Melola Discovery

← Melola Discovery

Akses terbuka Jurnal SINTA 1

Koordinasi Sistem Proteksi Arus Lebih Pada Penyulang Distribusi 20 kV GI Pauh Limo

Jurnal Nasional Teknik Elektro · Vol. 4 No. 2 (2015) · hlm. 140–140

DOI
10.25077/jnte.v4n2.144.2015
ISSN
2302-2949, 2407-7267
Terbit
2015-06-04
Penerbit
Andalas University
Bahasa
id
Lisensi
creativecommons.org/licenses/by-nc-sa/4.0/

Abstrak

The 20 kV feeder outages typically caused by short circuit fault. If the setting of over current relay (OCR) in the incoming or outgoing feeder unfavorable, can cause a total blackout. One of the efforts can be done is to evaluate the settings of 20 kV feeder protection relays in distribution substations Pauh Limo, to be well coordinated with each other and expected if an interruption in one of the 20 kV feeders it will not bring interrupt on the other feeders.Based on the short circuit current analysis on each feeder, where the largest short circuit fault current for three-phase fault at feeder Tingga Koto, the fault location 1%, which amounted to 7326.99 Ampere. This is because the line to Koto Tingga shortest compared to other feeders, around 9 km and load current = 230 Ampere. The OCR working time at the feeders id: Kuranji = 0.3 s Koto Tingga = 0.298 s, Teluk Bayur-2 = 0.292 s, Teluk Bayur-1 = 0.3 s, BLKI = 0.3 s, Kandis = 0.3 s and feeder UNAND = 0, 3 s. The relay working time for incoming side is 0.7 seconds. This relay setting can be used as a reference of evaluation and resetting of OCR.Keywords: Short circuit fault, Over current relay, Relay setting.ABSTRAK—Pada penyulang 20 kV biasanya pemadaman disebabkan oleh gangguan hubung singkat. Jika penyetelan over current relay (OCR) di sisi incoming atau di outgoing kurang baik, dapat menyebabkan pemadaman total (black out). Salah satu upaya yang dilakukan adalah dengan mengevaluasi setting relai proteksi pada penyulang distribusi 20 kV gardu induk Pauh Limo, sehingga saling terkoordinasi dengan baik dan diharapkan jika terjadi gangguan pada salah satu penyulang 20 kV maka tidak akan membawa black out pada penyulang yang lain.Berdasarkan analisa arus hubung singkat disetiap penyulang, dimana arus gangguan hubung singkat 3 fasa terbesar yaitu pada penyulang Koto Tingga, dengan lokasi gangguan 1 %, yaitu sebesar 7326,99 Ampere. Hal ini dikarenakan saluran Koto Tingga terpendek dibandingkan dengan penyulang lain, yaitu = 9 km dan arus beban = 230 Amper. Waktu kerja relai pada penyulang (detik): Kuranji = 0,3, Koto Tingga = 0,298, Teluk Bayur-2 = 0,292, Teluk Bayur-1 = 3, BLKI = 0,3, Kandis = 0,3 dan penyulang UNAND = 0,3. Pada sisi incoming waktu kerja relai adalah 0,7 detik. Setting relai ini dapat digunakan sebagai referensi dalam evaluasi dan setting ulang OCR.Kata Kunci: Gangguan hubung singkat, Relai arus lebih, setting relai..

Kata kunci

Jaringan kolaborasi para penulis

18 penulis · 34 tautan kepenulisan bersama · 13 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Andalas University
  • Universitas Bung Hatta
  • Bandung Institute of Technology
  • Sumatera Institute of Technology
  • Universitas Negeri Padang
  • Universitas Ekasakti
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Akbar AbadiAndalas University1
Hanalde AndreAndalas University1
Kiki KanandaSumatera Institute of Technology1
Agus Rahmad TimorAndalas University1
Zulka HendriAndalas University1
KhairullahAfiliasi tidak diketahui1
AsrizalAfiliasi tidak diketahui1
Syukri YunusAndalas University1
CahayahatiUniversitas Bung Hatta1
Ija DarmanaUniversitas Bung Hatta1
ZulwisliUniversitas Negeri Padang1
Edyan NoveriAfiliasi tidak diketahui1
Ricky MaulanaAndalas University1
Heru Dibyo LaksonoAndalas University1
Aidil DanasUniversitas Ekasakti1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OpenAlex API (jurnal SINTA, ADR 0048) https://openalex.org/S4210175326, pertama di-harvest 20 Nov 2026, terakhir terlihat 20 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title xml:lang="id">Koordinasi Sistem Proteksi Arus Lebih Pada Penyulang Distribusi 20 kV GI Pauh Limo</dc:title><dc:creator>Erliwati</dc:creator><dc:creator>Syafi’i</dc:creator><dc:creator>Muhammad Nurdin</dc:creator><dc:subject>overcurrent relays</dc:subject><dc:subject>relay coordination</dc:subject><dc:subject>20 kV distribution feeder</dc:subject><dc:subject>short-circuit faults</dc:subject><dc:subject>relay setting</dc:subject><dc:subject>relay operating time</dc:subject><dc:description xml:lang="id">The 20 kV feeder outages typically caused by short circuit fault. If the setting of over current relay (OCR) in the incoming or outgoing feeder unfavorable, can cause a total blackout. One of the efforts can be done is to evaluate the settings of 20 kV feeder protection relays in distribution substations Pauh Limo, to be well coordinated with each other and expected if an interruption in one of the 20 kV feeders it will not bring interrupt on the other feeders.Based on the short circuit current analysis on each feeder, where the largest short circuit fault current for three-phase fault at feeder Tingga Koto, the fault location 1%, which amounted to 7326.99 Ampere. This is because the line to Koto Tingga shortest compared to other feeders, around 9 km and load current = 230 Ampere. The OCR working time at the feeders id: Kuranji = 0.3 s Koto Tingga = 0.298 s, Teluk Bayur-2 = 0.292 s, Teluk Bayur-1 = 0.3 s, BLKI = 0.3 s, Kandis = 0.3 s and feeder UNAND = 0, 3 s. The relay working time for incoming side is 0.7 seconds. This relay setting can be used as a reference of evaluation and resetting of OCR.Keywords : Short circuit fault, Over current relay, Relay setting.ABSTRAK—Pada penyulang 20 kV biasanya pemadaman disebabkan oleh gangguan hubung singkat. Jika penyetelan over current relay (OCR) di sisi incoming atau di outgoing kurang baik, dapat menyebabkan pemadaman total (black out). Salah satu upaya yang dilakukan adalah dengan mengevaluasi setting relai proteksi pada penyulang distribusi 20 kV gardu induk Pauh Limo, sehingga saling terkoordinasi dengan baik dan diharapkan jika terjadi gangguan pada salah satu penyulang 20 kV maka tidak akan membawa black out pada penyulang yang lain.Berdasarkan analisa arus hubung singkat disetiap penyulang, dimana arus gangguan hubung singkat 3 fasa terbesar yaitu pada penyulang Koto Tingga, dengan lokasi gangguan 1 %, yaitu sebesar 7326,99 Ampere. Hal ini dikarenakan saluran Koto Tingga terpendek dibandingkan dengan penyulang lain, yaitu = 9 km dan arus beban = 230 Amper. Waktu kerja relai pada penyulang (detik) : Kuranji = 0,3, Koto Tingga = 0,298, Teluk Bayur-2 = 0,292, Teluk Bayur-1 = 3, BLKI = 0,3, Kandis = 0,3 dan penyulang UNAND = 0,3. Pada sisi incoming waktu kerja relai adalah 0,7 detik. Setting relai ini dapat digunakan sebagai referensi dalam evaluasi dan setting ulang OCR.Kata Kunci : Gangguan hubung singkat, Relai arus lebih, setting relai..</dc:description><dc:publisher>Andalas University</dc:publisher><dc:date>2015-06-04</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.25077/jnte.v4n2.144.2015</dc:identifier><dc:identifier>10.25077/jnte.v4n2.144.2015</dc:identifier><dc:source>Jurnal Nasional Teknik Elektro; Vol 4 No 2 (2015); 140-140</dc:source><dc:source>2302-2949</dc:source><dc:source>2407-7267</dc:source><dc:language>id</dc:language><dc:relation>http://jnte.ft.unand.ac.id/index.php/jnte/article/download/144/182</dc:relation><dc:rights>https://creativecommons.org/licenses/by-nc-sa/4.0/</dc:rights></oai_dc:dc>