THE COST OBTAINED BY APPLYING PRECEDENCE DIAGRAM METHOD TOWARD THE TIME OPTIMIZATION ON BUILDING DEVELOPMENT PROJECTS

Logic: Jurnal Rancang Bangun dan Teknologi · Vol. 18 No. 2 (2018) · hlm. 64–71

DOI
10.31940/logic.v18i2.973
ISSN
2580-5649, 1412-114X
Terbit
2018-07-30
Penerbit
Pusat Penelitian dan Pengabdian kepada Masyarakat (P3M) Politeknik Negeri Bali
Bahasa
eng

Abstrak

The complexity of the project expands along with the progress of human civilization. The problems that appear will be more numerous and complicated. The role of project management is indispensable in order to address and prevent these problems, so that the cost,the quality and the time agreed upon can be realized. Cost and time relationship is not directly proportional, so it is necessary to determine the optimal time by optimum cost. Optimization is a best effort undertaken by planning various alternative methods of implementation, in order to obtain optimal timing of projects with optimum cost. Planning and scheduling are the backbone of the entire project, which is based on clear objectives. Microsoft Project as one of the scheduling software based on Precedence Diagram Method (PDM) provides many advantages, one of which scheduling can be done more quickly and thoroughly.In this research, it is created six alternative models as follows: In the first alternative,it is acquired the project period of 256 days, at a cost of Rp2,190,234,913.43; In the second alternative, the was obtained the project period of 150 days, with a cost of Rp1,903,674,873.6; In the third alternative, it was obtained the project period of 102 days, at a cost of Rp1,873,215,897.61; In the alternative IV, it was obtained the project period of 99 days, at a cost of Rp1,895,159,526.12; In the alternative V, the project period was 96 days, at a cost of Rp2,019,623,191.13; In alternate VI, the project period was 89 days at a cost of Rp2,090,543,033.77. From the above calculation, then the result is interpolated in order to obtain the optimum time for the development project. The optimum time obtained is 120 calendar days, at a cost of Rp. 1,884,638,013.61.

Jaringan kolaborasi para penulis

22 penulis · 48 tautan kepenulisan bersama · 3 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Politeknik Negeri Bali
  • The University of Queensland
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
I Made TapayasaPoliteknik Negeri Bali6
I Ketut SutapaPoliteknik Negeri Bali6
I Gede Made KarmaPoliteknik Negeri Bali5
I Ketut DarmaPoliteknik Negeri Bali3
I Ketut DarmaPoliteknik Negeri Bali2
I Wayan WiragaAfiliasi tidak diketahui2
I G A G Surya NegaraAfiliasi tidak diketahui2
I Wayan SuastawaPoliteknik Negeri Bali1
I Wayan AryaAfiliasi tidak diketahui1
M YusufPoliteknik Negeri Bali1
I Made Anom SantianaAfiliasi tidak diketahui1
I Putu Rian Surya WigunaAfiliasi tidak diketahui1
Made SudiarsaPoliteknik Negeri Bali1
I Wayan SuasiraAfiliasi tidak diketahui1
Anom SantianaAfiliasi tidak diketahui1
Sastra WibawaAfiliasi tidak diketahui1
Ni Wayan SadiyaniPoliteknik Negeri Bali1
E IreneThe University of Queensland1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://ojs.pnb.ac.id/index.php/LOGIC/oai, pertama di-harvest 19 Nov 2026, terakhir terlihat 19 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">THE COST OBTAINED BY APPLYING PRECEDENCE DIAGRAM METHOD TOWARD THE TIME OPTIMIZATION ON BUILDING  DEVELOPMENT PROJECTS</dc:title>
	<dc:creator>Tapa Yasa, I Made</dc:creator>
	<dc:creator>Santiana, I Made Anom</dc:creator>
	<dc:creator>Wibawa, I Gede Sastra</dc:creator>
	<dc:creator>Suasira, I Wayan</dc:creator>
	<dc:description xml:lang="en-US">The complexity of the project expands along with the progress of human civilization. The problems that appear will be more numerous and complicated. The role of project management is indispensable in order to address and prevent these problems, so that the cost,the &amp;nbsp;quality and the time agreed upon can be realized. Cost and time relationship is not directly proportional, so it is necessary to determine the optimal time by optimum cost. Optimization is a best effort undertaken by planning various alternative methods of implementation, in order to obtain optimal timing of projects with optimum cost. Planning and scheduling are the backbone of the entire project, which is based on clear objectives. Microsoft Project as one of the scheduling software based on Precedence Diagram Method (PDM) provides many advantages, one of which scheduling can be done more quickly and thoroughly.In this research, it is created six alternative models as follows: In the first alternative ,it is &amp;nbsp;acquired &amp;nbsp;the project period of 256 days , at a cost of Rp2,190,234,913.43 ; In the second alternative , the was obtained the project period of 150 days , with a cost of Rp1,903,674,873.6 ; In the third alternative , it was obtained the project period of 102 days , at a cost of Rp1,873,215,897.61 ; In the alternative IV , it was obtained&amp;nbsp; the project period of &amp;nbsp;99 days , at a cost of Rp1,895,159,526.12 ; In the alternative V , the project period was 96 days , at a cost of Rp2,019,623,191.13 ; In alternate VI , the project period was 89 days at a cost of Rp2,090,543,033.77. From the above calculation, then the result is interpolated in order to obtain the optimum time for the development project. The optimum time obtained is 120 calendar days, at a cost of Rp. 1,884,638,013.61.</dc:description>
	<dc:publisher xml:lang="en-US">Pusat Penelitian dan Pengabdian kepada Masyarakat (P3M) Politeknik Negeri Bali</dc:publisher>
	<dc:date>2018-07-30</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs.pnb.ac.id/index.php/LOGIC/article/view/973</dc:identifier>
	<dc:identifier>10.31940/logic.v18i2.973</dc:identifier>
	<dc:source xml:lang="en-US">Logic : Jurnal Rancang Bangun dan Teknologi; Vol 18 No 2 (2018): July; 64-71</dc:source>
	<dc:source>2580-5649</dc:source>
	<dc:source>1412-114X</dc:source>
	<dc:source>10.31940/logic.v18i2</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs.pnb.ac.id/index.php/LOGIC/article/view/973/775</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2018 LOGIC Jurnal Rancang Bangun dan Teknologi</dc:rights>
</oai_dc:dc>