Melola Discovery

← Melola Discovery

Jurnal SINTA 3

Analysis of OHS Costs in the Road Construction Project of Singaraja City – Mengwi (Short Cut Bedugul Point 5 - 6)

Logic: Jurnal Rancang Bangun dan Teknologi · Vol. 21 No. 2 (2021) · hlm. 97–100

DOI
10.31940/logic.v21i2.2545
ISSN
2580-5649, 1412-114X
Terbit
2021-07-30
Penerbit
Pusat Penelitian dan Pengabdian kepada Masyarakat (P3M) Politeknik Negeri Bali
Bahasa
eng

Abstrak

Short Cut Bedugul is a short road construction project on the Singaraja-Denpasar route. The short cut development includes the implementation of an occupational health and safety management system (SMK3). The 5-6 point short cut project includes the grade of a large project and places great importance on work safety. Field conditions with high rainfall make the area prone to landslides that can endanger workers, as well as environmental temperatures that reach 20oC which can affect work productivity. The objectives of this study are: To analyze the implementation of occupational safety and health (K3) on the Short Cut project point 5-6 Bedugul. To find out the amount of costs incurred in implementing K3 on the Short Cut point 5-6 Bedugul project. To analyze the percentage of safety and health costs (K3) to the short cut project value point 5-6 Bedugul. The type of research used in this research is descriptive research. and a quantitative descriptive of the construction of the Singaraja City Boundary Road - Mengwi (Short Cut Bedugul point 5–6) the use of K3 such as the use of safety helmets, light vests, masks, gloves, and safety belts is in accordance with the law and is very disciplined and obedient to existing regulations. set. The percentage of K3 costs to the project value refers to the CIRCULAR OF THE MINISTER NO. 66 / SE / M / 2015 Regarding the Cost of Implementing an Occupational Safety and Health Management System (SMK3) Construction in the Public Works Sector is 0.7%.

Jaringan kolaborasi para penulis

24 penulis · 53 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Politeknik Negeri Bali
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
I Nengah Darma SusilaPoliteknik Negeri Bali4
I Made BudiadiAfiliasi tidak diketahui3
I Made SudiarsaPoliteknik Negeri Bali2
Ida Bagus WirahajiPoliteknik Negeri Bali2
I Made Anom SantianaPoliteknik Negeri Bali2
I Gede Sastra WibawaPoliteknik Negeri Bali2
I Made TapayasaPoliteknik Negeri Bali2
I Wayan SuasiraPoliteknik Negeri Bali2
I Nyoman ArdikaPoliteknik Negeri Bali2
I Putu Agus KrisnadinataPoliteknik Negeri Bali2
I Komang SudiartaPoliteknik Negeri Bali2
I Nyoman SutarnaPoliteknik Negeri Bali1
I Nyoman SuardikaPoliteknik Negeri Bali1
Kadek Adi SuryawanPoliteknik Negeri Bali1
I Made Suardana KaderPoliteknik Negeri Bali1
I Ketut Astawa BagiaAfiliasi tidak diketahui1
Made SudiarsaPoliteknik Negeri Bali1
I Ketut Gede I Ketut GedeAfiliasi tidak diketahui1
I Ketut Gede BandesaAfiliasi tidak diketahui1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://ojs.pnb.ac.id/index.php/LOGIC/oai, pertama di-harvest 19 Nov 2026, terakhir terlihat 19 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Analysis of OHS Costs in the Road Construction Project of Singaraja City – Mengwi (Short Cut Bedugul Point 5 - 6)</dc:title>
	<dc:creator>Sutapa, I Ketut</dc:creator>
	<dc:creator>Sutapa, I Nyoman</dc:creator>
	<dc:creator>Suparta, I Wayan Darya</dc:creator>
	<dc:creator>Ramia, I Nyoman</dc:creator>
	<dc:creator>Tuhujati, Denin Lintang</dc:creator>
	<dc:description xml:lang="en-US">Short Cut Bedugul is a short road construction project on the Singaraja-Denpasar route. The short cut development includes the implementation of an occupational health and safety management system (SMK3). The 5-6 point short cut project includes the grade of a large project and places great importance on work safety. Field conditions with high rainfall make the area prone to landslides that can endanger workers, as well as environmental temperatures that reach 20oC which can affect work productivity. The objectives of this study are: To analyze the implementation of occupational safety and health (K3) on the Short Cut project point 5-6 Bedugul. To find out the amount of costs incurred in implementing K3 on the Short Cut point 5-6 Bedugul project. To analyze the percentage of safety and health costs (K3) to the short cut project value point 5-6 Bedugul. The type of research used in this research is descriptive research. and a quantitative descriptive of the construction of the Singaraja City Boundary Road - Mengwi (Short Cut Bedugul point 5–6) the use of K3 such as the use of safety helmets, light vests, masks, gloves, and safety belts is in accordance with the law and is very disciplined and obedient to existing regulations. set. The percentage of K3 costs to the project value refers to the CIRCULAR OF THE MINISTER NO. 66 / SE / M / 2015 Regarding the Cost of Implementing an Occupational Safety and Health Management System (SMK3) Construction in the Public Works Sector is 0.7%.</dc:description>
	<dc:publisher xml:lang="en-US">Pusat Penelitian dan Pengabdian kepada Masyarakat (P3M) Politeknik Negeri Bali</dc:publisher>
	<dc:date>2021-07-30</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs.pnb.ac.id/index.php/LOGIC/article/view/2545</dc:identifier>
	<dc:identifier>10.31940/logic.v21i2.2545</dc:identifier>
	<dc:source xml:lang="en-US">Logic : Jurnal Rancang Bangun dan Teknologi; Vol 21 No 2 (2021): July; 97-100</dc:source>
	<dc:source>2580-5649</dc:source>
	<dc:source>1412-114X</dc:source>
	<dc:source>10.31940/logic.v21i2</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs.pnb.ac.id/index.php/LOGIC/article/view/2545/1822</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2021 Logic : Jurnal Rancang Bangun dan Teknologi</dc:rights>
</oai_dc:dc>