Akses terbuka
Jurnal
SINTA 1
The Reconfiguration of Network at 20 kV Distribution System Nagan Raya Substation with the Addition of the Krueng Isep Hydroelectric Power Plant
Jurnal Nasional Teknik Elektro · Vol. 10 No. 2 (2021)
ISSN 2302-2949, 2407-7267
Terbit 2021-07-01
Penerbit Andalas University
Bahasa en
Abstrak
Switching substations are usually supplied from one express feeder which can cause a low level of reliability due to disruption or outage on the express feeder. Also, the lack of power supply at the ends of the network causes voltage drops. One way to solve this problem is to reconfigure the network. In this study, testing was carried out on a distribution system in the Nagan Raya Regency, namely the distribution system of PT. PLN (Persero) ULP Jeuram originally had a radial system. Furthermore, the distribution system was reconfigured with the Krueng Isep hydroelectric power plant which was included in the PLN ULP Jeuram grid so that the system that was originally radial became a loop configuration. The method used in analyzing the network reconfiguration process is to use the ETAP 12.6 application. As a result, after reconfiguring the network the voltage increased from 19.2 kV to 20.7 kV, the highest increase was at the Beutong Substation which reached 1.5 kV and decreased power losses in the network with a total of 188.2 kW and 263.1 kVAR. Furthermore, before the network reconfiguration, ULP Jeuram SAIFI value was 22.25 times/customers and SAIDI values 1337.74 minutes/ customers. However, after reconfiguring the network, ULP Jeuram SAIFI value fell to 15.39 times/customers and SAIDI to 945.6 minutes/customers, resulting in an increase in system reliability by 70.69%. Keyword: Reconfiguration of network, distribution system, hydroelectric power plant, SAIDI, SAIFI
Jaringan kolaborasi para penulis
17 penulis ·
39 tautan kepenulisan bersama
· 21 lintas organisasi
Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.
Malikussaleh University Tanjungpura University Universitas Iskandar Muda Politeknik Negeri Lhokseumawe Universitas Jambi Hasanuddin University Institut Teknologi PLN Afiliasi tidak diketahui
Organisasi berbeda
Organisasi sama
Afiliasi tidak diketahui
Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.
Sumber metadata: OpenAlex API (jurnal SINTA, ADR 0048) https://openalex.org/S4210175326, pertama di-harvest 20 Nov 2026, terakhir terlihat 20 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title xml:lang="en">The Reconfiguration of Network at 20 kV Distribution System Nagan Raya Substation with the Addition of the Krueng Isep Hydroelectric Power Plant</dc:title><dc:creator>Ediwan Ediwan</dc:creator><dc:creator>Muliadi Muliadi</dc:creator><dc:creator>Mahalla Mahalla</dc:creator><dc:creator>Nazaruddin Nazaruddin</dc:creator><dc:creator>Andi Mulkan</dc:creator><dc:subject>distribution network reconfiguration</dc:subject><dc:subject>20 kV distribution network</dc:subject><dc:subject>loop configuration</dc:subject><dc:subject>radial distribution systems</dc:subject><dc:subject>power losses</dc:subject><dc:subject>voltage drop</dc:subject><dc:subject>SAIFI</dc:subject><dc:subject>SAIDI</dc:subject><dc:subject>power supply reliability</dc:subject><dc:description xml:lang="en">Switching substations are usually supplied from one express feeder which can cause a low level of reliability due to disruption or outage on the express feeder. Also, the lack of power supply at the ends of the network causes voltage drops. One way to solve this problem is to reconfigure the network. In this study, testing was carried out on a distribution system in the Nagan Raya Regency, namely the distribution system of PT. PLN (Persero) ULP Jeuram originally had a radial system. Furthermore, the distribution system was reconfigured with the Krueng Isep hydroelectric power plant which was included in the PLN ULP Jeuram grid so that the system that was originally radial became a loop configuration. The method used in analyzing the network reconfiguration process is to use the ETAP 12.6 application. As a result, after reconfiguring the network the voltage increased from 19.2 kV to 20.7 kV, the highest increase was at the Beutong Substation which reached 1.5 kV and decreased power losses in the network with a total of 188.2 kW and 263.1 kVAR. Furthermore, before the network reconfiguration, ULP Jeuram SAIFI value was 22.25 times/customers and SAIDI values 1337.74 minutes/ customers. However, after reconfiguring the network, ULP Jeuram SAIFI value fell to 15.39 times/customers and SAIDI to 945.6 minutes/customers, resulting in an increase in system reliability by 70.69%. Keyword: Reconfiguration of network, distribution system, hydroelectric power plant, SAIDI, SAIFI</dc:description><dc:publisher>Andalas University</dc:publisher><dc:date>2021-07-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.25077/jnte.v10n2.888.2021</dc:identifier><dc:identifier>10.25077/jnte.v10n2.888.2021</dc:identifier><dc:source>Jurnal Nasional Teknik Elektro; Vol 10 No 2 (2021)</dc:source><dc:source>2302-2949</dc:source><dc:source>2407-7267</dc:source><dc:language>en</dc:language><dc:relation>http://jnte.ft.unand.ac.id/index.php/jnte/article/download/888/423</dc:relation><dc:rights>https://creativecommons.org/licenses/by-sa/4.0/</dc:rights></oai_dc:dc>
Sitasi dan pengindeksan
OpenAlex
Terindeks
lewat ID karya OpenAlex (record dari sumber OpenAlex)
12 sitasi
Crossref
Belum diperiksa
Jumlah menurut tiap indeks pada 20 Nov 2026; setiap indeks menghitung sitasi dengan cara berbeda.
OpenAlex juga mencatat karya ini di: crossref, doaj.
Sitasi artikel ini
APA 7
Ediwan, E., Muliadi, M., Mahalla, M., Nazaruddin, N., & Mulkan, A. (2021). The Reconfiguration of Network at 20 kV Distribution System Nagan Raya Substation with the Addition of the Krueng Isep Hydroelectric Power Plant. Jurnal Nasional Teknik Elektro, 10(2). https://doi.org/10.25077/jnte.v10n2.888.2021
Salin
IEEE
E. Ediwan, M. Muliadi, M. Mahalla, N. Nazaruddin, and A. Mulkan, “The Reconfiguration of Network at 20 kV Distribution System Nagan Raya Substation with the Addition of the Krueng Isep Hydroelectric Power Plant,” Jurnal Nasional Teknik Elektro, vol. 10, no. 2, 2021, doi: 10.25077/jnte.v10n2.888.2021.
Salin
Dibuat dari metadata jurnal; periksa nama penulis sebelum dipakai.