Melola Discovery

← Melola Discovery

Jurnal SINTA 3

Technical analysis of power factor improvement using ETAP 12.6 at Regent Resort & Holiday Inn Canggu

Matrix: Jurnal Manajemen Teknologi dan Informatika · Vol. 12 No. 1 (2022) · hlm. 38–50

DOI
10.31940/matrix.v12i1.38-50
ISSN
2580-5630, 2088-284X
Terbit
2022-03-29
Penerbit
Unit Publikasi Ilmiah, P3M, Politeknik Negeri Bali
Bahasa
eng

Abstrak

Due to the increase of inductive load will cause a decrease in the power factor which in turn affects the distribution of electrical energy. The power factor improvement method was chosen by the Regent of Resort & Holiday Inn Canggu to meet the PLN Standard, SPLN 70-1, namely: the power factor must be > 0.85 is to install a capacitor bank. In addition to increasing the power factor, the installation of this capacitor bank is also expected to reduce power losses and voltage drops and avoid excess kVARh charges imposed by PLN. Through calculations and simulations using the ETAP 12.6 application, it is obtained that; To increase the power factor close to 0.95, 900kVAR power is required from the capacitor bank installed in LVMDP1 and LMPDP2 to compensate for the reactive power of 875.44 kVAR and 860.92 kVAR, respectively. The capacity of the capacitor bank required for LVMDP1 and LVMDP2 is 19.85 x 10-3 Farad, with a capacity value for each step of 2.20 x 10-3 Farad. By installing a capacitor bank on LVMDP1 and LVMDP2, it can increase the power factor to 0.94 and 0.95 respectively, and reduce the percentage of reactive power usage to active power to 34.3% and 34.7%.

Kata kunci

Jaringan kolaborasi para penulis

5 penulis · 5 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Politeknik Negeri Bali
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Ni Wayan WisswaniPoliteknik Negeri Bali2
Putu Martin Puja YogaPoliteknik Negeri Bali1
I Gusti Putu Mastawan Eka PutraPoliteknik Negeri Bali1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://ojs2.pnb.ac.id/index.php/MATRIX/oai, pertama di-harvest 19 Nov 2026, terakhir terlihat 19 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Technical analysis of power factor improvement using ETAP 12.6 at Regent Resort &amp; Holiday Inn Canggu</dc:title>
	<dc:creator>Karmiathi, Ni Made</dc:creator>
	<dc:creator>Adiana Putra   , I Kadek </dc:creator>
	<dc:subject xml:lang="en-US">capacitor bank</dc:subject>
	<dc:subject xml:lang="en-US">power factor</dc:subject>
	<dc:subject xml:lang="en-US">reactive power</dc:subject>
	<dc:description xml:lang="en-US">Due to the increase of inductive load will cause a decrease in the power factor which in turn affects the distribution of electrical energy. The power factor improvement method was chosen by the Regent of Resort &amp;amp; Holiday Inn Canggu to meet the PLN Standard, SPLN 70-1, namely: the power factor must be &amp;gt; 0.85 is to install a capacitor bank. In addition to increasing the power factor, the installation of this capacitor bank is also expected to reduce power losses and voltage drops and avoid excess kVARh charges imposed by PLN. Through calculations and simulations using the ETAP 12.6 application, it is obtained that; To increase the power factor close to 0.95, 900kVAR power is required from the capacitor bank installed in LVMDP1 and LMPDP2 to compensate for the reactive power of 875.44 kVAR and 860.92 kVAR, respectively. The capacity of the capacitor bank required for LVMDP1 and LVMDP2 is 19.85 x 10-3 Farad, with a capacity value for each step of 2.20 x 10-3 Farad. By installing a capacitor bank on LVMDP1 and LVMDP2, it can increase the power factor to 0.94 and 0.95 respectively, and reduce the percentage of reactive power usage to active power to 34.3% and 34.7%.</dc:description>
	<dc:publisher xml:lang="en-US">Unit Publikasi Ilmiah, P3M, Politeknik Negeri Bali</dc:publisher>
	<dc:date>2022-03-29</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs2.pnb.ac.id/index.php/MATRIX/article/view/402</dc:identifier>
	<dc:identifier>10.31940/matrix.v12i1.38-50</dc:identifier>
	<dc:source xml:lang="en-US">Matrix : Jurnal Manajemen Teknologi dan Informatika; Vol. 12 No. 1 (2022): Matrix: Jurnal Manajemen Teknologi dan Informatika; 38-50</dc:source>
	<dc:source>2580-5630</dc:source>
	<dc:source>2088-284X</dc:source>
	<dc:source>10.31940/matrix.v12i1</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs2.pnb.ac.id/index.php/MATRIX/article/view/402/209</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2022 Matrix : Jurnal Manajemen Teknologi dan Informatika</dc:rights>
	<dc:rights xml:lang="en-US">https://scholar.google.co.id/citations?user=NDE5gXYAAAAJ&amp;hl=id</dc:rights>
</oai_dc:dc>