Melola Discovery

← Melola Discovery

Jurnal SINTA 3

ANALYSIS OF SMK3 IMPLEMENTATION LEVEL AND ACCIDENT RISK IN THE ADMINISTRATION OFFICE BUILDING DEVELOPMENT PROJECT AT GUSTI NGURAH RAI AIRPORT BALI

Logic: Jurnal Rancang Bangun dan Teknologi · Vol. 22 No. 2 (2022) · hlm. 159–165

DOI
10.31940/logic.v22i2.167-173
ISSN
2580-5649, 1412-114X
Terbit
2022-07-30
Penerbit
Unit Publikasi Ilmiah, P3M, Politeknik Negeri Bali
Bahasa
eng

Abstrak

Every construction project, whether high-tech or simple, certainly has risks in its implementation process, therefore it is necessary to establish an Occupational Safety and Health Management System to minimize Occupational Safety and Health (K3) risks, but there are still many construction companies that are lacking in identifying K3 risks. and implementing an Occupational Health and Safety Management System (SMK3) in the process of implementing a construction project. The purpose of this study was to determine the level of OSH risk based on work items, as well as to measure the level of implementation of SMK3 in a construction project. In this research, the object of the case study is the construction project of the Administration Office Building at I Gusti Ngurah Rai Airport, Bali, during the lower structure work. After carrying out risk identification, 35 risk questions and 5 jobs are obtained, namely Borepile, Pilecap, Pendestal Column, Sloff, Roof Frame, then the results of the identification are processed and the risk level is obtained from the implementation of the Administration Office Building Construction Project at I Gusti Ngurah Rai Airport, Bali. Enter the Medium Category with a risk value of 8.69, while for the implementation of the Occupational Safety and Health Management System (SMK) the Administration Office Building Construction Project at I Gusti Ngurah Rai Airport, Bali is included in the good category with a total application value of 83%. Hopefully this research can become a reference in identifying K3 risks and a reference in implementing the Occupational Health and Safety Management System (SMK).

Kata kunci

Jaringan kolaborasi para penulis

35 penulis · 91 tautan kepenulisan bersama · 9 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Politeknik Negeri Bali
  • University of National Education
  • Universitas Triatma Mulya
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
I Nyoman SutarnaPoliteknik Negeri Bali5
I Ketut SutapaPoliteknik Negeri Bali4
I Made SudiarsaPoliteknik Negeri Bali4
I Gede Fery Surya TapaUniversity of National Education3
I Nyoman Indra KumaraUniversity of National Education3
I Made BudiadiAfiliasi tidak diketahui3
Ida Bagus WirahajiPoliteknik Negeri Bali2
I Made Anom SantianaPoliteknik Negeri Bali2
I Gede Sastra WibawaPoliteknik Negeri Bali2
I Made TapayasaPoliteknik Negeri Bali2
I Wayan SuasiraPoliteknik Negeri Bali2
I Wayan Darya SupartaPoliteknik Negeri Bali2
I Nyoman RamiaPoliteknik Negeri Bali2
Denin Lintang TuhujatiPoliteknik Negeri Bali2
I Komang SudiartaPoliteknik Negeri Bali2
. SudirmanAfiliasi tidak diketahui1
Made Ery ArsanaPoliteknik Negeri Bali1
I Wayan Adi SubagiaPoliteknik Negeri Bali1
I Dewa Gede Agus Tri PutraPoliteknik Negeri Bali1
I Wayan SuastawaPoliteknik Negeri Bali1
I Made AryanaAfiliasi tidak diketahui1
I Nyoman SuardikaPoliteknik Negeri Bali1
Kadek Adi SuryawanPoliteknik Negeri Bali1
I Made Suardana KaderPoliteknik Negeri Bali1
I Ketut SuhermanPoliteknik Negeri Bali1
I Gusti Ngurah ArdanaPoliteknik Negeri Bali1
Made SudiarsaPoliteknik Negeri Bali1
I Ketut SutapaUniversitas Triatma Mulya1
Decky Cipta IndrashwaraUniversity of National Education1
I Wayan Darta SupartaPoliteknik Negeri Bali1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://ojs2.pnb.ac.id/index.php/LOGIC/oai, pertama di-harvest 19 Nov 2026, terakhir terlihat 19 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">ANALYSIS OF SMK3 IMPLEMENTATION LEVEL AND ACCIDENT RISK IN THE ADMINISTRATION OFFICE BUILDING DEVELOPMENT PROJECT AT GUSTI NGURAH RAI AIRPORT BALI</dc:title>
	<dc:creator>I Ketut Sutapa</dc:creator>
	<dc:creator>I Nyoman Ardika</dc:creator>
	<dc:creator>I Nyoman Sutapa</dc:creator>
	<dc:creator>I Nengah Darma Susila</dc:creator>
	<dc:creator>I Putu Agus Krisnadinata</dc:creator>
	<dc:subject xml:lang="en-US">risk level</dc:subject>
	<dc:subject xml:lang="en-US">implementation of SMK3</dc:subject>
	<dc:description xml:lang="en-US">Every construction project, whether high-tech or simple, certainly has risks in its implementation process, therefore it is necessary to establish an Occupational Safety and Health Management System to minimize Occupational Safety and Health (K3) risks, but there are still many construction companies that are lacking in identifying K3 risks. and implementing an Occupational Health and Safety Management System (SMK3) in the process of implementing a construction project. The purpose of this study was to determine the level of OSH risk based on work items, as well as to measure the level of implementation of SMK3 in a construction project. In this research, the object of the case study is the construction project of the Administration Office Building at I Gusti Ngurah Rai Airport, Bali, during the lower structure work. After carrying out risk identification, 35 risk questions and 5 jobs are obtained, namely Borepile, Pilecap, Pendestal Column, Sloff, Roof Frame, then the results of the identification are processed and the risk level is obtained from the implementation of the Administration Office Building Construction Project at I Gusti Ngurah Rai Airport, Bali. Enter the Medium Category with a risk value of 8.69, while for the implementation of the Occupational Safety and Health Management System (SMK) the Administration Office Building Construction Project at I Gusti Ngurah Rai Airport, Bali is included in the good category with a total application value of 83%. Hopefully this research can become a reference in identifying K3 risks and a reference in implementing the Occupational Health and Safety Management System (SMK).</dc:description>
	<dc:publisher xml:lang="en-US">Unit Publikasi Ilmiah, P3M, Politeknik Negeri Bali</dc:publisher>
	<dc:date>2022-07-30</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs2.pnb.ac.id/index.php/LOGIC/article/view/522</dc:identifier>
	<dc:identifier>10.31940/logic.v22i2.167-173</dc:identifier>
	<dc:source xml:lang="en-US"> Logic : Jurnal Rancang Bangun dan Teknologi; Vol. 22 No. 2 (2022): July; 159-165</dc:source>
	<dc:source>2580-5649</dc:source>
	<dc:source>1412-114X</dc:source>
	<dc:source>10.31940/logic.v22i2</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs2.pnb.ac.id/index.php/LOGIC/article/view/522/327</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2022  Logic : Jurnal Rancang Bangun dan Teknologi</dc:rights>
	<dc:rights xml:lang="en-US">https://scholar.google.co.id/citations?user=smBuD3gAAAAJ&amp;hl=id</dc:rights>
</oai_dc:dc>