Melola Discovery

← Melola Discovery

Akses terbuka Jurnal SINTA 1

Performance and Techno-economic Analysis of a 1.82 kWp Rooftop PV System in the Tropical Climate of Indonesia: A Simulation vs Reality Approach

Jurnal Nasional Teknik Elektro (2026)

DOI
10.25077/jnte.v15n1.1427.2026
ISSN
2302-2949, 2407-7267
Terbit
2026-03-29
Penerbit
Andalas University
Bahasa
en
Lisensi
creativecommons.org/licenses/by-nc-sa/4.0/

Abstrak

The utilization of renewable energy through rooftop photovoltaic (PV) systems serves as a strategic solution for mitigating climate change; however, their performance in tropical climates often exhibits a deviation between theoretical predictions and field reality. This study aims to evaluate the technical performance and economic viability of an on-grid 1.82 kWp rooftop PV system in Indonesia. The research employs a comparative quantitative approach by validating PVsyst simulation results against actual measurement data recorded from April to July 2024. The findings indicate a simulation overestimation, where actual energy production was 30.3% to 40.5% lower than PVsyst projections. A significant discrepancy was also observed in the Performance Ratio (PR), with the actual PR reaching only 55-59%, substantially lower than the simulated 81-82%. Despite these technical inconsistencies, the economic analysis confirms the project's financial feasibility. Under a 5.25% interest rate scenario, the study yielded a Net Present Value (NPV) of IDR 15.88 million, a Benefit-Cost Ratio (BCR) of 1.50, a Payback Period of 9.8 years, and a Levelized Cost of Electricity (LCOE) of IDR 974.88/kWh, more competitive than the national utility (PLN) tariffs. In conclusion, although tropical environmental factors such as high temperatures and dust accumulation reduce technical efficiency, rooftop PV investment in Indonesia maintains strong profitability and remains viable for implementation.

Kata kunci

Jaringan kolaborasi para penulis

35 penulis · 122 tautan kepenulisan bersama · 55 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Universiti Malaysia Sarawak
  • Jakarta Global University
  • Universitas Trisakti
  • Universitas Lancang Kuning
  • Politeknik Negeri Semarang
  • Universitas Negeri Padang
  • Gulf University
  • Organisasi lain
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Ermanu Azizul HakimUniversitas Muhammadiyah Malang2
Dwiana HendrawatiPoliteknik Negeri Semarang2
Ahmad Kholik SulistyoPoliteknik Negeri Semarang2
Dianing Novita Nurmala PutriUniversitas Trisakti1
Tyas Kartika SariUniversitas Trisakti1
Maula Sukma WidjajaUniversitas Trisakti1
Chairul Gagarin IriantoUniversitas Trisakti1
Yanuar Zulardiansyah AriefUniversity of Technology Malaysia1
David SetiawanUniversitas Lancang Kuning1
Atmam AtmamUniversitas Lancang Kuning1
Hendri MasdiUniversitas Negeri Padang1
Yusri JumatUniversiti Malaysia Sarawak1
Yanuar Z. AriefUniversiti Malaysia Sarawak1
Valentine M. A. A. JabuUniversiti Malaysia Sarawak1
Sharifah Masniah Wan MasraUniversiti Malaysia Sarawak1
Nurul I. HashimUniversiti Malaysia Sarawak1
S. K. SahariUniversiti Malaysia Sarawak1
N. JunaidiUniversiti Malaysia Sarawak1
S. RufusUniversiti Malaysia Sarawak1
Sinka WilyantiUniversitas Negeri Padang1
Taopik HidayatJakarta Global University1
Sinka WilyantiJakarta Global University1
M. N. MohammedGulf University1
Devan Junesco VresdianJakarta Global University1
Dian Tresna NugrahaJakarta Global University1
Ariep JaneulJakarta Global University1
Abir OktavianiJakarta Global University1
M. N. MohammedGulf University1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OpenAlex API (jurnal SINTA, ADR 0048) https://openalex.org/S4210175326, pertama di-harvest 20 Nov 2026, terakhir terlihat 20 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title xml:lang="en">Performance and Techno-economic Analysis of a 1.82 kWp Rooftop PV System in the Tropical Climate of Indonesia: A Simulation vs Reality Approach</dc:title><dc:creator>Rifaldi Wahyu Santoso</dc:creator><dc:creator>‪Brainvendra Widi Dionova</dc:creator><dc:creator>Hamzah Eteruddin</dc:creator><dc:creator>Kalvin Saputra</dc:creator><dc:creator>Oo Abdul Rosyid</dc:creator><dc:creator>Fariz Maulana Rizanulhaq</dc:creator><dc:creator>Muhammad Irsyad Abdullah</dc:creator><dc:subject>rooftop photovoltaic systems</dc:subject><dc:subject>tropical climate</dc:subject><dc:subject>PV performance prediction</dc:subject><dc:subject>performance ratio</dc:subject><dc:subject>techno-economic analysis</dc:subject><dc:subject>levelized cost of electricity</dc:subject><dc:subject>payback period</dc:subject><dc:subject>benefit-cost ratio</dc:subject><dc:subject>net present value</dc:subject><dc:subject>dust accumulation</dc:subject><dc:subject>high temperature effects</dc:subject><dc:subject>Indonesia</dc:subject><dc:description xml:lang="en">The utilization of renewable energy through rooftop photovoltaic (PV) systems serves as a strategic solution for mitigating climate change; however, their performance in tropical climates often exhibits a deviation between theoretical predictions and field reality. This study aims to evaluate the technical performance and economic viability of an on-grid 1.82 kWp rooftop PV system in Indonesia. The research employs a comparative quantitative approach by validating PVsyst simulation results against actual measurement data recorded from April to July 2024. The findings indicate a simulation overestimation, where actual energy production was 30.3% to 40.5% lower than PVsyst projections. A significant discrepancy was also observed in the Performance Ratio (PR), with the actual PR reaching only 55-59%, substantially lower than the simulated 81-82%. Despite these technical inconsistencies, the economic analysis confirms the project's financial feasibility. Under a 5.25% interest rate scenario, the study yielded a Net Present Value (NPV) of IDR 15.88 million, a Benefit-Cost Ratio (BCR) of 1.50, a Payback Period of 9.8 years, and a Levelized Cost of Electricity (LCOE) of IDR 974.88/kWh, more competitive than the national utility (PLN) tariffs. In conclusion, although tropical environmental factors such as high temperatures and dust accumulation reduce technical efficiency, rooftop PV investment in Indonesia maintains strong profitability and remains viable for implementation.</dc:description><dc:publisher>Andalas University</dc:publisher><dc:date>2026-03-29</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:identifier>https://doi.org/10.25077/jnte.v15n1.1427.2026</dc:identifier><dc:identifier>10.25077/jnte.v15n1.1427.2026</dc:identifier><dc:source>Jurnal Nasional Teknik Elektro; (2026)</dc:source><dc:source>2302-2949</dc:source><dc:source>2407-7267</dc:source><dc:language>en</dc:language><dc:rights>https://creativecommons.org/licenses/by-nc-sa/4.0/</dc:rights></oai_dc:dc>