departure would be affected. The research investigates this issue for New Delhi's train station (NDLS), India's busiest rail terminus and a case study based on 58,698 train movements throughout 2023. It reveals that, as 79% of arriving express trains reached NDLS with delays (mean 53 minutes), these delays significantly transferred to departing trains (r=0.491). Of 6.86 million available buffer minutes, only 13% was actually utilized, rest were "frozen" by an inflexible static assignment method. This research formulates the rolling stock assignment problem as a constrained bipartite matching problem and develops a hybrid assignment algorithm (HAA) that integrates a cost matrix based optimization with auction-based assignment and a dynamic re-assignment process. HAA provides 98.9%, 99.9%, and 88.6% delay absorption capacities for three different levels of traffic congestion while reducing originating train delay by up to 39.8 percentage points compared to the present system. Thoughtful assignments not more capacity are the key to improving punctuality in a heavily utilized rail.
3 penulis ·
3 tautan kepenulisan bersama
· 2 lintas organisasi
Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.
Manav Rachna International Institute of Research and Studies
Galgotias University
Organisasi berbeda
Organisasi sama
Afiliasi tidak diketahui
Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulis
Organisasi
Artikel bersama
Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.