Melola Discovery

← Melola Discovery

Akses terbuka Jurnal SINTA 1

Effort Estimation For Software Development On Mobile Application Of 'Tangkap Reptil'

JURNAL INFOTEL · Vol. 11 No. 4 (2019)

DOI
10.20895/infotel.v11i4.459
ISSN
2085-3688, 2460-0997
Terbit
2019-12-30
Penerbit
LPPM Institut Teknologi Telkom Purwokerto
Bahasa
en
Lisensi
creativecommons.org/licenses/by-sa/4.0/

Abstrak

An essential aspect of planning and management of software design projects is to estimate work time, costs, and human resources. The calculation solution made in this study aims to assist in calculating the estimated time of developing a reptile capture application using the Use Case Point (UCP) method. The UCP method is a software effort estimation method that shows better performance compared to other methods. The result of this research is the risk of software development on the mobile application of 'Tangkap Reptil' has a small chance, can be done in a relatively short time, and does not require a lot of resources.

Kata kunci

Jaringan kolaborasi para penulis

7 penulis · 11 tautan kepenulisan bersama · 3 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Institut Teknologi Telkom Purwokerto
  • Dili Institute of Technology
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Ariq Cahya WardhanaInstitut Teknologi Telkom Purwokerto2
Tenia WahyuningrumInstitut Teknologi Telkom Purwokerto1
Teotino Gomes SoaresDili Institute of Technology1
Wahyu Andi SaputraInstitut Teknologi Telkom Purwokerto1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OpenAlex API (jurnal SINTA, ADR 0048) https://openalex.org/S4210188896, pertama di-harvest 19 Nov 2026, terakhir terlihat 19 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title xml:lang="en">Effort Estimation For Software Development On Mobile Application Of 'Tangkap Reptil'</dc:title><dc:creator>Condro Kartiko</dc:creator><dc:creator>Novanda Alim Setya Nugraha</dc:creator><dc:creator>Dery Sudrajat</dc:creator><dc:subject>software effort estimation</dc:subject><dc:subject>use case points</dc:subject><dc:subject>mobile application</dc:subject><dc:subject>software project planning</dc:subject><dc:subject>project risk assessment</dc:subject><dc:description xml:lang="en">An essential aspect of planning and management of software design projects is to estimate work time, costs, and human resources. The calculation solution made in this study aims to assist in calculating the estimated time of developing a reptile capture application using the Use Case Point (UCP) method. The UCP method is a software effort estimation method that shows better performance compared to other methods. The result of this research is the risk of software development on the mobile application of 'Tangkap Reptil' has a small chance, can be done in a relatively short time, and does not require a lot of resources.</dc:description><dc:publisher>LPPM Institut Teknologi Telkom Purwokerto</dc:publisher><dc:date>2019-12-30</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.20895/infotel.v11i4.459</dc:identifier><dc:identifier>10.20895/infotel.v11i4.459</dc:identifier><dc:source>JURNAL INFOTEL; Vol 11 No 4 (2019)</dc:source><dc:source>2085-3688</dc:source><dc:source>2460-0997</dc:source><dc:language>en</dc:language><dc:relation>https://ejournal.st3telkom.ac.id/index.php/infotel/article/download/459/271</dc:relation><dc:rights>https://creativecommons.org/licenses/by-sa/4.0/</dc:rights></oai_dc:dc>