KETERLAMBATAN WAKTU PELAKSANAAN PROYEK KLASIFIKASI DAN PERINGKAT DARI PENYEBAB-PENYEBABNYA

Civil Engineering Dimension · Vol. 1 No. 1 (2004) · hlm. 46–58

ISSN
1410-9530, 1979-570X
Terbit
2004-06-01
Penerbit
Petra Christian University
Bahasa
id
Lisensi
creativecommons.org/licenses/by/4.0/

Abstrak

Successfully executing construction project within schedule is one of the most important aims, both for the owner and the contractor. Construction delay is a condition which is completely unwanted, because it will cause lost of money and time for both parties. Research in finding factors which are dominant or having great influences as the causes of delay, is intended to prepare and build the construction planning and scheduling more complete and accurate; so that delay can be avoided or controlled. Confirmation to the founded causes by site surveys using questionaire distributed to contractors, have shown that problems arisen from inaccurate workplan, lack of resources. lack of communication/coordination, were dominant factors for causing construction delay from contractor side. On the other hand, the owner side, problems arisen from incomplete and unclear design and scope of works, inspection and control system of the project were dominant for causing delay. Abstract in Bahasa Indonesia: Keberhasilan melaksanakan proyek konstruksi tepat pada waktunya adalah salah satu tujuan terpenting, baik bagi pemilik maupun kontraktor. Keterlambatan adalah sebuah kondisi yang sangat tidak dikehendaki, karena akan sangat merugikan kedua belah pihak dari segi waktu dan biaya. Penelitian ini bertujuan menemukan faktor-faktor yang sangat berperan atau mendominasi sebagai penyebab keterlambatan, dengan maksud agar proses perencanaan dan penjadwalan proyek konstruksi dapat dilakukan dengan lebih lengkap dan cermat; sehingga keterlambatan sedapat mungkin dihindarkan atau dikendalikan. Temuan penyebab-penyebab keterlambatan, yang dikonfirmasikan dengan sigi lapangan menggunakan kuesioner yang didistribusikan kepada kontraktor, menunjukkan bahwa masalah-masalah tidak seksamanya rencana kerja, tidak tersedianya sumber daya dan kurangnya komunikasi/koordinasi, merupakan faktor-faktor yang dominan sebagai penyebab keterlamabatan dari sisi kontraktor. Dari sisi pemilik proyek, masalah ketidaklengkapan dan ketidakjelasan desain dan lingkup pekerjaan, masalah sistim pengawasan dan pengendalian proyek, merupakan faktor yang dominan sebagai penyebab keterlambatan. Kata kunci: keterlambatan pelaksanaan, penyebab keterlambatan, perencanaan dan penjadwalan, kontraktor, pemilik

Kata kunci

Jaringan kolaborasi para penulis

Belum ada rekan penulis di Melola.

Sumber metadata: OpenAlex API (jurnal SINTA, ADR 0048) https://openalex.org/S2765058718, pertama di-harvest 20 Nov 2026, terakhir terlihat 20 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title xml:lang="id">KETERLAMBATAN WAKTU PELAKSANAAN PROYEK KLASIFIKASI DAN PERINGKAT DARI PENYEBAB-PENYEBABNYA</dc:title><dc:creator>Budiman Proboyo</dc:creator><dc:subject>construction delays</dc:subject><dc:subject>delay causes</dc:subject><dc:subject>construction scheduling</dc:subject><dc:subject>construction planning</dc:subject><dc:subject>lack of resources</dc:subject><dc:subject>communication and coordination</dc:subject><dc:subject>incomplete designs</dc:subject><dc:subject>construction project management</dc:subject><dc:subject>construction safety control</dc:subject><dc:description xml:lang="id">Successfully executing construction project within schedule is one of the most important aims, both for the owner and the contractor. Construction delay is a condition which is completely unwanted, because it will cause lost of money and time for both parties. Research in finding factors which are dominant or having great influences as the causes of delay, is intended to prepare and build the construction planning and scheduling more complete and accurate; so that delay can be avoided or controlled. Confirmation to the founded causes by site surveys using questionaire distributed to contractors, have shown that problems arisen from inaccurate workplan, lack of resources. lack of communication/coordination, were dominant factors for causing construction delay from contractor side. On the other hand, the owner side, problems arisen from incomplete and unclear design and scope of works, inspection and control system of the project were dominant for causing delay. Abstract in Bahasa Indonesia : Keberhasilan melaksanakan proyek konstruksi tepat pada waktunya adalah salah satu tujuan terpenting, baik bagi pemilik maupun kontraktor. Keterlambatan adalah sebuah kondisi yang sangat tidak dikehendaki, karena akan sangat merugikan kedua belah pihak dari segi waktu dan biaya. Penelitian ini bertujuan menemukan faktor-faktor yang sangat berperan atau mendominasi sebagai penyebab keterlambatan, dengan maksud agar proses perencanaan dan penjadwalan proyek konstruksi dapat dilakukan dengan lebih lengkap dan cermat; sehingga keterlambatan sedapat mungkin dihindarkan atau dikendalikan. Temuan penyebab-penyebab keterlambatan, yang dikonfirmasikan dengan sigi lapangan menggunakan kuesioner yang didistribusikan kepada kontraktor, menunjukkan bahwa masalah-masalah tidak seksamanya rencana kerja, tidak tersedianya sumber daya dan kurangnya komunikasi/koordinasi, merupakan faktor-faktor yang dominan sebagai penyebab keterlamabatan dari sisi kontraktor. Dari sisi pemilik proyek, masalah ketidaklengkapan dan ketidakjelasan desain dan lingkup pekerjaan, masalah sistim pengawasan dan pengendalian proyek, merupakan faktor yang dominan sebagai penyebab keterlambatan. Kata kunci : keterlambatan pelaksanaan, penyebab keterlambatan, perencanaan dan penjadwalan, kontraktor, pemilik</dc:description><dc:publisher>Petra Christian University</dc:publisher><dc:date>2004-06-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:identifier>http://ced.petra.ac.id/index.php/civ/article/download/15507/19974</dc:identifier><dc:source>Civil Engineering Dimension; Vol 1 No 1 (2004); 46-58</dc:source><dc:source>1410-9530</dc:source><dc:source>1979-570X</dc:source><dc:language>id</dc:language><dc:rights>https://creativecommons.org/licenses/by/4.0/</dc:rights></oai_dc:dc>